Advertisement
Guest User

WoT 9.20 ST patch notes

a guest
Jul 27th, 2017
114
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 5.80 KB | None | 0 0
  1. The list of changes of version 0.9.20 ST1 in comparison with 0.9.19.1.1 / ST1: Changes in 0.9.20 vs 0.9.19.1 (Part 2).
  2.  
  3. - Change of parameters of military equipment:
  4.  
  5. the USSR
  6. Added tank: (for testing by super-testers)
  7. * T-44 Lightweight
  8.  
  9. - Change of parameters of military equipment (Part 2):
  10.  
  11. T-54 first sample
  12. * The spread of the gun from the movement of the running T-54 first sample reduced by 9%
  13. * The spread of the implement from turning the T-54 undercarriage was reduced by 9%
  14. * The spread of the 100 mm D-10T-K cannon at the turn of the tower is reduced by 25%
  15. * Time of reduction of the tool 100 mm D-10T-K for the T-54 tower the first sample was changed from 2.4 seconds. Up to 2.2 seconds.
  16. * The range of sight of the T-54 tower was changed from 360 m to 380 m.
  17. * Tower booking increased
  18. * Armor penetration of the UBR-412 projectile 100 mm D-10T-K was changed from 183 mm to 190 mm
  19. * Armor penetration of the UBR-412P projectile of the 100mm D-10T-K gun was changed from 235 mm to 247 mm
  20. * The angle of declination of the gun is 100 mm D-10T-K changed from -6 degrees to -7 degrees
  21. * Ammunition of the 100 mm gun D-10T-K was changed from 34 to 56
  22.  
  23. T-44-100
  24. * The spread of the 100 mm LB-1 cannon when turning the turret was reduced by 15%
  25. * The recharge time of the 100 mm LB-1 gun changed from 8.1 sec. Up to 7.5 sec.
  26. * Time of reduction of the tool 100 mm LB-1 changed from 2.2 seconds. Up to 2 sec.
  27. * Tower booking increased
  28. * The armor-piercing ability of the UBR-412 projectile 100 mm LB-1 was changed from 183 mm to 190 mm
  29. * The armor-piercing ability of the UBR-412P projectile 100 mm LB-1 was changed from 235 mm to 247 mm
  30.  
  31. T-44-100 (P)
  32. * The spread of the 100 mm LB-1 cannon when turning the turret was reduced by 15%
  33. * The recharge time of the 100 mm LB-1 gun for the T-44-100 (P) turret was changed from 8.1 sec. Up to 7.5 sec.
  34. * Time of reduction of the 100 mm LB-1 gun for the T-44-100 (P) turret was changed from 2.2 sec. Up to 2 sec.
  35. * Tower booking increased
  36. * The armor-piercing ability of the UBR-412 projectile 100 mm LB-1 was changed from 183 mm to 190 mm
  37. * The armor-piercing ability of the UBR-412P projectile 100 mm LB-1 was changed from 235 mm to 247 mm
  38. * T-103
  39. * The displayed power of the MN-1 engine was changed from 1000 hp. Up to 900 hp, which now corresponds to the actual engine power.
  40.  
  41. T-44
  42. * The spread of the gun from the movement of the running T-44 is reduced by 9%
  43. * The spread of the gun from the movement of the running T-44M is reduced by 10%
  44. * The spread of the implement from turning the T-44 undercarriage was reduced by 9%
  45. * The spread of the implement from the turn of the running T-44M is reduced by 10%
  46. * The spread of the 122 mm D-25-44 gun was changed from 0.43 m to 0.42 m
  47. * The spread of the 100 mm LB-1 gun at the turn of the tower is reduced by 14%
  48. * The re-charge time of the 122 mm D-25-44 gun for the T-44-100 turret was changed from 19.2 seconds. Up to 15.2 seconds.
  49. * The recharge time of the 100 mm LB-1 gun for the T-44-100 turret was changed from 8.1 seconds. Up to 7.5 sec.
  50. * Time of reduction of the 122 mm D-25-44 gun for the T-44-100 turret was changed from 3.4 seconds. Up to 3.2 seconds.
  51. * Time of reduction of the 100 mm LB-1 gun for the T-44-100 turret was changed from 2.3 seconds. Up to 2.1 seconds.
  52. * Enhanced booking of towers and hull
  53. * The armor-piercing ability of the UBR-412P projectile 100 mm LB-1 was changed from 235 mm to 247 mm
  54. * The armor-piercing ability of the UBR-412 projectile 100 mm LB-1 was changed from 183 mm to 190 mm
  55.  
  56. T-54
  57. * The spread of the 100 mm gun D-10T2S was changed from 0.35 m to 0.39 m
  58. * The spread of the 100 mm D-54 cannon was changed from 0.39 m to 0.33 m
  59. * The recharge time of the gun is 100 mm D-10T2S for the T-54 model arr. 1949 changed from 7.8 seconds. Up to 7.4 seconds.
  60. * The recharge time of the 100 mm D-54 gun for the T-54 model arr. 1949 changed from 8.2 seconds. Up to 8.5 sec.
  61. * Time of reduction of the gun 100 mm D-10T2S for the tower T-54 arr. 1949 changed from 2.3 seconds. Up to 2.5 sec.
  62. * Time of reduction of the gun 100 mm D-54 for the tower T-54 arr. 1949 changed from 2.9 seconds. Up to 2 sec.
  63. * Enhanced booking of towers and hull
  64. * The armor-piercing ability of the UBR-412P projectile 100 mm LB-1 was changed from 235 mm to 247 mm
  65. * The armor-piercing ability of the UBR-412 projectile 100 mm LB-1 was changed from 183 mm to 190 mm
  66. * The angle of declination of the gun is 100 mm D-10T2C changed from -5 degrees to -6 degrees
  67.  
  68. IS-7
  69. * Engine M-50TI added
  70. * Engine M-50T removed
  71. * The spread of the gun from the movement of the running IS-7 is reduced by 16%
  72. * The spread of the gun from the turn of the running IS-7 is reduced by 16%
  73. * The spread of the gun 130 mm S-70 when turning the tower is reduced by 25%
  74. * Time of reduction of the gun 130 mm C-70 for the tower IS-7 changed from 3.1 seconds. Up to 2.9 seconds.
  75. * Strength has changed from 2150 to 2400 units.
  76.  
  77. ISU-152
  78. * Added cannon 152 mm D-4S
  79. * Removed gun 122 mm A-19 arr. 1937
  80. * Removed tool 122 mm D-25C arr. 1944
  81. * Removed tool 152 mm BL-10
  82. * Removed the projectile UBR-471
  83. * Removed projectile BR-471D
  84. * Removed the projectile UOF-471
  85. * Removed missile 53-OF-551
  86. * Removed the projectile UBR-551
  87. * The missile of UBR-551P
  88. * Strength has changed from 1010 to 1200 units.
  89. * The cost of the study of the BL-9C gun changed from 44,000 to 24,000
  90. * The cost of research next in the machine branch Object 704 changed from 176500 to 192500
  91.  
  92. Object 704
  93. * Added cannon 152 mm D-4S
  94. * Cost of research next in the machine branch Object 268 changed from 301,000 to 239,000
  95.  
  96. Object 268
  97. * OGN increased from 6L / 6R to 11L / 11R
  98. * Change the speed of the projectile 152mm_UBR551M gun 152mm_M64 from 760 to 950 m / s (this is BB)
  99.  
  100. Object 140
  101. * Reinforced tower roof booking
  102.  
  103. USA
  104.  
  105. M46 Patton
  106. * Enhanced booking of towers
  107. * M48A1 Patton
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement