Advertisement
Not a member of Pastebin yet?
Sign Up,
it unlocks many cool features!
- ★ Layla Dekker crouchs down toward the maintanence box as she starts unboxing it
- ★ Layla Dekker picks up a Cutter, Heater, Screwdriver
- ★ Layla Dekker crouchs down toward the wheels as she starts to to take off the wheels
- ★ Process : 1/4 ((Layla Dekker))
- ★ Process : 2/4 ((Layla Dekker))
- ★ Process : 3/4 ((Layla Dekker))
- ★ Process : 4/4 ((Layla Dekker))
- ★ Layla Dekker holds up the wheels as she drops them one by one over the wall
- ★ Layla Dekker crouchs down as she starts to install a C-Notch in the vehicle to lower it
- ★ Layla Dekker moves toward the front suspension as she starts to maniplulate the coils
- ★ Layla Dekker moves toward the boxes as she picks up a new Springs [LOW] From Low vehicles section
- ★ Layla Dekker from the Springs section she picks up a 4 link as she starts to setup it at the rear leaf -
- ★ Layla Dekker - replacing it with the old rear leaf springs
- ★ Layla Dekker moves back toward the vehicle wheels as she starts to pick them one by one and moving to the
- ★ Layla Dekker car as she starts to install it using her screwdriver.
- ★ Process : 1/4 ((Layla Dekker))
- ★ Process : 2/4 ((Layla Dekker))
- ★ Process : 3/4 ((Layla Dekker))
- ★ Process : 4/4 ((Layla Dekker))
- ★ Layla Dekker picks up the vehicle old stuff as she drops them in a box, Clipsing it, Moving it at the -
- ★ Layla Dekker - BIN Section
- [English] Layla Dekker says: Your vehicle is done sir.
- [English] Layla Dekker says: You're free to go.
- Tim Arnold: (( we need vct. ))
- Tim Arnold: (( put it on pastebi
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement