- Instrumentation Log, SCP-555 Containment Control
- 0700: Containment normal. Field strength normal. Battery backup at 100% and
- charging.
- 0730: Containment normal. Field strength normal. Battery backup at 100% and
- charging.
- 0800: Containment normal. Field strength normal. Battery backup at 100% and
- charging.
- 0811: External power fluctuation. Power returns to normal. Battery backup at
- 100% and charging.
- 0827: External power lost. Switching to battery backup. Battery backup at 99%.
- SCADA alarm tripped and relevant personnel paged.
- 0827: Power to air filtration system lost.
- 0827: Cryomagnet quench in quadrant 4 of ceiling electromagnet array. SCADA
- alarm tripped and relevant personnel paged. Atmosphere alarm tripped; warning
- signals activated and relevant personnel paged. Atmospheric venting system
- activated.
- 0827: Activating permanent magnet array.
- 0827: Permanent magnet array activation failed after 5 retries with error code 3:
- mechanical obstruction. SCADA alarm tripped and relevant personnel paged.
- 0830: Containment running on battery backup power. Field strength normal.
- Battery backup at 95%.
- 0831: Containment control door ajar.
- 0833: Auxilliary power feed activated. Battery backup at 96% and charging.
- Surveillance camera log, SCP-555 Containment Control
- 0700: No motion detected. No anomalies detected.
- 0830: No motion detected. No anomalies detected.
- 0800: No motion detected. No anomalies detected.
- 0811: Motion detected, source unknown. Explosions heard.
- 0827: Motion detected, source unknown. Explosion heard, louder, followed by
- extremely loud bang as ceiling magnets quench and vent helium.
- 0827: External main power to surveillance system lost. Switching to power-
- over-Ethernet.
- 0827: Atmospheric warning siren and revolving lamps activate.
- 0827: Ceiling of SCP-555 containment partially collapses.
- 0827: SCADA alarm buzzer sounds.
- 0827: Automatic containment systems attempt to deploy permanent magnet array;
- array is blocked from extending by rubble from ceiling collapse.
- 0831: Containment Control door opens; Researcher Thumb enters, swearing
- profusely and pulling a standard mu-metal magnetic containment crate behind him.
- 0832: Researcher Thumb closes, locks, and seals the door and opens the crate,
- removing a Honda portable generator, laptop computer, five-gallon container of
- gasoline, and standard Foundation non-ferromagnetic SCBA set, with three tank
- sets (60 minutes duration each) .
- 0833: Researcher Thumb starts the generator, retrieves the auxilliary power cord
- from below the control console, and attaches it.
- 0834: Researcher Thumb jams the room's chair under the door handle and dons
- the SCBA set.
- 0835: Researcher Thumb enters SCP-555's containment chamber and begins to
- clear rubble from the permanent magnet array.
- 0837: Researcher Thumb attempts to dislodge a mass of reinforced concrete
- from the permanent magnet array and cannot; the rebar is stuck to the magnet
- face. Researcher Thumb swears profusely.
- 0838: Researcher Thumb exits the containment chamber.
- 0840: Researcher Thumb adds more fuel to the generator, attaches the laptop
- computer to the generator and network port, and sits against the control console.
- 0842: Researcher Thumb smashes the atmosphere warning lights and siren with
- an SCBA tank. Alarms cease.