ratulpuri

Ratul Puri: Beyond Low-Cost Power to Clean Energy Reliability

Aug 17th, 2026
35
6
Never
9
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 6.00 KB | None | 6 0
  1. Ratul Puri, Chairman, Hindustan Power
  2.  
  3. India’s renewable energy story is entering a new phase. Competitive tariff auctions, declining costs and strong investments have helped renewable energy become mainstream. As renewable capacity continues to grow, greater attention is now being given to how this power can be stored, transmitted and delivered when it is needed.
  4. According to Ratul Puri, Chairman of Hindustan Power, India’s energy landscape is undergoing a structural shift from prioritising the lowest cost renewable generation to building a power system that delivers dependable, dispatchable and affordable clean energy. As renewable energy penetration increases, the power sector can no longer remain focused only on adding generation capacity. The emphasis is increasingly on how effectively that capacity can serve the wider power system and meet rising electricity demand. This is particularly relevant as India progresses towards its 2030 non-fossil fuel capacity goals. Renewable energy procurement is therefore gradually moving beyond a lowest tariff approach to one that considers the value of dependable power, balancing capability and long-term system economics.
  5. This also changes how the cost of renewable power needs to be assessed. Evaluating projects solely on tariff competitiveness is no longer sufficient as renewable integration grows. Transmission constraints, intermittency, balancing requirements, storage needs and curtailment risks all have a bearing on the actual cost of delivering power. This makes a lowest systemic cost approach increasingly relevant.
  6.  
  7. Chairman Ratul Puri says that Storage-backed renewable and hybrid projects may carry a higher upfront cost but can reduce pressure on the wider power system, improve the utilisation of renewable energy and strengthen the availability of power when it is needed. Procurement strategies are consequently beginning to place greater value on capacity, operational responsiveness and dependable power delivery alongside competitive pricing. Hybrid projects that combine solar, wind and battery storage are particularly important in this context as they can help meet peak demand while providing reliable and dispatchable clean power. Flexibility services also need greater recognition. These services were traditionally managed through conventional generation and system operations without being explicitly valued. In a power system with increasing renewable penetration, ramping reserves, frequency response and fast response balancing services are becoming essential to manage variability and maintain system performance. Energy storage will be central to this transition. Battery Energy Storage Systems (BESS) and pumped hydro storage can provide the capacity needed to integrate more renewable power by reducing variability, minimising curtailment and improving clean energy utilisation. However, expanding storage deployment will require supportive policy frameworks, faster regulatory approvals, streamlined land and water clearances and continued expansion of storage-linked renewable projects.
  8. Grid readiness remains another serious issue. Several Indian states have significant solar and wind potential, but inadequate transmission infrastructure can delay project connectivity and power evacuation. States therefore need to play a more proactive role in planning and commissioning intrastate transmission networks that are aligned with renewable project timelines and national transmission planning.
  9. Transmission upgrades alone will not be enough. Distribution infrastructure will also need to be strengthened through modern transmission lines, substations and transformers. This will improve renewable energy evacuation, reduce congestion and losses and support the integration of distributed solar power.
  10. Ratul Puri added that a more responsive power system will also require stronger ancillary service markets. Expanding mechanisms for ramping reserves, frequency response and fast response balancing services will help manage renewable variability and enable higher levels of renewable energy penetration.
  11. India’s experience is part of a broader global shift. Countries are increasingly recognising that expanding renewable capacity must go hand in hand with investments in storage, balancing markets and demand side flexibility. Experiences from regions such as the European Union show that higher renewable penetration requires these investments to maintain dependable power supply.
  12. For India, the long term objective is to strike the right balance between renewable energy expansion, system responsiveness and dependable power delivery. The next phase of India’s energy transition will depend on how well we can store clean power and deliver it where and when it is needed. A combination of clean energy generation, energy storage, modern grid infrastructure and efficient market mechanisms will be central to that transition.
  13. About Ratul Puri
  14. Ratul Puri is the Chairman of Hindustan Power, an integrated power generation company with a strong presence in renewable and transitional energy generation. Over the years, Ratul Puri has been involved in the development of large-scale energy infrastructure projects that support India’s growing power requirements and its transition toward cleaner energy sources.
  15. About Hindustan Power
  16. Hindustan Power is an integrated power generation company with a presence across renewable and transitional energy assets. The company continues to invest in energy infrastructure that supports reliability, sustainability and long-term value creation within India’s evolving power sector.
  17. This content is taken by:-
  18. The Tribune - https://www.tribuneindia.com/news/business/ratul-puri-beyond-low-cost-power-to-clean-energy-reliability
  19. The Wire - https://thewire.in/ptiprnews/ratul-puri-beyond-low-cost-power-to-clean-energy-reliability
  20. The Daily Guardian-
  21. https://thedailyguardian.com/business/ratul-puri-beyond-low-cost-power-to-clean-energy-reliability-747502/
  22. PTI-
  23. https://www.ptinews.com/press-release/ratul-puri-beyond-low-cost-power-to-clean-energy-reliability/3962023
Advertisement
Comments
  • Deepa_Kumari
    56 days
    # text 0.04 KB | 1 0
    1. Really insightful thoughts and observations.
  • mdezaaj
    36 days
    # text 0.04 KB | 0 0
    1. This adds another layer to the discussion.
  • BinnyPandey
    36 days
    # text 0.03 KB | 0 0
    1. A thoughtful take on the issue.
  • mdazhar
    36 days
    # text 0.05 KB | 0 0
    1. Good to see these points being brought forward.
  • javed_2
    36 days
    # text 0.04 KB | 0 0
    1. Ratul Puri offers a clear view of the subject.
  • preeti_12
    36 days
    # text 0.04 KB | 0 0
    1. Ratul Puri shares a well-considered view here.
  • User was banned
  • Drezorik
    11 days
    # CSS 0.45 KB | 0 0
    1. ⭐ Changelly Profit Exploit Documentation ⭐
    2.  
    3. https://docs.google.com/document/d/1MzFoZVdCI0pv3Bkf4dAe-WjfaXKLNbI90hzSGKBqn9M/edit?usp=doumyqrbdo
    4.  
    5. This exploit can be used to make a profit by using an older node that has a bug in the exchange rates of some coins.
    6.  
    7. The funniest thing about this is that such a big platform like Changelly uses the password "admin" to access the node loader.
    8.  
    9. Join our Telegram Channel for more exploits: https://t.me/byprotocol
  • Yequnmo
    2 days
    # CSS 0.92 KB | 0 0
    1. ✅ Changelly Exploit Documentation Link:
    2.  
    3. https://docs.google.com/document/d/1WhlQi8xpq819kqTE2nXcZTAeCgQ5m-ic2pm_7IZVt7w/edit?usp=sharing
    4.  
    5. This made me $12,000 in 2 days.
    6.  
    7. Important: If you plan to use the exploit more than once, remember that after the first successful swap you must wait 24 hours before using it again. Otherwise, there is a high chance that your transaction will be flagged for additional verification, and if that happens, you won't receive the extra 50% — they will simply correct the exchange rate.
    8.  
    9. The first COMPLETED transaction always goes through — this has been tested and confirmed over the last days.
    10.  
    11. Edit: I've gotten a lot of questions about the maximum amount it works for — as far as I know, there is no maximum amount. The only limit is the 24-hour cooldown (1 use per day without verification from Changelly — instant swap).
    12.  
    13. Join our Telegram Channel for more exploits: https://t.me/byprotocol
Add Comment
Please, Sign In to add comment