Not a member of Pastebin yet?
Sign Up,
it unlocks many cool features!
- Economy changes:
- - Alaska (CB-1):
- - 380000 -> 220000 RP
- - 990000 -> 660000 SL
- - crew cost: 280000 -> 190000 SL
- - expert crew cost: 990000 -> 660000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 16000
- - SL cost: 37000 -> 27000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 18 Mod. 1, Mk. 32 Mod. 1 Com.:
- - RP cost: 12000 -> 7800
- - SL cost: 18000 -> 13000
- - GE cost: 290 -> 280
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement:
- - RP cost: 16000 -> 11000
- - SL cost: 25000 -> 19000
- - GE cost: 380 -> 390
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 8100
- - SL cost: 18000 -> 14000
- - Allen M. Sumner (DD-692):
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 900
- - SL cost: 2100 -> 1500
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.:
- - RP cost: 790 -> 550
- - SL cost: 1300 -> 940
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 740 -> 520
- - SL cost: 1200 -> 890
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 830 -> 580
- - SL cost: 1400 -> 990
- - Arizona (BB-39):
- - 380000 -> 300000 RP
- - 990000 -> 900000 SL
- - crew cost: 280000 -> 260000 SL
- - expert crew cost: 990000 -> 900000 SL
- - ace crew cost: 830000 / 2000 -> 950000 RP / 2400 GE
- - RP multiplier: 2.08 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 21000
- - SL cost: 37000 -> 36000
- - GE cost: 510 -> 550
- - Anti-Air Armament Targeting, AP, Damage Control Division, Dry-Docking, Mk. 8 Mod. 3:
- - RP cost: 12000 -> 11000
- - SL cost: 18000 -> 19000
- - GE cost: 260 -> 290
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 20000
- - GE cost: 470 -> 530
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - GE cost: 320 -> 340
- - talisman: 2300 -> 2600 GE
- - Arkansas (BB-33), Des Moines (CA-134), Helena (CL-50), Prinz Eugen, Zheleznyakov, Belfast (C 35), Mikuma, Pola: expert crew cost: 800000 -> 550000 SL
- - Atlanta (CL-51):
- - 89000 -> 46000 RP
- - 300000 -> 150000 SL
- - crew cost: 87000 -> 43000 SL
- - expert crew cost: 300000 -> 150000 SL
- - ace crew cost: 520000 / 1100 -> 480000 RP / 940 GE
- - minimum repair cost: 825 / 574 -> 735 / 506 SL/minute
- - full stock repair cost: 11461 / 11638 -> 10208 / 10271 SL
- - full spaded repair cost: 14656 / 14882 -> 13054 / 13135 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.33 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 6400 -> 3600
- - SL cost: 11000 -> 6500
- - GE cost: 370 -> 340
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2000
- - SL cost: 6000 -> 3600
- - GE cost: 200 -> 190
- - Damage Control Division, Dry-Docking, Mk. 32 Mod. 1 Com.:
- - RP cost: 5200 -> 3000
- - SL cost: 8900 -> 5400
- - GE cost: 300 -> 290
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 1900
- - SL cost: 5700 -> 3400
- - GE cost: 190 -> 180
- - talisman: 1700 -> 1500 GE
- - Aylwin (DD-355):
- - 5900 -> 5300 RP
- - 6300 -> 5000 SL
- - crew cost: 1800 -> 1400 SL
- - expert crew cost: 6300 -> 5000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 390 -> 340
- - SL cost: 300 -> 240
- - AP-T / AP-T / AP-T / HEFI, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 220 -> 195
- - SL cost: 165 -> 140
- - Damage Control Division, Dry-Docking, HEF-T / HEFI / AP-T / HEFI, Mk. 32 Mod. 1 Com.:
- - RP cost: 300 -> 260
- - SL cost: 230 -> 185
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 250 -> 220
- - SL cost: 190 -> 155
- - Bagley (DD-386):
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode: RP cost: 560 -> 550
- - Auxiliary Armament Targeting, Fire Division, M20 / M20 / M20 / M1, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen: RP cost: 260 -> 250
- - Damage Control Division, Dry-Docking, M20 / M2 / M2 / M2, Mk. 32 Mod. 1 Com.: RP cost: 350 -> 340
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: RP cost: 290 -> 280
- - Baltimore (CA-68):
- - 290000 -> 180000 RP
- - 790000 -> 540000 SL
- - crew cost: 230000 -> 155000 SL
- - expert crew cost: 790000 -> 540000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 19000 -> 11000
- - SL cost: 28000 -> 19000
- - GE cost: 490 -> 480
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 21 Mod. 2:
- - RP cost: 14000 -> 8300
- - SL cost: 21000 -> 14000
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 11000 -> 6200
- - SL cost: 16000 -> 11000
- - GE cost: 280 -> 270
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 6900
- - SL cost: 18000 -> 12000
- - GE cost: 310 -> 300
- - Bennion (DD-662), Cowell (DD-547), Detroit (CL-8), Moffett (DD-362), Z 20 (1945), Z 47, Stroyny, Haida (G 63), Kiyoshimo, Y┼Фbari, Tigre (TI): expert crew cost: 290000 -> 135000 SL
- - Brooklyn (CL-40):
- - 45000 -> 36000 RP
- - 300000 -> 230000 SL
- - crew cost: 87000 -> 67000 SL
- - expert crew cost: 300000 -> 230000 SL
- - ace crew cost: 520000 / 1100 -> 570000 RP / 1200 GE
- - minimum repair cost: 797 / 561 -> 837 / 601 SL/minute
- - full stock repair cost: 11058 / 10457 -> 11613 / 11201 SL
- - full spaded repair cost: 14924 / 14112 -> 15672 / 15117 SL
- - RP multiplier: 1.72 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 5100 -> 4400
- - SL cost: 8800 -> 7800
- - GE cost: 330 -> 350
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 35 Mod. 1:
- - RP cost: 3900 -> 3400
- - SL cost: 6700 -> 6100
- - GE cost: 250 -> 270
- - Auxiliary Armament Targeting, Fire Division, Mk. 34 Mod. 1 HE-BF, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 3000
- - SL cost: 6000 -> 5300
- - GE cost: 230 -> 240
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2800
- - SL cost: 5700 -> 5000
- - GE cost: 210 -> 230
- - talisman: 1700 -> 1800 GE
- - Cleveland (CL-55):
- - 61000 -> 46000 RP
- - 230000 -> 150000 SL
- - crew cost: 65000 -> 43000 SL
- - expert crew cost: 230000 -> 150000 SL
- - ace crew cost: 440000 / 820 -> 480000 RP / 940 GE
- - minimum repair cost: 569 / 430 -> 699 / 505 SL/minute
- - full stock repair cost: 7895 / 8014 -> 9697 / 9411 SL
- - full spaded repair cost: 10655 / 10816 -> 13086 / 12700 SL
- - SL multiplier: 3.89 / 6.0 / 1.0 -> 4.24 / 6.0 / 1.0
- - RP multiplier: 1.6 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 3600 -> 2900
- - SL cost: 7000 -> 5200
- - GE cost: 290 -> 320
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 35 Mod. 1:
- - RP cost: 2800 -> 2200
- - SL cost: 5400 -> 4000
- - GE cost: 230 -> 240
- - Auxiliary Armament Targeting, Fire Division, Mk. 34 Mod. 1 HE-BF, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 2100 -> 1700
- - SL cost: 4100 -> 3100
- - GE cost: 170 -> 190
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1900
- - SL cost: 4400 -> 3400
- - GE cost: 190 -> 210
- - talisman: 1400 -> 1500 GE
- - Colorado (BB-45):
- - 390000 -> 350000 RP
- - ace crew cost: 890000 / 2200 -> 1010000 RP / 2600 GE
- - RP multiplier: 2.14 -> 2.26
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - SL cost: 37000 -> 40000
- - GE cost: 560 -> 620
- - Anti-Air Armament Targeting, AP, Damage Control Division, Dry-Docking, Mk. 3:
- - SL cost: 19000 -> 20000
- - GE cost: 280 -> 310
- - Auxiliary Armament Targeting, Fire Division, Mk. 5 Mod. 1, Rudder Replacement:
- - SL cost: 26000 -> 28000
- - GE cost: 390 -> 440
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 23000 -> 25000
- - GE cost: 350 -> 390
- - talisman: 2400 -> 2700 GE
- - Davis (DD-395), Frank Knox (DD-742), Duguay-Trouin: expert crew cost: 180000 -> 105000 SL
- - Fargo (CL-106):
- - 75000 -> 59000 RP
- - 250000 -> 185000 SL
- - crew cost: 72000 -> 53000 SL
- - expert crew cost: 250000 -> 185000 SL
- - ace crew cost: 480000 / 940 -> 520000 RP / 1100 GE
- - minimum repair cost: 699 / 505 -> 797 / 561 SL/minute
- - full stock repair cost: 9697 / 9411 -> 11058 / 10457 SL
- - full spaded repair cost: 13086 / 12700 -> 14924 / 14112 SL
- - SL multiplier: 4.24 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 4300 -> 3500
- - SL cost: 8300 -> 6400
- - GE cost: 320 -> 340
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 35 Mod. 1:
- - RP cost: 3300 -> 2700
- - SL cost: 6400 -> 5000
- - GE cost: 240 -> 260
- - Auxiliary Armament Targeting, Fire Division, Mk. 34 Mod. 1 HE-BF, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 2000
- - SL cost: 4900 -> 3700
- - GE cost: 185 -> 195
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 2300
- - SL cost: 5400 -> 4200
- - GE cost: 210 -> 220
- - talisman: 1500 -> 1700 GE
- - Fletcher (DD-445):
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 159 / 158 -> 202 / 206 SL/minute
- - full stock repair cost: 1214 / 1872 -> 1539 / 2441 SL
- - full spaded repair cost: 1578 / 2434 -> 2002 / 3174 SL
- - SL multiplier: 1.04 / 2.54 / 1.0 -> 1.36 / 3.34 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 550 -> 620
- - SL cost: 620 -> 870
- - GE cost: 155 -> 170
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.:
- - RP cost: 340 -> 380
- - SL cost: 380 -> 530
- - GE cost: 95 -> 105
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 320 -> 360
- - SL cost: 360 -> 510
- - GE cost: 90 -> 100
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 350 -> 400
- - SL cost: 400 -> 560
- - GE cost: 95 -> 110
- - talisman: 640 -> 750 GE
- - Gearing (DD-710):
- - 26000 -> 18000 RP
- - 76000 -> 55000 SL
- - crew cost: 22000 -> 16000 SL
- - expert crew cost: 76000 -> 55000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1000
- - SL cost: 3200 -> 1900
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.:
- - RP cost: 1100 -> 630
- - SL cost: 2100 -> 1200
- - GE cost: 150 -> 145
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 1000 -> 590
- - SL cost: 1900 -> 1100
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 660
- - SL cost: 2100 -> 1300
- - GE cost: 150 -> 155
- - Iowa (BB-61):
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 26000 -> 25000
- - SL cost: 41000 -> 42000
- - GE cost: 650 -> 660
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 8 Mod. 6:
- - RP cost: 16000 -> 15000
- - GE cost: 400 -> 390
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement: RP cost: 18000 -> 17000
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 21000 -> 22000
- - GE cost: 330 -> 340
- - Mississippi (BB-41):
- - 390000 -> 260000 RP
- - 1050000 -> 780000 SL
- - crew cost: 300000 -> 220000 SL
- - expert crew cost: 1050000 -> 780000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 530 -> 520
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 16:
- - RP cost: 15000 -> 11000
- - SL cost: 23000 -> 19000
- - GE cost: 330 -> 320
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 17000
- - SL cost: 34000 -> 29000
- - GE cost: 480 -> 490
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 9400
- - SL cost: 19000 -> 16000
- - GE cost: 260 -> 270
- - Mitscher (DL-2):
- - 9200 -> 13000 RP
- - 16000 -> 31000 SL
- - crew cost: 4500 -> 9000 SL
- - expert crew cost: 16000 -> 31000 SL
- - ace crew cost: 190000 / 180 -> 250000 RP / 320 GE
- - minimum repair cost: 160 / 159 -> 248 / 245 SL/minute
- - full stock repair cost: 1217 / 1877 -> 1891 / 2896 SL
- - full spaded repair cost: 1578 / 2434 -> 2453 / 3756 SL
- - SL multiplier: 1.04 / 2.54 / 1.0 -> 1.63 / 3.99 / 1.0
- - RP multiplier: 1.18 -> 1.3
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 910 -> 1200
- - SL cost: 1000 -> 1800
- - GE cost: 220 -> 280
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 42:
- - RP cost: 420 -> 540
- - SL cost: 470 -> 820
- - GE cost: 100 -> 130
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Mk. 41 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 320 -> 410
- - SL cost: 360 -> 620
- - GE cost: 75 -> 95
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Rocket Launcher, Shrapnel Protection, Ventilation:
- - RP cost: 350 -> 450
- - SL cost: 400 -> 680
- - GE cost: 85 -> 105
- - talisman: 640 -> 860 GE
- - Nevada (BB-36):
- - 380000 -> 260000 RP
- - 990000 -> 780000 SL
- - crew cost: 280000 -> 220000 SL
- - expert crew cost: 990000 -> 780000 SL
- - ace crew cost: 830000 / 2000 -> 890000 RP / 2200 GE
- - RP multiplier: 2.08 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 570 -> 580
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 8 Mod. 3, Mk. 32 Mod. 1 Com.:
- - RP cost: 12000 -> 9100
- - SL cost: 18000 -> 16000
- - GE cost: 290 -> 300
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement:
- - RP cost: 16000 -> 13000
- - SL cost: 25000 -> 22000
- - GE cost: 380 -> 420
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 9400
- - SL cost: 18000 -> 16000
- - GE cost: 290 -> 310
- - talisman: 2300 -> 2400 GE
- - New Orleans (CA-32):
- - 75000 -> 73000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 67000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 570000 RP / 1200 GE
- - minimum repair cost: 702 / 489 -> 823 / 585 SL/minute
- - full stock repair cost: 9750 / 9462 -> 11420 / 11318 SL
- - full spaded repair cost: 13157 / 12769 -> 15412 / 15274 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 4300 -> 4400
- - SL cost: 8300 -> 7800
- - GE cost: 300 -> 350
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 19 Mod. 1:
- - RP cost: 3300 -> 3400
- - SL cost: 6400 -> 6100
- - GE cost: 230 -> 270
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Rudder Replacement, Smokescreen:
- - SL cost: 5800 -> 5300
- - GE cost: 210 -> 240
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 5400 -> 5000
- - GE cost: 195 -> 230
- - talisman: 1500 -> 1800 GE
- - Newport News (CA-148):
- - 230000 -> 145000 RP
- - 640000 -> 440000 SL
- - crew cost: 185000 -> 125000 SL
- - expert crew cost: 640000 -> 440000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 18000 -> 11000
- - SL cost: 28000 -> 19000
- - GE cost: 540 -> 530
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 21 Mod. 2:
- - RP cost: 11000 -> 6800
- - SL cost: 17000 -> 12000
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 8200 -> 5100
- - SL cost: 13000 -> 8700
- - GE cost: 250 -> 240
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 9100 -> 5700
- - SL cost: 14000 -> 9700
- - North Dakota (BB-29):
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 950 / 949 -> 993 / 992 SL/minute
- - full stock repair cost: 21787 / 27490 -> 22774 / 28736 SL
- - full spaded repair cost: 27336 / 34492 -> 28574 / 36055 SL
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 12000
- - SL cost: 22000 -> 21000
- - GE cost: 490 -> 540
- - Anti-Air Armament Targeting, AP, Damage Control Division, Dry-Docking, Mk. 7:
- - RP cost: 5300 -> 4400
- - SL cost: 8500 -> 7600
- - GE cost: 185 -> 200
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 9900 -> 8200
- - SL cost: 16000 -> 14000
- - GE cost: 350 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 5400
- - SL cost: 11000 -> 9300
- - GE cost: 230 -> 250
- - talisman: 1900 -> 2000 GE
- - Northampton (CA-26):
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 3600 -> 2300
- - SL cost: 7000 -> 4300
- - GE cost: 280 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 19 Mod. 1:
- - RP cost: 2800 -> 1700
- - SL cost: 5400 -> 3200
- - GE cost: 220 -> 210
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 1600
- - SL cost: 4800 -> 3000
- - GE cost: 195 -> 200
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1400
- - SL cost: 4400 -> 2600
- - GE cost: 180 -> 175
- - Pensacola (CA-24):
- - 45000 -> 30000 RP
- - 300000 -> 185000 SL
- - crew cost: 87000 -> 53000 SL
- - expert crew cost: 300000 -> 185000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 5100 -> 3500
- - SL cost: 8800 -> 6400
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 19 Mod. 1:
- - RP cost: 3900 -> 2700
- - SL cost: 6700 -> 5000
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 6000 -> 4600
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2300
- - SL cost: 5700 -> 4200
- - Phelps (DD-360), Blagorodny, Leningrad, Diamond (D 35), Aviere (AV): expert crew cost: 360000 -> 180000 SL
- - Pittsburgh (CA-72):
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 913 / 667 -> 955 / 709 SL/minute
- - full stock repair cost: 12660 / 12430 -> 13238 / 13205 SL
- - full spaded repair cost: 16421 / 16122 -> 17169 / 17127 SL
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 11000 -> 8800
- - SL cost: 18000 -> 15000
- - GE cost: 480 -> 500
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 21 Mod. 2:
- - RP cost: 6600 -> 5400
- - SL cost: 11000 -> 9300
- - GE cost: 290 -> 310
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 4100
- - SL cost: 7800 -> 7100
- - GE cost: 220 -> 230
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 4500
- - SL cost: 8800 -> 7700
- - GE cost: 240 -> 260
- - talisman: 1900 -> 2000 GE
- - Porter (DD-356):
- - 18000 -> 21000 RP
- - 47000 -> 70000 SL
- - crew cost: 13000 -> 20000 SL
- - expert crew cost: 47000 -> 70000 SL
- - ace crew cost: 280000 / 400 -> 360000 RP / 590 GE
- - minimum repair cost: 277 / 279 -> 368 / 362 SL/minute
- - full stock repair cost: 2112 / 3314 -> 2805 / 4306 SL
- - full spaded repair cost: 2747 / 4309 -> 3648 / 5600 SL
- - SL multiplier: 1.87 / 4.76 / 1.0 -> 2.37 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1600 -> 1500
- - SL cost: 2600 -> 3000
- - GE cost: 230 -> 280
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 32 Mod. 1 Com.:
- - RP cost: 990 -> 940
- - SL cost: 1600 -> 1900
- - GE cost: 145 -> 175
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 850
- - SL cost: 1500 -> 1700
- - GE cost: 130 -> 155
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 830 -> 780
- - SL cost: 1400 -> 1600
- - GE cost: 120 -> 145
- - talisman: 980 -> 1200 GE
- - Portland (CA-33):
- - 37000 -> 23000 RP
- - 250000 -> 150000 SL
- - crew cost: 72000 -> 43000 SL
- - expert crew cost: 250000 -> 150000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 17 Mod. 1, New Pumps:
- - RP cost: 4300 -> 2900
- - SL cost: 8300 -> 5200
- - GE cost: 300 -> 310
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 19 Mod. 1:
- - RP cost: 3300 -> 2200
- - SL cost: 6400 -> 4000
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Rudder Replacement, Smokescreen:
- - RP cost: 3000 -> 2000
- - SL cost: 5800 -> 3600
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 1900
- - SL cost: 5400 -> 3400
- - GE cost: 195 -> 200
- - Raleigh (CL-7):
- - 26000 -> 21000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 309 / 288 -> 351 / 284 SL/minute
- - full stock repair cost: 4107 / 6044 -> 4666 / 5961 SL
- - full spaded repair cost: 5558 / 8179 -> 6314 / 8067 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.26 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1200
- - SL cost: 3200 -> 2400
- - GE cost: 210 -> 230
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 27 Mod. 1, Mk. 29 Mod. 1:
- - RP cost: 1100 -> 750
- - SL cost: 2100 -> 1500
- - GE cost: 135 -> 145
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 1200 -> 850
- - SL cost: 2200 -> 1700
- - GE cost: 150 -> 165
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 940
- - SL cost: 2400 -> 1900
- - GE cost: 160 -> 185
- - talisman: 1100 -> 1200 GE
- - Roanoke (CL-145):
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 11000 -> 6800
- - SL cost: 18000 -> 12000
- - GE cost: 460 -> 450
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. 35 Mod. 1, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Mk. 34 Mod. 1 HE-BF, Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 3200
- - SL cost: 7800 -> 5500
- - Somers (DD-381):
- - 26000 -> 25000 RP
- - 76000 -> 87000 SL
- - crew cost: 22000 -> 25000 SL
- - expert crew cost: 76000 -> 87000 SL
- - ace crew cost: 320000 / 500 -> 390000 RP / 700 GE
- - minimum repair cost: 320 / 327 -> 471 / 419 SL/minute
- - full stock repair cost: 2439 / 3884 -> 3583 / 4978 SL
- - full spaded repair cost: 3119 / 4967 -> 4582 / 6366 SL
- - SL multiplier: 2.12 / 5.39 / 1.0 -> 2.62 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2200 -> 2000
- - SL cost: 4100 -> 4000
- - GE cost: 250 -> 290
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 1200 -> 1100
- - GE cost: 135 -> 160
- - Damage Control Division, Dry-Docking, Mk. 32 Mod. 1 Com.:
- - RP cost: 1800 -> 1700
- - GE cost: 200 -> 250
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 1000
- - SL cost: 2100 -> 2000
- - GE cost: 125 -> 145
- - talisman: 1100 -> 1300 GE
- - Tennessee (BB-43):
- - 390000 -> 300000 RP
- - 1050000 -> 900000 SL
- - crew cost: 300000 -> 260000 SL
- - expert crew cost: 1050000 -> 900000 SL
- - ace crew cost: 890000 / 2200 -> 950000 RP / 2400 GE
- - RP multiplier: 2.14 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 21000
- - SL cost: 37000 -> 36000
- - GE cost: 590 -> 620
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. 16, Mk. 31 Mod. 1 HE-VTF, Mk. 32 Mod. 1 Com., Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 11000
- - GE cost: 290 -> 320
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement:
- - RP cost: 17000 -> 15000
- - GE cost: 420 -> 440
- - talisman: 2400 -> 2600 GE
- - Texas (BB-35):
- - 175000 -> 180000 RP
- - 490000 -> 540000 SL
- - crew cost: 140000 -> 155000 SL
- - expert crew cost: 490000 -> 540000 SL
- - ace crew cost: 670000 / 1500 -> 780000 RP / 1800 GE
- - RP multiplier: 1.9 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 18000
- - SL cost: 30000 -> 31000
- - GE cost: 540 -> 600
- - Anti-Air Armament Targeting, AP, Damage Control Division, Dry-Docking, Mk. 8 Mod. 3:
- - RP cost: 6900 -> 6700
- - GE cost: 195 -> 220
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 370 -> 400
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 8300
- - GE cost: 250 -> 280
- - talisman: 2000 -> 2200 GE
- - Trenton (CL-11):
- - 47000 -> 55000 SL
- - crew cost: 13000 -> 16000 SL
- - expert crew cost: 47000 -> 55000 SL
- - ace crew cost: 280000 / 400 -> 320000 RP / 500 GE
- - minimum repair cost: 267 / 271 -> 309 / 288 SL/minute
- - full stock repair cost: 3549 / 5677 -> 4107 / 6044 SL
- - full spaded repair cost: 4803 / 7682 -> 5558 / 8179 SL
- - SL multiplier: 2.58 / 5.55 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 1000
- - SL cost: 2100 -> 1900
- - GE cost: 200 -> 210
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 27 Mod. 1, Mk. 29 Mod. 1:
- - RP cost: 790 -> 630
- - SL cost: 1300 -> 1200
- - GE cost: 120 -> 135
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 710
- - SL cost: 1500 -> 1300
- - GE cost: 135 -> 150
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 790
- - SL cost: 1600 -> 1500
- - GE cost: 150 -> 165
- - talisman: 980 -> 1100 GE
- - Wilkinson (DL-5), Zerst├Хrer 4 (D 178), Mohawk (F 31), Geniere (D 555):
- - crew cost: 6900 -> 6800 SL
- - expert crew cost: 46000 -> 45000 SL
- - Wyoming (BB-32):
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 15000
- - SL cost: 30000 -> 26000
- - GE cost: 540 -> 580
- - Anti-Air Armament Targeting, AP, Damage Control Division, Dry-Docking, Mk. 15 Mod. 1:
- - RP cost: 6900 -> 5500
- - SL cost: 11000 -> 9400
- - GE cost: 195 -> 210
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 13000 -> 10000
- - SL cost: 21000 -> 17000
- - GE cost: 370 -> 380
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6800
- - SL cost: 14000 -> 12000
- - GE cost: 250 -> 260
- - talisman: 2000 -> 2100 GE
- - Admiral Graf Spee:
- - 75000 -> 73000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 67000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 570000 RP / 1200 GE
- - minimum repair cost: 700 / 488 -> 820 / 584 SL/minute
- - full stock repair cost: 9723 / 9436 -> 11390 / 11287 SL
- - full spaded repair cost: 13157 / 12769 -> 15412 / 15274 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 4400
- - SL cost: 8300 -> 7800
- - GE cost: 320 -> 370
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.7 APCBC, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - SL cost: 5200 -> 4800
- - GE cost: 200 -> 230
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.2 Bd.Z. SAPBC:
- - SL cost: 5800 -> 5300
- - GE cost: 220 -> 250
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - SL cost: 5400 -> 5000
- - GE cost: 210 -> 240
- - talisman: 1500 -> 1800 GE
- - Admiral Hipper:
- - 75000 -> 59000 RP
- - 250000 -> 185000 SL
- - crew cost: 72000 -> 53000 SL
- - expert crew cost: 250000 -> 185000 SL
- - ace crew cost: 480000 / 940 -> 520000 RP / 1100 GE
- - minimum repair cost: 700 / 488 -> 780 / 544 SL/minute
- - full stock repair cost: 9723 / 9436 -> 10836 / 10516 SL
- - full spaded repair cost: 13157 / 12769 -> 14663 / 14231 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3500
- - SL cost: 8300 -> 6400
- - GE cost: 320 -> 340
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L/4.4 (m.Hb.) APCBC, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4000
- - GE cost: 200 -> 210
- - Auxiliary Armament Targeting, Fire Division, Pz.Gr. L/4.2 APHE, Rudder Replacement, Smokescreen, Spr.Gr. L/4.7 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 2500 -> 2000
- - SL cost: 4900 -> 3700
- - GE cost: 185 -> 195
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2700
- - SL cost: 6400 -> 5000
- - GE cost: 240 -> 260
- - talisman: 1500 -> 1700 GE
- - Baden, Ersatz Yorck:
- - 380000 -> 220000 RP
- - 990000 -> 660000 SL
- - crew cost: 280000 -> 190000 SL
- - expert crew cost: 990000 -> 660000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 24000 -> 16000
- - SL cost: 37000 -> 27000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L/3.5 APCBC:
- - RP cost: 15000 -> 9800
- - SL cost: 23000 -> 17000
- - GE cost: 340 -> 330
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 16000 -> 11000
- - SL cost: 25000 -> 19000
- - GE cost: 360 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 8100
- - SL cost: 18000 -> 14000
- - Bayern:
- - 380000 -> 260000 RP
- - 990000 -> 780000 SL
- - crew cost: 280000 -> 220000 SL
- - expert crew cost: 990000 -> 780000 SL
- - ace crew cost: 830000 / 2000 -> 890000 RP / 2200 GE
- - RP multiplier: 2.08 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 540 -> 550
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L/3.5 APCBC:
- - RP cost: 15000 -> 11000
- - SL cost: 23000 -> 19000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 16000 -> 13000
- - SL cost: 25000 -> 22000
- - GE cost: 360 -> 400
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 9400
- - SL cost: 18000 -> 16000
- - GE cost: 270 -> 290
- - talisman: 2300 -> 2400 GE
- - Bismarck:
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Spr.Gr. L/4.6 Zt.Z HE-TF: RP cost: 21000 -> 20000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/4.4 APCBC, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 360 -> 350
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/4.5 HE-BF: RP cost: 18000 -> 17000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - SL cost: 21000 -> 22000
- - GE cost: 360 -> 380
- - Derfflinger:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 19000
- - GE cost: 470 -> 500
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 8700 -> 6800
- - SL cost: 14000 -> 12000
- - GE cost: 290 -> 310
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 7800 -> 6100
- - SL cost: 12000 -> 10000
- - GE cost: 260 -> 280
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5700
- - SL cost: 11000 -> 9700
- - GE cost: 240 -> 260
- - talisman: 2000 -> 2100 GE
- - Elbing:
- - 18000 -> 21000 RP
- - 47000 -> 70000 SL
- - crew cost: 13000 -> 20000 SL
- - expert crew cost: 47000 -> 70000 SL
- - ace crew cost: 280000 / 400 -> 360000 RP / 590 GE
- - minimum repair cost: 286 / 265 -> 365 / 248 SL/minute
- - full stock repair cost: 3720 / 5746 -> 4746 / 5377 SL
- - full spaded repair cost: 4745 / 7329 -> 6053 / 6859 SL
- - SL multiplier: 2.71 / 6.0 / 1.0 -> 3.43 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 2100 -> 2000
- - SL cost: 3400 -> 4000
- - GE cost: 260 -> 310
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 890 -> 850
- - SL cost: 1500 -> 1700
- - GE cost: 110 -> 135
- - Damage Control Division, Dry-Docking:
- - RP cost: 2000 -> 1900
- - SL cost: 3300 -> 3800
- - GE cost: 240 -> 300
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 830 -> 780
- - SL cost: 1400 -> 1600
- - GE cost: 100 -> 120
- - talisman: 980 -> 1200 GE
- - Emden:
- - 26000 -> 25000 RP
- - 76000 -> 87000 SL
- - crew cost: 22000 -> 25000 SL
- - expert crew cost: 76000 -> 87000 SL
- - ace crew cost: 320000 / 500 -> 390000 RP / 700 GE
- - minimum repair cost: 321 / 300 -> 457 / 341 SL/minute
- - full stock repair cost: 4274 / 6289 -> 6079 / 7137 SL
- - full spaded repair cost: 5558 / 8179 -> 7905 / 9281 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.62 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2200 -> 2000
- - SL cost: 4100 -> 4000
- - GE cost: 290 -> 340
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC, Spr.Gr. L/4.4 Bd.Z. HE-BF:
- - RP cost: 1100 -> 990
- - SL cost: 2100 -> 2000
- - GE cost: 145 -> 170
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 1000 -> 930
- - GE cost: 130 -> 160
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 1000
- - SL cost: 2100 -> 2000
- - GE cost: 145 -> 170
- - talisman: 1100 -> 1300 GE
- - Gneisenau, Sevastopol: expert crew cost: 1830000 -> 1720000 SL
- - Helgoland:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 15000
- - SL cost: 30000 -> 26000
- - GE cost: 580 -> 610
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 7800 -> 6100
- - SL cost: 12000 -> 10000
- - GE cost: 240 -> 250
- - Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 12000 -> 9100
- - SL cost: 19000 -> 15000
- - GE cost: 360 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5700
- - SL cost: 11000 -> 9700
- - GE cost: 220 -> 230
- - talisman: 2000 -> 2100 GE
- - Jaguar, T 28 ("T 31"), Cadiz (D 79), Yukikaze, Y┼Фdachi: expert crew cost: 115000 -> 81000 SL
- - K 2:
- - 5900 -> 5300 RP
- - 6300 -> 5000 SL
- - crew cost: 1800 -> 1400 SL
- - expert crew cost: 6300 -> 5000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 480 -> 430
- - SL cost: 360 -> 310
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl.:
- - RP cost: 300 -> 260
- - SL cost: 230 -> 185
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 330 -> 300
- - SL cost: 250 -> 210
- - Depth Charges, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 250 -> 220
- - SL cost: 190 -> 155
- - Kaiser:
- - 230000 -> 180000 RP
- - 640000 -> 540000 SL
- - crew cost: 185000 -> 155000 SL
- - expert crew cost: 640000 -> 540000 SL
- - ace crew cost: 720000 / 1700 -> 780000 RP / 1800 GE
- - RP multiplier: 1.96 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 610 -> 640
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 9800 -> 7500
- - SL cost: 15000 -> 13000
- - GE cost: 250 -> 270
- - Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 15000 -> 11000
- - SL cost: 23000 -> 19000
- - GE cost: 380 -> 390
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 9100 -> 6900
- - SL cost: 14000 -> 12000
- - GE cost: 230 -> 250
- - talisman: 2100 -> 2200 GE
- - Karlsruhe: expert crew cost: 490000 -> 300000 SL
- - K├Хln:
- - 61000 -> 46000 RP
- - 230000 -> 150000 SL
- - crew cost: 65000 -> 43000 SL
- - expert crew cost: 230000 -> 150000 SL
- - ace crew cost: 440000 / 820 -> 480000 RP / 940 GE
- - minimum repair cost: 594 / 430 -> 729 / 508 SL/minute
- - full stock repair cost: 8251 / 8318 -> 10118 / 9819 SL
- - full spaded repair cost: 10730 / 10817 -> 13157 / 12769 SL
- - SL multiplier: 3.94 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.6 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 4500 -> 3600
- - SL cost: 8700 -> 6500
- - GE cost: 350 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 2800 -> 2200
- - SL cost: 5400 -> 4000
- - GE cost: 220 -> 230
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 2100 -> 1700
- - SL cost: 4100 -> 3100
- - GE cost: 165 -> 180
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1900
- - SL cost: 4400 -> 3400
- - GE cost: 180 -> 200
- - talisman: 1400 -> 1500 GE
- - Leipzig:
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 6100 -> 3800
- - SL cost: 12000 -> 7100
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 2800 -> 1700
- - SL cost: 5400 -> 3200
- - GE cost: 210 -> 200
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 2100 -> 1300
- - SL cost: 4100 -> 2400
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1400
- - SL cost: 4400 -> 2600
- - GE cost: 170 -> 165
- - Nassau, Marat, Iron Duke (18), Yamashiro, Leonardo da Vinci, Courbet: expert crew cost: 1280000 -> 880000 SL
- - N├╝rnberg:
- - 37000 -> 23000 RP
- - 250000 -> 150000 SL
- - crew cost: 72000 -> 43000 SL
- - expert crew cost: 250000 -> 150000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 5400 -> 3600
- - SL cost: 10000 -> 6500
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 3300 -> 2200
- - SL cost: 6400 -> 4000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 2500 -> 1700
- - SL cost: 4900 -> 3100
- - GE cost: 175 -> 180
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 1900
- - SL cost: 5400 -> 3400
- - GE cost: 195 -> 200
- - Ostfriesland:
- - 290000 -> 180000 RP
- - 790000 -> 540000 SL
- - crew cost: 230000 -> 155000 SL
- - expert crew cost: 790000 -> 540000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 31000 -> 18000
- - SL cost: 46000 -> 31000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 14000 -> 8300
- - SL cost: 21000 -> 14000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 13000 -> 7500
- - SL cost: 19000 -> 13000
- - GE cost: 290 -> 280
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 6900
- - SL cost: 18000 -> 12000
- - Sachsen:
- - 390000 -> 300000 RP
- - 1050000 -> 900000 SL
- - crew cost: 300000 -> 260000 SL
- - expert crew cost: 1050000 -> 900000 SL
- - ace crew cost: 890000 / 2200 -> 950000 RP / 2400 GE
- - RP multiplier: 2.14 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 24000 -> 21000
- - SL cost: 37000 -> 36000
- - GE cost: 560 -> 580
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L/3.5 APCBC:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - GE cost: 350 -> 360
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 17000 -> 15000
- - GE cost: 390 -> 420
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 11000
- - GE cost: 280 -> 310
- - talisman: 2400 -> 2600 GE
- - Scharnhorst:
- - 390000 -> 350000 RP
- - ace crew cost: 890000 / 2200 -> 1010000 RP / 2600 GE
- - RP multiplier: 2.14 -> 2.26
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Spr.Gr. L/4.4 Kz. (m.Hb. u. Abgeschraubt) HE-TF, Torpedo Mode:
- - SL cost: 25000 -> 26000
- - GE cost: 430 -> 480
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Pz.Gr. L/4.4 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - SL cost: 19000 -> 20000
- - GE cost: 330 -> 360
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - SL cost: 26000 -> 28000
- - GE cost: 460 -> 510
- - talisman: 2400 -> 2700 GE
- - Von der Tann:
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 9100
- - SL cost: 22000 -> 16000
- - GE cost: 520 -> 530
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.2 APC:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 7400 -> 4700
- - SL cost: 12000 -> 8100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 3500
- - SL cost: 8800 -> 6000
- - Westfalen:
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 950 / 949 -> 993 / 992 SL/minute
- - full stock repair cost: 21787 / 27490 -> 22774 / 28736 SL
- - full spaded repair cost: 27336 / 34492 -> 28574 / 36055 SL
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 12000
- - SL cost: 22000 -> 21000
- - GE cost: 520 -> 580
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.2 APC:
- - RP cost: 6600 -> 5400
- - SL cost: 11000 -> 9300
- - GE cost: 250 -> 260
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 7400 -> 6100
- - SL cost: 12000 -> 11000
- - GE cost: 280 -> 290
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 4500
- - SL cost: 8800 -> 7700
- - GE cost: 210 -> 220
- - talisman: 1900 -> 2000 GE
- - Z 5 ("Z 12"):
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode: RP cost: 450 -> 440
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl., Spr.Gr. L/4.5 Bd.Z. HE-BF: RP cost: 280 -> 270
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 310 -> 300
- - GE cost: 85 -> 80
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: RP cost: 350 -> 340
- - Z 15: modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 290 -> 260
- - SL cost: 175 -> 140
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI / HEFI / HEFI / HEFI / AP-T, Spr.Gr. L/4.5 Bd.Z. HE-BF:
- - RP cost: 180 -> 160
- - SL cost: 110 -> 85
- - AP-T / AP-T / AP-T / AP-T / HEFI, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 165 -> 150
- - SL cost: 100 -> 80
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 220 -> 200
- - SL cost: 135 -> 105
- - Z 20 (1941) ("Z 22"):
- - 7900 -> 9000 RP
- - 10000 -> 16000 SL
- - crew cost: 3000 -> 4500 SL
- - expert crew cost: 10000 -> 16000 SL
- - ace crew cost: 160000 / 125 -> 190000 RP / 180 GE
- - minimum repair cost: 115 -> 158 / 159 SL/minute
- - full stock repair cost: 871 / 1355 -> 1196 / 1873 SL
- - full spaded repair cost: 1133 / 1762 -> 1555 / 2435 SL
- - SL multiplier: 0.81 / 1.86 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.12 -> 1.18
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 560 -> 690
- - SL cost: 550 -> 770
- - GE cost: 140 -> 165
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl., Spr.Gr. L/4.5 Bd.Z. HE-BF:
- - RP cost: 280 -> 340
- - SL cost: 270 -> 380
- - GE cost: 70 -> 80
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 310 -> 380
- - SL cost: 300 -> 420
- - GE cost: 80 -> 90
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 350 -> 430
- - SL cost: 340 -> 480
- - GE cost: 90 -> 100
- - talisman: 530 -> 640 GE
- - Z 25, Le Triomphant (X 83):
- - crew cost: 10000 -> 8300 SL
- - expert crew cost: 67000 -> 55000 SL
- - Z 33:
- - 9200 -> 13000 RP
- - 16000 -> 31000 SL
- - crew cost: 4500 -> 9000 SL
- - expert crew cost: 16000 -> 31000 SL
- - ace crew cost: 190000 / 180 -> 250000 RP / 320 GE
- - minimum repair cost: 159 / 158 -> 248 / 244 SL/minute
- - full stock repair cost: 1214 / 1872 -> 1886 / 2888 SL
- - full spaded repair cost: 1578 / 2434 -> 2453 / 3756 SL
- - SL multiplier: 1.04 / 2.54 / 1.0 -> 1.63 / 3.99 / 1.0
- - RP multiplier: 1.18 -> 1.3
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 680 -> 880
- - SL cost: 770 -> 1300
- - GE cost: 165 -> 210
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl., Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 340 -> 440
- - SL cost: 380 -> 670
- - GE cost: 80 -> 105
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 380 -> 490
- - SL cost: 430 -> 740
- - GE cost: 90 -> 115
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 540
- - SL cost: 470 -> 820
- - GE cost: 100 -> 130
- - talisman: 640 -> 860 GE
- - Z 35 ("Z 43"):
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 159 / 158 -> 202 / 206 SL/minute
- - full stock repair cost: 1214 / 1872 -> 1539 / 2441 SL
- - full spaded repair cost: 1578 / 2434 -> 2002 / 3174 SL
- - SL multiplier: 1.04 / 2.54 / 1.0 -> 1.36 / 3.34 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 550 -> 620
- - SL cost: 620 -> 870
- - GE cost: 140 -> 155
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl., Spr.Gr. L/4.5 Bd.Z. HE-BF:
- - RP cost: 340 -> 380
- - SL cost: 380 -> 530
- - GE cost: 85 -> 95
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 380 -> 430
- - SL cost: 430 -> 600
- - GE cost: 95 -> 110
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 480
- - SL cost: 470 -> 670
- - GE cost: 105 -> 120
- - talisman: 640 -> 750 GE
- - Z 46:
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mines, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 900
- - SL cost: 2100 -> 1500
- - GE cost: 200 -> 195
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI / HEFI / HEFI / HEFI / AP-T, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 690
- - SL cost: 1600 -> 1200
- - AP-T / AP-T / AP-T / AP-T / HEFI, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Sprgr. L/4.5 Zt.Z. (m. Hb.) HE-TF:
- - RP cost: 740 -> 520
- - SL cost: 1200 -> 890
- - Arkhangelsk:
- - 390000 -> 350000 RP
- - ace crew cost: 890000 / 2200 -> 1010000 RP / 2600 GE
- - RP multiplier: 2.14 -> 2.26
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - SL cost: 50000 -> 53000
- - GE cost: 700 -> 780
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. XIIa:
- - SL cost: 19000 -> 20000
- - GE cost: 260 -> 290
- - Auxiliary Armament Targeting, Fire Division, Mk. XVIIb, Rudder Replacement:
- - SL cost: 26000 -> 28000
- - GE cost: 370 -> 410
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 23000 -> 25000
- - GE cost: 330 -> 360
- - talisman: 2400 -> 2700 GE
- - Besposhchadny:
- - 4000 -> 5300 RP
- - 2100 -> 5000 SL
- - crew cost: 600 -> 1400 SL
- - expert crew cost: 2100 -> 5000 SL
- - ace crew cost: 110000 / 45 -> 135000 RP / 80 GE
- - minimum repair cost: 58 / 57 -> 86 / 85 SL/minute
- - full stock repair cost: 426 / 669 -> 633 / 988 SL
- - full spaded repair cost: 554 / 871 -> 824 / 1285 SL
- - SL multiplier: 0.5 / 0.86 / 1.0 -> 0.72 / 1.24 / 1.0
- - RP multiplier: 1.0 -> 1.06
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 360 -> 430
- - SL cost: 220 -> 310
- - GE cost: 110 -> 130
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361DF, PB-46A SAPCBC:
- - RP cost: 180 -> 210
- - SL cost: 110 -> 150
- - GE cost: 55 -> 65
- - Auxiliary Armament Targeting, BR-361, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 200 -> 240
- - SL cost: 120 -> 170
- - GE cost: 60 -> 75
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 185 -> 220
- - SL cost: 110 -> 155
- - GE cost: 55 -> 65
- - talisman: 300 -> 410 GE
- - Bezuprechny:
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 158 / 159 -> 202 / 197 SL/minute
- - full stock repair cost: 1196 / 1873 -> 1528 / 2325 SL
- - full spaded repair cost: 1555 / 2435 -> 1987 / 3023 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 1.38 / 3.18 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mines, New Pumps, Torpedo Mode:
- - RP cost: 460 -> 520
- - SL cost: 520 -> 730
- - GE cost: 130 -> 145
- - Anti-Air Armament Targeting, BR-365, Damage Control Division, Dry-Docking, PB-46A SAPCBC:
- - RP cost: 340 -> 380
- - SL cost: 380 -> 530
- - GE cost: 95 -> 105
- - Auxiliary Armament Targeting, Fire Division, O-365MF, Rudder Replacement, Smokescreen:
- - RP cost: 380 -> 430
- - SL cost: 430 -> 600
- - GE cost: 105 -> 120
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 350 -> 400
- - SL cost: 400 -> 560
- - GE cost: 95 -> 110
- - talisman: 640 -> 750 GE
- - Bravy:
- - 89000 -> 33000 RP
- - 300000 -> 115000 SL
- - crew cost: 87000 -> 33000 SL
- - expert crew cost: 300000 -> 115000 SL
- - ace crew cost: 520000 / 1100 -> 440000 RP / 820 GE
- - minimum repair cost: 838 / 619 -> 586 / 484 SL/minute
- - full stock repair cost: 6849 / 7688 -> 4791 / 6014 SL
- - full spaded repair cost: 8883 / 9972 -> 6214 / 7800 SL
- - SL multiplier: 3.4 / 6.0 / 1.0 -> 2.89 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.6
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, ZS-42R HE-VTF:
- - RP cost: 5100 -> 2300
- - SL cost: 8800 -> 4300
- - GE cost: 300 -> 260
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, PB-42 SAPCBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 1700
- - SL cost: 6700 -> 3200
- - GE cost: 230 -> 190
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 4400 -> 1900
- - SL cost: 7600 -> 3600
- - GE cost: 260 -> 210
- - talisman: 1700 -> 1400 GE
- - Chapayev:
- - 75000 -> 46000 RP
- - 250000 -> 150000 SL
- - crew cost: 72000 -> 43000 SL
- - expert crew cost: 250000 -> 150000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, ZS-55R HE-VTF:
- - RP cost: 5400 -> 3600
- - SL cost: 10000 -> 6500
- - Anti-Air Armament Targeting, B-35, Damage Control Division, Dry-Docking, ZS-55F:
- - RP cost: 2700 -> 1800
- - SL cost: 5200 -> 3200
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 1700
- - SL cost: 4900 -> 3100
- - GE cost: 185 -> 190
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35F:
- - RP cost: 2800 -> 1900
- - SL cost: 5400 -> 3400
- - Imperatritsa Mariya:
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 1003 / 996 -> 1056 / 1039 SL/minute
- - full stock repair cost: 23791 / 29544 -> 25051 / 30816 SL
- - full spaded repair cost: 29926 / 37162 -> 31511 / 38763 SL
- - SL multiplier: 4.44 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 11000 -> 8800
- - SL cost: 18000 -> 15000
- - GE cost: 440 -> 450
- - Anti-Air Armament Targeting, B-17, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAPBC:
- - RP cost: 5300 -> 4400
- - SL cost: 8500 -> 7600
- - GE cost: 210 -> 220
- - Auxiliary Armament Targeting, Fire Division, PB-17 SAPCBC, Rudder Replacement:
- - RP cost: 7400 -> 6100
- - SL cost: 12000 -> 11000
- - GE cost: 290 -> 310
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 5400
- - SL cost: 11000 -> 9300
- - GE cost: 260 -> 280
- - talisman: 1900 -> 2000 GE
- - Izmail:
- - 175000 -> 180000 RP
- - 490000 -> 540000 SL
- - crew cost: 140000 -> 155000 SL
- - expert crew cost: 490000 -> 540000 SL
- - ace crew cost: 670000 / 1500 -> 780000 RP / 1800 GE
- - minimum repair cost: 1068 / 1053 -> 1081 / 1053 SL/minute
- - full stock repair cost: 25879 / 31739 -> 26178 / 31739 SL
- - full spaded repair cost: 32552 / 39923 -> 32928 / 39923 SL
- - SL multiplier: 4.43 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.9 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - SL cost: 22000 -> 24000
- - GE cost: 420 -> 500
- - Anti-Air Armament Targeting, BP obr. 1911 g., Damage Control Division, Dry-Docking, PB obr. 1911 g. SAPBC:
- - RP cost: 6900 -> 6700
- - GE cost: 210 -> 240
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 390 -> 430
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 8300
- - GE cost: 260 -> 290
- - talisman: 2000 -> 2200 GE
- - Kerch, My┼Їk┼Ї, Dupleix: expert crew cost: 510000 -> 370000 SL
- - Kirov:
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3600 -> 2300
- - SL cost: 7000 -> 4300
- - GE cost: 310 -> 320
- - Anti-Air Armament Targeting, B-32, Damage Control Division, Dry-Docking, ZS-56F:
- - RP cost: 2200 -> 1400
- - SL cost: 4200 -> 2600
- - GE cost: 190 -> 195
- - Auxiliary Armament Targeting, Fire Division, PB-32 SAPCBC, Rudder Replacement, Smokescreen, ZS-56R HE-VTF:
- - RP cost: 2100 -> 1300
- - SL cost: 4100 -> 2400
- - AZ-ZS-32F, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1400
- - SL cost: 4400 -> 2600
- - Krasny Kavkaz:
- - 47000 -> 55000 SL
- - crew cost: 13000 -> 16000 SL
- - expert crew cost: 47000 -> 55000 SL
- - ace crew cost: 280000 / 400 -> 320000 RP / 500 GE
- - minimum repair cost: 277 / 281 -> 321 / 300 SL/minute
- - full stock repair cost: 3688 / 5900 -> 4268 / 6281 SL
- - full spaded repair cost: 4803 / 7682 -> 5558 / 8179 SL
- - SL multiplier: 2.58 / 5.55 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1600 -> 1300
- - SL cost: 2600 -> 2500
- - GE cost: 240 -> 270
- - Anti-Air Armament Targeting, B-32, Damage Control Division, Dry-Docking:
- - RP cost: 990 -> 790
- - SL cost: 1600 -> 1500
- - GE cost: 150 -> 165
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, PB-32 SAPCBC, Rudder Replacement, Smokescreen:
- - RP cost: 740 -> 590
- - SL cost: 1200 -> 1100
- - GE cost: 115 -> 125
- - AZ-ZS-32F, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 830 -> 660
- - SL cost: 1400 -> 1300
- - GE cost: 125 -> 140
- - talisman: 980 -> 1100 GE
- - Krasny Krym:
- - 26000 -> 25000 RP
- - 76000 -> 87000 SL
- - crew cost: 22000 -> 25000 SL
- - expert crew cost: 76000 -> 87000 SL
- - ace crew cost: 320000 / 500 -> 390000 RP / 700 GE
- - minimum repair cost: 318 / 303 -> 464 / 344 SL/minute
- - full stock repair cost: 4212 / 5860 -> 6149 / 6649 SL
- - full spaded repair cost: 5477 / 7620 -> 7996 / 8646 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.62 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2200 -> 2000
- - SL cost: 4100 -> 4000
- - GE cost: 260 -> 310
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, PB obr. 1928 g. SAPBC:
- - RP cost: 1300 -> 1200
- - GE cost: 155 -> 185
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 1200 -> 1100
- - GE cost: 140 -> 170
- - DG obr. 1928 g.F, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 1000
- - SL cost: 2100 -> 2000
- - GE cost: 130 -> 155
- - talisman: 1100 -> 1300 GE
- - Kronshtadt:
- - 390000 -> 260000 RP
- - 1050000 -> 780000 SL
- - crew cost: 300000 -> 220000 SL
- - expert crew cost: 1050000 -> 780000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 590 -> 580
- - Anti-Air Armament Targeting, B-35, BR, Damage Control Division, Dry-Docking:
- - RP cost: 12000 -> 9100
- - SL cost: 19000 -> 16000
- - GE cost: 290 -> 300
- - Auxiliary Armament Targeting, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement:
- - RP cost: 17000 -> 13000
- - SL cost: 26000 -> 22000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35F:
- - RP cost: 12000 -> 9400
- - SL cost: 19000 -> 16000
- - GE cost: 290 -> 310
- - Letuchiy: modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 360 -> 320
- - SL cost: 220 -> 170
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Perforante, Spr.Gr. L/4.5 Br. Lh 31 HEFI, stgr m/39 SAP:
- - RP cost: 150 -> 130
- - SL cost: 90 -> 70
- - Auxiliary Armament Targeting, Contro-aereaF, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 200 -> 180
- - SL cost: 120 -> 95
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 220 -> 200
- - SL cost: 135 -> 105
- - GE cost: 65 -> 70
- - Maxim Gorky:
- - 230000 -> 145000 RP
- - 640000 -> 440000 SL
- - crew cost: 185000 -> 125000 SL
- - expert crew cost: 640000 -> 440000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 14000 -> 8900
- - SL cost: 22000 -> 15000
- - GE cost: 460 -> 470
- - Anti-Air Armament Targeting, B-32, Damage Control Division, Dry-Docking, ZS-56F:
- - RP cost: 8700 -> 5500
- - SL cost: 13000 -> 9400
- - Auxiliary Armament Targeting, Fire Division, PB-32 SAPCBC, Rudder Replacement, Smokescreen, ZS-56R HE-VTF:
- - RP cost: 8200 -> 5100
- - SL cost: 13000 -> 8700
- - AZ-ZS-32F, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 9100 -> 5700
- - SL cost: 14000 -> 9700
- - Mikhail Kutuzov:
- - 52000 -> 36000 RP
- - 310000 -> 230000 SL
- - crew cost: 90000 -> 67000 SL
- - expert crew cost: 310000 -> 230000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, ZS-55R HE-VTF:
- - RP cost: 7600 -> 5500
- - SL cost: 13000 -> 9800
- - Anti-Air Armament Targeting, B-35, Damage Control Division, Dry-Docking, ZS-55F:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 4800
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4500
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35F:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5000
- - Moskva:
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode: RP cost: 560 -> 550
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361DF, PB-46A SAPCBC: RP cost: 280 -> 270
- - Auxiliary Armament Targeting, BR-361, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 310 -> 300
- - GE cost: 85 -> 80
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF: RP cost: 290 -> 280
- - Murmansk, Neustrashimy, Geniere (GE): expert crew cost: 400000 -> 240000 SL
- - Novorossiysk:
- - 380000 -> 220000 RP
- - 990000 -> 660000 SL
- - crew cost: 280000 -> 190000 SL
- - expert crew cost: 990000 -> 660000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 21000
- - SL cost: 49000 -> 36000
- - GE cost: 680 -> 670
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 19000 -> 13000
- - SL cost: 29000 -> 22000
- - GE cost: 410 -> 420
- - Auxiliary Armament Targeting, Fire Division, Granata Perforante, Palla, Rudder Replacement:
- - RP cost: 13000 -> 8800
- - SL cost: 20000 -> 15000
- - Granata Dirompente Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 8100
- - SL cost: 18000 -> 14000
- - Ognevoy:
- - 7900 -> 9000 RP
- - 10000 -> 16000 SL
- - crew cost: 3000 -> 4500 SL
- - expert crew cost: 10000 -> 16000 SL
- - ace crew cost: 160000 / 125 -> 190000 RP / 180 GE
- - minimum repair cost: 114 -> 159 SL/minute
- - full stock repair cost: 839 / 1329 -> 1170 / 1850 SL
- - full spaded repair cost: 1092 / 1729 -> 1522 / 2406 SL
- - SL multiplier: 0.88 / 1.73 / 1.0 -> 1.15 / 2.25 / 1.0
- - RP multiplier: 1.12 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 450 -> 550
- - SL cost: 440 -> 610
- - GE cost: 125 -> 145
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361DF, PB-46A SAPCBC:
- - RP cost: 280 -> 340
- - SL cost: 270 -> 380
- - GE cost: 80 -> 90
- - Auxiliary Armament Targeting, BR-361, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 310 -> 380
- - SL cost: 300 -> 420
- - GE cost: 85 -> 100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 290 -> 350
- - SL cost: 280 -> 390
- - GE cost: 80 -> 90
- - talisman: 530 -> 640 GE
- - Parizhskaya Kommuna:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - minimum repair cost: 1071 / 1056 -> 1083 / 1056 SL/minute
- - full stock repair cost: 25944 / 31819 -> 26244 / 31819 SL
- - full spaded repair cost: 32552 / 39923 -> 32928 / 39923 SL
- - SL multiplier: 4.43 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, PB-46 HE:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 19000
- - GE cost: 450 -> 480
- - Anti-Air Armament Targeting, B-17, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAP:
- - RP cost: 6900 -> 5500
- - SL cost: 11000 -> 9400
- - GE cost: 220 -> 240
- - Auxiliary Armament Targeting, Fire Division, PB-17 SAPCBC, Rudder Replacement:
- - RP cost: 9700 -> 7700
- - SL cost: 15000 -> 13000
- - GE cost: 310 -> 330
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6800
- - SL cost: 14000 -> 12000
- - GE cost: 280 -> 290
- - talisman: 2000 -> 2100 GE
- - Poltava:
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 11000 -> 6800
- - SL cost: 18000 -> 12000
- - GE cost: 440 -> 420
- - Anti-Air Armament Targeting, B-17, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAP:
- - RP cost: 5300 -> 3400
- - SL cost: 8500 -> 5900
- - Auxiliary Armament Targeting, Fire Division, PB-17 SAPCBC, Rudder Replacement:
- - RP cost: 7400 -> 4700
- - SL cost: 12000 -> 8100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Ryany:
- - crew cost: 2300 -> 1900 SL
- - expert crew cost: 15000 -> 13000 SL
- - Shcherbakov:
- - 230000 -> 145000 RP
- - 640000 -> 440000 SL
- - crew cost: 185000 -> 125000 SL
- - expert crew cost: 640000 -> 440000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, ZS-55R HE-VTF:
- - RP cost: 18000 -> 11000
- - SL cost: 28000 -> 19000
- - GE cost: 570 -> 550
- - Anti-Air Armament Targeting, B-35, Damage Control Division, Dry-Docking, ZS-55F:
- - RP cost: 8700 -> 5500
- - SL cost: 13000 -> 9400
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 8200 -> 5100
- - SL cost: 13000 -> 8700
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35F:
- - RP cost: 9100 -> 5700
- - SL cost: 14000 -> 9700
- - Soobrazitelny:
- - 9200 -> 13000 RP
- - 16000 -> 31000 SL
- - crew cost: 4500 -> 9000 SL
- - expert crew cost: 16000 -> 31000 SL
- - ace crew cost: 190000 / 180 -> 250000 RP / 320 GE
- - minimum repair cost: 158 / 159 -> 247 SL/minute
- - full stock repair cost: 1196 / 1873 -> 1868 / 2902 SL
- - full spaded repair cost: 1555 / 2435 -> 2429 / 3774 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 1.65 / 3.8 / 1.0
- - RP multiplier: 1.18 -> 1.3
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 550 -> 710
- - SL cost: 620 -> 1100
- - GE cost: 145 -> 185
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361DF, PB-46A SAPCBC:
- - RP cost: 340 -> 440
- - SL cost: 380 -> 670
- - GE cost: 90 -> 115
- - Auxiliary Armament Targeting, BR-361, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 380 -> 490
- - SL cost: 430 -> 740
- - GE cost: 100 -> 130
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 350 -> 450
- - SL cost: 400 -> 680
- - GE cost: 95 -> 115
- - talisman: 640 -> 860 GE
- - Sovetsky Soyuz:
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 26000 -> 25000
- - SL cost: 41000 -> 42000
- - Anti-Air Armament Targeting, B-35, BP obr. 1928 g., Damage Control Division, Dry-Docking:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 340 -> 330
- - Auxiliary Armament Targeting, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement:
- - RP cost: 18000 -> 17000
- - GE cost: 480 -> 470
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35F:
- - SL cost: 21000 -> 22000
- - GE cost: 340 -> 360
- - Spokoinyy:
- - 26000 -> 21000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 320 / 326 -> 374 / 368 SL/minute
- - full stock repair cost: 2436 / 3879 -> 2849 / 4373 SL
- - full spaded repair cost: 3119 / 4967 -> 3648 / 5600 SL
- - SL multiplier: 2.12 / 5.39 / 1.0 -> 2.37 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode, ZS-42R HE-VTF:
- - RP cost: 1700 -> 1200
- - SL cost: 3200 -> 2400
- - GE cost: 190 -> 210
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 1500 -> 1100
- - SL cost: 2800 -> 2200
- - GE cost: 170 -> 195
- - Damage Control Division, Dry-Docking, PB-42 SAPCBC:
- - RP cost: 1800 -> 1300
- - SL cost: 3400 -> 2600
- - GE cost: 200 -> 230
- - Depth Charges, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 780
- - SL cost: 2100 -> 1600
- - GE cost: 125 -> 135
- - talisman: 1100 -> 1200 GE
- - Sverdlov:
- - 45000 -> 30000 RP
- - 300000 -> 185000 SL
- - crew cost: 87000 -> 53000 SL
- - expert crew cost: 300000 -> 185000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode, ZS-55R HE-VTF:
- - RP cost: 5100 -> 3500
- - SL cost: 8800 -> 6400
- - Anti-Air Armament Targeting, B-35, Damage Control Division, Dry-Docking, ZS-55F:
- - RP cost: 3100 -> 2200
- - SL cost: 5300 -> 4000
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 2900 -> 2000
- - SL cost: 5000 -> 3700
- - GE cost: 210 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35F:
- - RP cost: 3300 -> 2300
- - SL cost: 5700 -> 4200
- - GE cost: 230 -> 240
- - Tashkent:
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1600 -> 1100
- - SL cost: 2600 -> 1900
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361DF, PB-46A SAPCBC:
- - RP cost: 790 -> 550
- - SL cost: 1300 -> 940
- - Auxiliary Armament Targeting, BR-361, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 620
- - SL cost: 1500 -> 1100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 830 -> 580
- - SL cost: 1400 -> 990
- - Voroshilov:
- - 105000 -> 73000 RP
- - 310000 -> 230000 SL
- - crew cost: 90000 -> 67000 SL
- - expert crew cost: 310000 -> 230000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 6000 -> 4400
- - SL cost: 10000 -> 7800
- - GE cost: 380 -> 390
- - Anti-Air Armament Targeting, B-32, Damage Control Division, Dry-Docking, ZS-56F:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 4800
- - Auxiliary Armament Targeting, Fire Division, PB-32 SAPCBC, Rudder Replacement, Smokescreen, ZS-56R HE-VTF:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4500
- - AZ-ZS-32F, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5000
- - Abdiel (M 39): modification changes:
- - Ammo Wetting, Engine Maintenance, Mines, New Pumps:
- - RP cost: 840 -> 780
- - GE cost: 200 -> 210
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. Va SAP:
- - RP cost: 420 -> 380
- - SL cost: 560 -> 530
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 390 -> 360
- - SL cost: 520 -> 510
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 430 -> 400
- - SL cost: 570 -> 560
- - Arethusa (26):
- - 26000 -> 21000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 321 / 303 -> 365 / 299 SL/minute
- - full stock repair cost: 4274 / 5860 -> 4855 / 5785 SL
- - full spaded repair cost: 5558 / 7620 -> 6314 / 7523 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.26 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1200
- - SL cost: 3200 -> 2400
- - GE cost: 230 -> 260
- - Anti-Air Armament Targeting, C.P.C. SAPBC, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - RP cost: 1100 -> 750
- - SL cost: 2100 -> 1500
- - GE cost: 150 -> 160
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 1000 -> 710
- - SL cost: 1900 -> 1400
- - GE cost: 135 -> 150
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 780
- - SL cost: 2100 -> 1600
- - GE cost: 150 -> 165
- - talisman: 1100 -> 1200 GE
- - Barham (04):
- - 380000 -> 220000 RP
- - 990000 -> 660000 SL
- - crew cost: 280000 -> 190000 SL
- - expert crew cost: 990000 -> 660000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 21000
- - SL cost: 49000 -> 36000
- - GE cost: 640 -> 630
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. Ia:
- - RP cost: 12000 -> 7800
- - SL cost: 18000 -> 13000
- - GE cost: 240 -> 230
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 15000
- - SL cost: 34000 -> 26000
- - GE cost: 440 -> 450
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 9800
- - SL cost: 23000 -> 17000
- - Brissenden (L 79):
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 450 -> 440
- - GE cost: 130 -> 135
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. Va SAP: RP cost: 280 -> 270
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen: RP cost: 260 -> 250
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: RP cost: 290 -> 280
- - Calpe (L 71):
- - 5900 -> 5300 RP
- - 6300 -> 5000 SL
- - crew cost: 1800 -> 1400 SL
- - expert crew cost: 6300 -> 5000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 480 -> 430
- - SL cost: 360 -> 310
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. Va SAP:
- - RP cost: 240 -> 210
- - SL cost: 180 -> 150
- - GE cost: 70 -> 65
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 220 -> 195
- - SL cost: 165 -> 140
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 250 -> 220
- - SL cost: 190 -> 155
- - Colossus:
- - 125000 -> 145000 RP
- - 360000 -> 440000 SL
- - crew cost: 105000 -> 125000 SL
- - expert crew cost: 360000 -> 440000 SL
- - ace crew cost: 620000 / 1400 -> 720000 RP / 1700 GE
- - minimum repair cost: 1005 / 999 -> 1058 / 1042 SL/minute
- - full stock repair cost: 23851 / 29618 -> 25114 / 30894 SL
- - full spaded repair cost: 29926 / 37162 -> 31511 / 38763 SL
- - SL multiplier: 4.44 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.84 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 15000
- - SL cost: 22000 -> 26000
- - GE cost: 520 -> 610
- - Anti-Air Armament Targeting, C.P.C. SAPBC, Damage Control Division, Dry-Docking, Mk. VIa:
- - RP cost: 5300 -> 5500
- - SL cost: 8500 -> 9400
- - GE cost: 200 -> 220
- - Auxiliary Armament Targeting, Fire Division, Mk. VIIa SAPCBC, Rudder Replacement:
- - RP cost: 7400 -> 7700
- - SL cost: 12000 -> 13000
- - GE cost: 280 -> 310
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 6800
- - SL cost: 11000 -> 12000
- - GE cost: 250 -> 280
- - talisman: 1900 -> 2100 GE
- - Daring (D 05):
- - 13000 -> 11000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 321 / 328 -> 375 / 372 SL/minute
- - full stock repair cost: 2443 / 3879 -> 2854 / 4400 SL
- - full spaded repair cost: 3128 / 4967 -> 3654 / 5634 SL
- - SL multiplier: 2.14 / 5.23 / 1.0 -> 2.39 / 5.85 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1200
- - SL cost: 3200 -> 2400
- - GE cost: 210 -> 230
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 1000 -> 710
- - SL cost: 1900 -> 1400
- - GE cost: 125 -> 140
- - C.P. SAP, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 940
- - SL cost: 2400 -> 1900
- - GE cost: 160 -> 185
- - talisman: 1100 -> 1200 GE
- - Diana (D 126):
- - 47000 -> 55000 SL
- - crew cost: 13000 -> 16000 SL
- - expert crew cost: 47000 -> 55000 SL
- - ace crew cost: 280000 / 400 -> 320000 RP / 500 GE
- - minimum repair cost: 283 / 285 -> 321 / 328 SL/minute
- - full stock repair cost: 2155 / 3367 -> 2443 / 3879 SL
- - full spaded repair cost: 2760 / 4311 -> 3128 / 4967 SL
- - SL multiplier: 1.89 / 4.62 / 1.0 -> 2.14 / 5.23 / 1.0
- - RP multiplier: 1.36 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 1000
- - SL cost: 2100 -> 1900
- - GE cost: 200 -> 210
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 740 -> 590
- - SL cost: 1200 -> 1100
- - GE cost: 115 -> 125
- - C.P. SAP, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 790
- - SL cost: 1600 -> 1500
- - GE cost: 150 -> 165
- - talisman: 980 -> 1100 GE
- - Dido (37):
- - 61000 -> 46000 RP
- - 230000 -> 150000 SL
- - crew cost: 65000 -> 43000 SL
- - expert crew cost: 230000 -> 150000 SL
- - ace crew cost: 440000 / 820 -> 480000 RP / 940 GE
- - minimum repair cost: 586 / 420 -> 722 / 497 SL/minute
- - full stock repair cost: 8140 / 8517 -> 10026 / 10087 SL
- - full spaded repair cost: 10600 / 11090 -> 13054 / 13135 SL
- - SL multiplier: 3.97 / 6.0 / 1.0 -> 4.33 / 6.0 / 1.0
- - RP multiplier: 1.6 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 4500 -> 3600
- - SL cost: 8700 -> 6500
- - GE cost: 350 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. II SAPBC:
- - RP cost: 2200 -> 1800
- - SL cost: 4200 -> 3200
- - GE cost: 170 -> 190
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 2000
- - SL cost: 4800 -> 3600
- - GE cost: 195 -> 210
- - Improved Rangefinder, Mk. I HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1900
- - SL cost: 4400 -> 3400
- - GE cost: 180 -> 200
- - talisman: 1400 -> 1500 GE
- - Dreadnought:
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 950 / 949 -> 993 / 992 SL/minute
- - full stock repair cost: 21787 / 27490 -> 22774 / 28736 SL
- - full spaded repair cost: 27336 / 34492 -> 28574 / 36055 SL
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 12000
- - SL cost: 22000 -> 21000
- - GE cost: 490 -> 540
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. VIa, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 5400
- - SL cost: 11000 -> 9300
- - GE cost: 230 -> 250
- - Auxiliary Armament Targeting, Fire Division, Mk. VIIa SAPCBC, Rudder Replacement:
- - RP cost: 7400 -> 6100
- - SL cost: 12000 -> 11000
- - GE cost: 260 -> 280
- - talisman: 1900 -> 2000 GE
- - Enterprise (D 52):
- - 18000 -> 21000 RP
- - 47000 -> 70000 SL
- - crew cost: 13000 -> 20000 SL
- - expert crew cost: 47000 -> 70000 SL
- - ace crew cost: 280000 / 400 -> 360000 RP / 590 GE
- - minimum repair cost: 267 / 271 -> 351 / 284 SL/minute
- - full stock repair cost: 3549 / 5677 -> 4666 / 5961 SL
- - full spaded repair cost: 4803 / 7682 -> 6314 / 8067 SL
- - SL multiplier: 2.58 / 5.55 / 1.0 -> 3.26 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 1200
- - SL cost: 2100 -> 2400
- - GE cost: 210 -> 250
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking:
- - RP cost: 990 -> 940
- - SL cost: 1600 -> 1900
- - GE cost: 160 -> 190
- - Auxiliary Armament Targeting, C.P.C. SAPBC, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 740 -> 710
- - SL cost: 1200 -> 1400
- - GE cost: 120 -> 145
- - HE-TFF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 830 -> 780
- - SL cost: 1400 -> 1600
- - GE cost: 135 -> 160
- - talisman: 980 -> 1200 GE
- - Eskimo (F 75):
- - 7900 -> 9000 RP
- - 10000 -> 16000 SL
- - crew cost: 3000 -> 4500 SL
- - expert crew cost: 10000 -> 16000 SL
- - ace crew cost: 160000 / 125 -> 190000 RP / 180 GE
- - minimum repair cost: 115 -> 158 / 159 SL/minute
- - full stock repair cost: 870 / 1353 -> 1194 / 1870 SL
- - full spaded repair cost: 1133 / 1762 -> 1555 / 2435 SL
- - SL multiplier: 0.81 / 1.86 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.12 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mk. VIIa HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 380 -> 460
- - SL cost: 370 -> 510
- - GE cost: 115 -> 130
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - RP cost: 280 -> 340
- - SL cost: 270 -> 380
- - GE cost: 85 -> 95
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Mk. VIIaF, Rudder Replacement, Smokescreen:
- - RP cost: 260 -> 320
- - SL cost: 250 -> 360
- - GE cost: 80 -> 90
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 290 -> 350
- - SL cost: 280 -> 390
- - GE cost: 90 -> 100
- - talisman: 530 -> 640 GE
- - Glorious (77):
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 11000 -> 6800
- - SL cost: 18000 -> 12000
- - GE cost: 410 -> 400
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. XIIa:
- - RP cost: 5300 -> 3400
- - SL cost: 8500 -> 5900
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 9900 -> 6300
- - SL cost: 16000 -> 11000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Hawkins (D 86):
- - 26000 -> 25000 RP
- - 76000 -> 87000 SL
- - crew cost: 22000 -> 25000 SL
- - expert crew cost: 76000 -> 87000 SL
- - ace crew cost: 320000 / 500 -> 390000 RP / 700 GE
- - minimum repair cost: 321 / 303 -> 457 / 344 SL/minute
- - full stock repair cost: 4274 / 5860 -> 6079 / 6649 SL
- - full spaded repair cost: 5558 / 7620 -> 7905 / 8646 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.62 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2200 -> 2000
- - SL cost: 4100 -> 4000
- - GE cost: 260 -> 310
- - Anti-Air Armament Targeting, C.P. SAP, C.P.C. SAPBC, Damage Control Division, Dry-Docking:
- - RP cost: 1100 -> 990
- - SL cost: 2100 -> 2000
- - GE cost: 130 -> 150
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 1200 -> 1100
- - GE cost: 140 -> 170
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 1200
- - GE cost: 155 -> 185
- - talisman: 1100 -> 1300 GE
- - Hood (51):
- - 390000 -> 350000 RP
- - ace crew cost: 890000 / 2200 -> 1010000 RP / 2600 GE
- - RP multiplier: 2.14 -> 2.26
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - SL cost: 37000 -> 40000
- - GE cost: 590 -> 650
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Va SAP, Mk. XIIa:
- - SL cost: 19000 -> 20000
- - GE cost: 290 -> 330
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Mk. XVIIb, Rudder Replacement:
- - SL cost: 20000 -> 21000
- - GE cost: 320 -> 350
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 23000 -> 25000
- - GE cost: 370 -> 410
- - talisman: 2400 -> 2700 GE
- - Invincible (85):
- - 75000 -> 73000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 67000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 570000 RP / 1200 GE
- - minimum repair cost: 749 / 753 -> 907 / 906 SL/minute
- - full stock repair cost: 17191 / 21805 -> 20800 / 26244 SL
- - full spaded repair cost: 21570 / 27359 -> 26098 / 32929 SL
- - SL multiplier: 4.16 / 5.56 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 7200 -> 7300
- - SL cost: 14000 -> 13000
- - GE cost: 430 -> 500
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. VIa:
- - SL cost: 5200 -> 4800
- - GE cost: 160 -> 185
- - Auxiliary Armament Targeting, Fire Division, Mk. VIIa SAPCBC, Rudder Replacement:
- - SL cost: 7400 -> 6800
- - GE cost: 230 -> 260
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 3400
- - SL cost: 6400 -> 6100
- - GE cost: 195 -> 230
- - talisman: 1500 -> 1800 GE
- - Kelvin (F 37):
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 158 / 159 -> 202 / 197 SL/minute
- - full stock repair cost: 1194 / 1870 -> 1526 / 2322 SL
- - full spaded repair cost: 1555 / 2435 -> 1987 / 3023 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 1.38 / 3.18 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mk. VIIa HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 460 -> 520
- - SL cost: 520 -> 730
- - GE cost: 130 -> 145
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. Va SAP:
- - RP cost: 340 -> 380
- - SL cost: 380 -> 530
- - GE cost: 95 -> 105
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, Mk. VIIaF, Rudder Replacement, Smokescreen:
- - RP cost: 320 -> 360
- - SL cost: 360 -> 510
- - GE cost: 90 -> 100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 480
- - SL cost: 470 -> 670
- - GE cost: 115 -> 130
- - talisman: 640 -> 750 GE
- - Kent (54):
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3600 -> 2300
- - SL cost: 7000 -> 4300
- - GE cost: 280 -> 290
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC:
- - RP cost: 2200 -> 1400
- - SL cost: 4200 -> 2600
- - GE cost: 170 -> 175
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 1600
- - SL cost: 4800 -> 3000
- - GE cost: 195 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 1700
- - SL cost: 5400 -> 3200
- - GE cost: 220 -> 210
- - Leander (75):
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3000 -> 1900
- - SL cost: 5800 -> 3600
- - Anti-Air Armament Targeting, C.P.C. SAPBC, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - RP cost: 2200 -> 1400
- - SL cost: 4200 -> 2600
- - GE cost: 195 -> 200
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 2100 -> 1300
- - SL cost: 4100 -> 2400
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1400
- - SL cost: 4400 -> 2600
- - GE cost: 210 -> 200
- - Liverpool (11):
- - 310000 -> 230000 SL
- - crew cost: 90000 -> 67000 SL
- - expert crew cost: 310000 -> 230000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 6000 -> 4400
- - SL cost: 10000 -> 7800
- - GE cost: 380 -> 390
- - Anti-Air Armament Targeting, C.P.C. SAPBC, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 4800
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4500
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5000
- - London (69):
- - 45000 -> 30000 RP
- - 300000 -> 185000 SL
- - crew cost: 87000 -> 53000 SL
- - expert crew cost: 300000 -> 185000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 6400 -> 4400
- - SL cost: 11000 -> 8100
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC, Mk. Va SAP:
- - RP cost: 3100 -> 2200
- - SL cost: 5300 -> 4000
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 6000 -> 4600
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2300
- - SL cost: 5700 -> 4200
- - Marlborough (79):
- - 380000 -> 260000 RP
- - 990000 -> 780000 SL
- - crew cost: 280000 -> 220000 SL
- - expert crew cost: 990000 -> 780000 SL
- - ace crew cost: 830000 / 2000 -> 890000 RP / 2200 GE
- - RP multiplier: 2.08 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 25000
- - SL cost: 49000 -> 43000
- - GE cost: 720 -> 770
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. Ia:
- - RP cost: 12000 -> 9100
- - SL cost: 18000 -> 16000
- - GE cost: 270 -> 280
- - Auxiliary Armament Targeting, Fire Division, Mk. I SAPCBC, Rudder Replacement:
- - RP cost: 16000 -> 13000
- - SL cost: 25000 -> 22000
- - GE cost: 360 -> 400
- - Improved Rangefinder, Mk. IIIa, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 9400
- - SL cost: 18000 -> 16000
- - GE cost: 270 -> 290
- - talisman: 2300 -> 2400 GE
- - Matapan (I 43) ("Armada (R 14)"):
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 900
- - SL cost: 2100 -> 1500
- - GE cost: 200 -> 195
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 740 -> 520
- - SL cost: 1200 -> 890
- - C.P. SAP, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 690
- - SL cost: 1600 -> 1200
- - Nepal (G 25):
- - 9200 -> 13000 RP
- - 16000 -> 31000 SL
- - crew cost: 4500 -> 9000 SL
- - expert crew cost: 16000 -> 31000 SL
- - ace crew cost: 190000 / 180 -> 250000 RP / 320 GE
- - minimum repair cost: 158 / 159 -> 247 / 246 SL/minute
- - full stock repair cost: 1194 / 1870 -> 1865 / 2898 SL
- - full spaded repair cost: 1555 / 2435 -> 2429 / 3774 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 1.65 / 3.8 / 1.0
- - RP multiplier: 1.18 -> 1.3
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mk. VIIa HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 460 -> 590
- - SL cost: 520 -> 890
- - GE cost: 130 -> 160
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - RP cost: 340 -> 440
- - SL cost: 380 -> 670
- - GE cost: 95 -> 120
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Mk. VIIaF, Rudder Replacement, Smokescreen:
- - RP cost: 320 -> 410
- - SL cost: 360 -> 620
- - GE cost: 90 -> 110
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 540
- - SL cost: 470 -> 820
- - GE cost: 115 -> 150
- - talisman: 640 -> 860 GE
- - Norfolk (78):
- - 37000 -> 23000 RP
- - 250000 -> 150000 SL
- - crew cost: 72000 -> 43000 SL
- - expert crew cost: 250000 -> 150000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 5400 -> 3600
- - SL cost: 10000 -> 6500
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC, Mk. Va SAP:
- - RP cost: 2700 -> 1800
- - SL cost: 5200 -> 3200
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 3000 -> 2000
- - SL cost: 5800 -> 3600
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 1900
- - SL cost: 5400 -> 3400
- - GE cost: 195 -> 200
- - Orion (52):
- - 175000 -> 180000 RP
- - 490000 -> 540000 SL
- - crew cost: 140000 -> 155000 SL
- - expert crew cost: 490000 -> 540000 SL
- - ace crew cost: 670000 / 1500 -> 780000 RP / 1800 GE
- - RP multiplier: 1.9 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 18000
- - SL cost: 30000 -> 31000
- - GE cost: 540 -> 600
- - Auxiliary Armament Targeting, C.P.B.C. SAPCBC, Fire Division, Rudder Replacement:
- - RP cost: 9700 -> 9400
- - SL cost: 15000 -> 16000
- - GE cost: 280 -> 310
- - C.P.C. SAPBC, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. IIa, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 8300
- - GE cost: 250 -> 280
- - talisman: 2000 -> 2200 GE
- - Queen Mary (14):
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 15000
- - SL cost: 30000 -> 26000
- - GE cost: 540 -> 580
- - Auxiliary Armament Targeting, Fire Division, Mk. I SAPCBC, Rudder Replacement:
- - RP cost: 9700 -> 7700
- - SL cost: 15000 -> 13000
- - GE cost: 280 -> 300
- - C.P.C. SAPBC, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. Ia, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6800
- - SL cost: 14000 -> 12000
- - GE cost: 250 -> 260
- - talisman: 2000 -> 2100 GE
- - Renown (72):
- - 230000 -> 145000 RP
- - 640000 -> 440000 SL
- - crew cost: 185000 -> 125000 SL
- - expert crew cost: 640000 -> 440000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 18000 -> 11000
- - SL cost: 28000 -> 19000
- - GE cost: 520 -> 500
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. XIIa:
- - RP cost: 8700 -> 5500
- - SL cost: 13000 -> 9400
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Mk. XVIIb, Rudder Replacement:
- - RP cost: 9800 -> 6100
- - SL cost: 15000 -> 10000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 11000 -> 6800
- - SL cost: 17000 -> 12000
- - Repulse (34):
- - 380000 -> 220000 RP
- - 990000 -> 660000 SL
- - crew cost: 280000 -> 190000 SL
- - expert crew cost: 990000 -> 660000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 19000 -> 13000
- - SL cost: 29000 -> 22000
- - GE cost: 450 -> 470
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. XIIa:
- - RP cost: 12000 -> 7800
- - SL cost: 18000 -> 13000
- - GE cost: 290 -> 280
- - Auxiliary Armament Targeting, Fire Division, Mk. XVIIb, Rudder Replacement:
- - RP cost: 16000 -> 11000
- - SL cost: 25000 -> 19000
- - GE cost: 380 -> 390
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 9800
- - SL cost: 23000 -> 17000
- - GE cost: 360 -> 350
- - Rodney (29):
- - 380000 -> 300000 RP
- - 990000 -> 900000 SL
- - crew cost: 280000 -> 260000 SL
- - expert crew cost: 990000 -> 900000 SL
- - ace crew cost: 830000 / 2000 -> 950000 RP / 2400 GE
- - RP multiplier: 2.08 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 19000 -> 17000
- - GE cost: 410 -> 450
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. Ia, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - GE cost: 320 -> 340
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 20000
- - GE cost: 470 -> 530
- - talisman: 2300 -> 2600 GE
- - Southampton (83):
- - 75000 -> 73000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 67000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 570000 RP / 1200 GE
- - minimum repair cost: 699 / 487 -> 819 / 583 SL/minute
- - full stock repair cost: 9710 / 9423 -> 11374 / 11272 SL
- - full spaded repair cost: 13157 / 12769 -> 15412 / 15274 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, Hydroplane, New Pumps, Torpedo Mode:
- - SL cost: 7000 -> 6400
- - GE cost: 290 -> 330
- - Anti-Air Armament Targeting, C.P.C. SAPBC, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - SL cost: 5200 -> 4800
- - GE cost: 220 -> 250
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - SL cost: 4900 -> 4500
- - GE cost: 200 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 5400 -> 5000
- - GE cost: 230 -> 260
- - talisman: 1500 -> 1800 GE
- - Tiger (C 20):
- - 175000 -> 110000 RP
- - 490000 -> 340000 SL
- - crew cost: 140000 -> 97000 SL
- - expert crew cost: 490000 -> 340000 SL
- - modification changes:
- - A.P.C., Damage Control Division, Dry-Docking:
- - RP cost: 12000 -> 7300
- - SL cost: 19000 -> 13000
- - GE cost: 340 -> 330
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps:
- - RP cost: 14000 -> 8800
- - SL cost: 22000 -> 15000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 9700 -> 6100
- - SL cost: 15000 -> 11000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 5400
- - SL cost: 14000 -> 9300
- - Tobruk (D 37):
- - 13000 -> 9200 RP
- - 76000 -> 55000 SL
- - crew cost: 22000 -> 16000 SL
- - expert crew cost: 76000 -> 55000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1000
- - SL cost: 3200 -> 1900
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 1000 -> 590
- - SL cost: 1900 -> 1100
- - C.P. SAP, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 790
- - SL cost: 2400 -> 1500
- - GE cost: 160 -> 165
- - Valhalla (F 9A):
- - crew cost: 1400 -> 1100 SL
- - expert crew cost: 9000 -> 7100 SL
- - Vanguard (23):
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 35000 -> 33000
- - GE cost: 880 -> 870
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. II SAPBC, Mk. XVIIb:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 330 -> 320
- - Auxiliary Armament Targeting, Fire Division, Mk. XXIIb, Rudder Replacement: RP cost: 18000 -> 17000
- - Improved Rangefinder, Mk. I HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 21000 -> 22000
- - GE cost: 330 -> 340
- - Warspite (03):
- - 390000 -> 300000 RP
- - 1050000 -> 900000 SL
- - crew cost: 300000 -> 260000 SL
- - expert crew cost: 1050000 -> 900000 SL
- - ace crew cost: 890000 / 2200 -> 950000 RP / 2400 GE
- - RP multiplier: 2.14 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 21000
- - SL cost: 37000 -> 36000
- - GE cost: 560 -> 580
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. XIIa, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - GE cost: 350 -> 360
- - Auxiliary Armament Targeting, C.P.C. SAPBC, Fire Division, Mk. XVIIb, Rudder Replacement:
- - RP cost: 13000 -> 12000
- - SL cost: 20000 -> 21000
- - GE cost: 300 -> 330
- - talisman: 2400 -> 2600 GE
- - York (90):
- - 75000 -> 59000 RP
- - 250000 -> 185000 SL
- - crew cost: 72000 -> 53000 SL
- - expert crew cost: 250000 -> 185000 SL
- - ace crew cost: 480000 / 940 -> 520000 RP / 1100 GE
- - minimum repair cost: 699 / 487 -> 779 / 543 SL/minute
- - full stock repair cost: 9710 / 9423 -> 10821 / 10502 SL
- - full spaded repair cost: 13157 / 12769 -> 14663 / 14231 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3500
- - SL cost: 8300 -> 6400
- - GE cost: 300 -> 330
- - Anti-Air Armament Targeting, C.P. SAP, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4000
- - GE cost: 190 -> 200
- - Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 3000 -> 2500
- - SL cost: 5800 -> 4600
- - GE cost: 210 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2700
- - SL cost: 6400 -> 5000
- - GE cost: 230 -> 250
- - talisman: 1500 -> 1700 GE
- - Agano:
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 4500 -> 2800
- - SL cost: 8700 -> 5300
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 4 SAP, Ventilation:
- - RP cost: 2800 -> 1700
- - SL cost: 5400 -> 3200
- - GE cost: 210 -> 200
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F, Type 98F:
- - RP cost: 2100 -> 1300
- - SL cost: 4100 -> 2400
- - Akizuki, Hatsuzuki (WTM):
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 1600 -> 1100
- - SL cost: 2600 -> 1900
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 0F, Ventilation:
- - RP cost: 990 -> 690
- - SL cost: 1600 -> 1200
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 620
- - SL cost: 1500 -> 1100
- - Amagi:
- - 400000 -> 350000 RP
- - 1080000 -> 1050000 SL
- - crew cost: 310000 -> 300000 SL
- - expert crew cost: 1080000 -> 1050000 SL
- - ace crew cost: 950000 / 2400 -> 1010000 RP / 2600 GE
- - RP multiplier: 2.2 -> 2.26
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Type 5:
- - RP cost: 25000 -> 24000
- - SL cost: 39000 -> 40000
- - GE cost: 530 -> 550
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 3, Ventilation:
- - SL cost: 23000 -> 25000
- - GE cost: 320 -> 340
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 23000 -> 22000
- - GE cost: 490 -> 500
- - talisman: 2600 -> 2700 GE
- - Aoba:
- - 37000 -> 30000 RP
- - 250000 -> 185000 SL
- - crew cost: 72000 -> 53000 SL
- - expert crew cost: 250000 -> 185000 SL
- - ace crew cost: 480000 / 940 -> 520000 RP / 1100 GE
- - minimum repair cost: 731 / 509 -> 814 / 567 SL/minute
- - full stock repair cost: 10144 / 9845 -> 11305 / 10972 SL
- - full spaded repair cost: 13157 / 12769 -> 14663 / 14231 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 7200 -> 5900
- - SL cost: 14000 -> 11000
- - GE cost: 460 -> 490
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4000
- - GE cost: 170 -> 185
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 3000 -> 2500
- - SL cost: 5800 -> 4600
- - GE cost: 190 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2700
- - SL cost: 6400 -> 5000
- - GE cost: 210 -> 230
- - talisman: 1500 -> 1700 GE
- - Ayanami:
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 161 -> 205 / 208 SL/minute
- - full stock repair cost: 1188 / 1879 -> 1509 / 2422 SL
- - full spaded repair cost: 1522 / 2406 -> 1932 / 3102 SL
- - SL multiplier: 1.15 / 2.25 / 1.0 -> 1.51 / 2.97 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 550 -> 620
- - SL cost: 620 -> 870
- - GE cost: 130 -> 150
- - AP / AP / AP / T, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 1F:
- - RP cost: 320 -> 360
- - SL cost: 360 -> 510
- - GE cost: 75 -> 85
- - Damage Control Division, Dry-Docking, IAI / IAI / IAI / T:
- - RP cost: 560 -> 640
- - SL cost: 630 -> 900
- - GE cost: 135 -> 150
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 480
- - SL cost: 470 -> 670
- - GE cost: 100 -> 115
- - talisman: 640 -> 750 GE
- - Furutaka:
- - 61000 -> 46000 RP
- - 230000 -> 150000 SL
- - crew cost: 65000 -> 43000 SL
- - expert crew cost: 230000 -> 150000 SL
- - ace crew cost: 440000 / 820 -> 480000 RP / 940 GE
- - minimum repair cost: 573 / 414 -> 702 / 489 SL/minute
- - full stock repair cost: 7951 / 8015 -> 9750 / 9462 SL
- - full spaded repair cost: 10730 / 10817 -> 13157 / 12769 SL
- - SL multiplier: 3.94 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.6 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 4500 -> 3600
- - SL cost: 8700 -> 6500
- - GE cost: 330 -> 360
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91:
- - RP cost: 2200 -> 1800
- - SL cost: 4200 -> 3200
- - GE cost: 165 -> 180
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 2500 -> 2000
- - SL cost: 4800 -> 3600
- - GE cost: 185 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 2200
- - SL cost: 5400 -> 4000
- - GE cost: 210 -> 220
- - talisman: 1400 -> 1500 GE
- - Fus┼Ї:
- - 380000 -> 300000 RP
- - 990000 -> 900000 SL
- - crew cost: 280000 -> 260000 SL
- - expert crew cost: 990000 -> 900000 SL
- - ace crew cost: 830000 / 2000 -> 950000 RP / 2400 GE
- - RP multiplier: 2.08 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 29000
- - SL cost: 49000 -> 50000
- - GE cost: 680 -> 760
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 4 SAP, Type 91:
- - RP cost: 12000 -> 11000
- - SL cost: 18000 -> 19000
- - GE cost: 260 -> 290
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Type 0 HE:
- - RP cost: 16000 -> 15000
- - SL cost: 25000 -> 26000
- - GE cost: 340 -> 390
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - GE cost: 320 -> 340
- - talisman: 2300 -> 2600 GE
- - Haguro:
- - 75000 -> 73000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 67000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 570000 RP / 1200 GE
- - minimum repair cost: 702 / 489 -> 823 / 585 SL/minute
- - full stock repair cost: 9750 / 9462 -> 11420 / 11318 SL
- - full spaded repair cost: 13157 / 12769 -> 15412 / 15274 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 5400 -> 5500
- - SL cost: 10000 -> 9800
- - GE cost: 360 -> 420
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91:
- - SL cost: 5200 -> 4800
- - GE cost: 180 -> 210
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F:
- - SL cost: 5800 -> 5300
- - GE cost: 200 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 3400
- - SL cost: 6400 -> 6100
- - GE cost: 220 -> 260
- - talisman: 1500 -> 1800 GE
- - Harukaze (DD-101):
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 560 -> 550
- - GE cost: 155 -> 160
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 260 -> 250
- - GE cost: 75 -> 70
- - Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.: RP cost: 350 -> 340
- - Depth Charges, Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: RP cost: 250 -> 240
- - Haruna, Kirishima:
- - 290000 -> 180000 RP
- - 790000 -> 540000 SL
- - crew cost: 230000 -> 155000 SL
- - expert crew cost: 790000 -> 540000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 23000 -> 14000
- - SL cost: 34000 -> 24000
- - GE cost: 500 -> 530
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 4 SAP, Type 91:
- - RP cost: 11000 -> 6700
- - SL cost: 16000 -> 11000
- - GE cost: 240 -> 250
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Type 0 HE:
- - RP cost: 16000 -> 9400
- - SL cost: 24000 -> 16000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 14000 -> 8300
- - SL cost: 21000 -> 14000
- - Hatsuharu:
- - 7900 -> 9000 RP
- - 10000 -> 16000 SL
- - crew cost: 3000 -> 4500 SL
- - expert crew cost: 10000 -> 16000 SL
- - ace crew cost: 160000 / 125 -> 190000 RP / 180 GE
- - minimum repair cost: 117 -> 161 SL/minute
- - full stock repair cost: 884 / 1376 -> 1214 / 1902 SL
- - full spaded repair cost: 1133 / 1762 -> 1555 / 2435 SL
- - SL multiplier: 0.81 / 1.86 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.12 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 450 -> 550
- - SL cost: 440 -> 610
- - GE cost: 120 -> 135
- - APHE / APHE / APHE / HE, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 1F:
- - RP cost: 260 -> 320
- - SL cost: 250 -> 360
- - GE cost: 70 -> 80
- - Damage Control Division, Dry-Docking, HE / HE / HE / APHE:
- - RP cost: 460 -> 570
- - SL cost: 450 -> 640
- - GE cost: 125 -> 140
- - HE-TF / HE-TF / HE-TF / HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 290 -> 350
- - SL cost: 280 -> 390
- - GE cost: 75 -> 85
- - talisman: 530 -> 640 GE
- - Hy┼Фga:
- - 230000 -> 180000 RP
- - 640000 -> 540000 SL
- - crew cost: 185000 -> 155000 SL
- - expert crew cost: 640000 -> 540000 SL
- - ace crew cost: 720000 / 1700 -> 780000 RP / 1800 GE
- - RP multiplier: 1.96 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 540 -> 560
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 3, Ventilation:
- - RP cost: 11000 -> 8300
- - SL cost: 17000 -> 14000
- - GE cost: 250 -> 260
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 16000 -> 12000
- - SL cost: 25000 -> 20000
- - GE cost: 360 -> 380
- - talisman: 2100 -> 2200 GE
- - Ikoma:
- - 105000 -> 59000 RP
- - 310000 -> 185000 SL
- - crew cost: 90000 -> 53000 SL
- - expert crew cost: 310000 -> 185000 SL
- - ace crew cost: 570000 / 1200 -> 520000 RP / 1100 GE
- - minimum repair cost: 719 / 767 -> 676 / 724 SL/minute
- - full stock repair cost: 13945 / 19357 -> 13111 / 18272 SL
- - full spaded repair cost: 17497 / 24288 -> 16451 / 22926 SL
- - RP multiplier: 1.78 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 10000 -> 5900
- - SL cost: 17000 -> 11000
- - GE cost: 470 -> 440
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking:
- - RP cost: 3700 -> 2200
- - SL cost: 6200 -> 4000
- - GE cost: 175 -> 165
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 7000 -> 4100
- - SL cost: 12000 -> 7500
- - GE cost: 330 -> 300
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 4700 -> 2700
- - SL cost: 7800 -> 5000
- - GE cost: 220 -> 200
- - talisman: 1800 -> 1700 GE
- - Ise:
- - 390000 -> 260000 RP
- - 1050000 -> 780000 SL
- - crew cost: 300000 -> 220000 SL
- - expert crew cost: 1050000 -> 780000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 530 -> 520
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 91, Ventilation:
- - RP cost: 15000 -> 11000
- - SL cost: 23000 -> 19000
- - GE cost: 330 -> 320
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Type 0 HE:
- - RP cost: 17000 -> 13000
- - SL cost: 26000 -> 22000
- - GE cost: 370 -> 380
- - Isuzu:
- - 47000 -> 55000 SL
- - crew cost: 13000 -> 16000 SL
- - expert crew cost: 47000 -> 55000 SL
- - ace crew cost: 280000 / 400 -> 320000 RP / 500 GE
- - minimum repair cost: 283 / 287 -> 328 / 306 SL/minute
- - full stock repair cost: 3765 / 6023 -> 4357 / 6412 SL
- - full spaded repair cost: 4803 / 7682 -> 5558 / 8179 SL
- - SL multiplier: 2.58 / 5.55 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 2100 -> 1700
- - SL cost: 3400 -> 3200
- - GE cost: 270 -> 300
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking:
- - RP cost: 1300 -> 1100
- - GE cost: 170 -> 195
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 740 -> 590
- - SL cost: 1200 -> 1100
- - GE cost: 95 -> 105
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 790
- - SL cost: 1600 -> 1500
- - GE cost: 130 -> 140
- - talisman: 980 -> 1100 GE
- - Kako:
- - 26000 -> 25000 RP
- - 76000 -> 87000 SL
- - crew cost: 22000 -> 25000 SL
- - expert crew cost: 76000 -> 87000 SL
- - ace crew cost: 320000 / 500 -> 390000 RP / 700 GE
- - minimum repair cost: 312 / 237 -> 442 / 276 SL/minute
- - full stock repair cost: 4057 / 5151 -> 5749 / 5987 SL
- - full spaded repair cost: 5497 / 6979 -> 7790 / 8113 SL
- - SL multiplier: 3.07 / 6.0 / 1.0 -> 3.8 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1600
- - GE cost: 200 -> 250
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 88, Ventilation:
- - RP cost: 1300 -> 1200
- - GE cost: 155 -> 185
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 1200 -> 1100
- - GE cost: 140 -> 170
- - talisman: 1100 -> 1300 GE
- - Kong┼Ї:
- - 390000 -> 220000 RP
- - 1050000 -> 660000 SL
- - crew cost: 300000 -> 190000 SL
- - expert crew cost: 1050000 -> 660000 SL
- - ace crew cost: 890000 / 2200 -> 830000 RP / 2000 GE
- - RP multiplier: 2.14 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 16000
- - SL cost: 37000 -> 27000
- - GE cost: 560 -> 540
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 4 SAP, Type 91:
- - RP cost: 12000 -> 7800
- - SL cost: 19000 -> 13000
- - GE cost: 280 -> 260
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Type 0 HE:
- - RP cost: 17000 -> 11000
- - SL cost: 26000 -> 19000
- - GE cost: 390 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 9800
- - SL cost: 23000 -> 17000
- - GE cost: 350 -> 330
- - talisman: 2400 -> 2300 GE
- - Kurama:
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 9100
- - SL cost: 22000 -> 16000
- - GE cost: 490 -> 500
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking, Type 3:
- - RP cost: 5300 -> 3400
- - SL cost: 8500 -> 5900
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 9900 -> 6300
- - SL cost: 16000 -> 11000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Matsu:
- - 2900 -> 4000 RP
- - 700 -> 2100 SL
- - crew cost: 200 -> 600 SL
- - expert crew cost: 1000 -> 2100 SL
- - ace crew cost: 96000 / 20 -> 110000 RP / 45 GE
- - minimum repair cost: 30 / 29 -> 59 / 58 SL/minute
- - full stock repair cost: 219 / 340 -> 434 / 682 SL
- - full spaded repair cost: 279 / 434 -> 554 / 871 SL
- - SL multiplier: 0.32 / 0.55 / 1.0 -> 0.5 / 0.86 / 1.0
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 240 -> 320
- - SL cost: 75 -> 170
- - GE cost: 85 -> 100
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking:
- - RP cost: 200 -> 260
- - SL cost: 60 -> 140
- - GE cost: 70 -> 80
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 110 -> 150
- - SL cost: 35 -> 80
- - GE cost: 40 -> 45
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 150 -> 200
- - SL cost: 45 -> 105
- - GE cost: 50 -> 60
- - talisman: 190 -> 300 GE
- - Mogami:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 19000
- - GE cost: 470 -> 500
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91:
- - RP cost: 6900 -> 5500
- - SL cost: 11000 -> 9400
- - GE cost: 230 -> 250
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 7800 -> 6100
- - SL cost: 12000 -> 10000
- - GE cost: 260 -> 280
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6800
- - SL cost: 14000 -> 12000
- - GE cost: 290 -> 310
- - talisman: 2000 -> 2100 GE
- - Murasame (DD-107):
- - 9200 -> 9000 RP
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps: RP cost: 680 -> 690
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Mk. 41 HE-VTF, Rudder Replacement, Smokescreen: GE cost: 75 -> 70
- - Damage Control Division, Dry-Docking, Mk. 42:
- - RP cost: 560 -> 570
- - SL cost: 630 -> 640
- - GE cost: 125 -> 130
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 430
- - SL cost: 470 -> 480
- - Mutsu:
- - 400000 -> 300000 RP
- - 1080000 -> 900000 SL
- - crew cost: 310000 -> 260000 SL
- - expert crew cost: 1080000 -> 900000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode, Type 5:
- - RP cost: 20000 -> 17000
- - SL cost: 31000 -> 29000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 3, Ventilation:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 23000 -> 20000
- - SL cost: 36000 -> 34000
- - GE cost: 520 -> 530
- - Sendai:
- - 36000 -> 25000 RP
- - 115000 -> 87000 SL
- - crew cost: 33000 -> 25000 SL
- - expert crew cost: 115000 -> 87000 SL
- - ace crew cost: 360000 / 590 -> 390000 RP / 700 GE
- - minimum repair cost: 350 / 284 -> 439 / 327 SL/minute
- - full stock repair cost: 4659 / 5953 -> 5834 / 6849 SL
- - full spaded repair cost: 6314 / 8067 -> 7905 / 9281 SL
- - SL multiplier: 3.26 / 6.0 / 1.0 -> 3.62 / 6.0 / 1.0
- - RP multiplier: 1.48 -> 1.54
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1900 -> 1300
- - SL cost: 4100 -> 2600
- - GE cost: 220 -> 240
- - Anti-Air Armament Targeting, AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking, Mod. 2 SAP:
- - RP cost: 1400 -> 990
- - SL cost: 3000 -> 2000
- - GE cost: 165 -> 185
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 2F:
- - RP cost: 1300 -> 930
- - SL cost: 2800 -> 1900
- - GE cost: 155 -> 175
- - Improved Rangefinder, Mod. 1 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1500 -> 1000
- - SL cost: 3300 -> 2000
- - GE cost: 180 -> 185
- - talisman: 1200 -> 1300 GE
- - Settsu:
- - 290000 -> 145000 RP
- - 790000 -> 440000 SL
- - crew cost: 230000 -> 125000 SL
- - expert crew cost: 790000 -> 440000 SL
- - ace crew cost: 780000 / 1800 -> 720000 RP / 1700 GE
- - RP multiplier: 2.02 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 31000 -> 15000
- - SL cost: 46000 -> 26000
- - GE cost: 600 -> 580
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking:
- - RP cost: 11000 -> 5500
- - SL cost: 16000 -> 9400
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 21000 -> 10000
- - SL cost: 31000 -> 17000
- - GE cost: 410 -> 380
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 14000 -> 6800
- - SL cost: 21000 -> 12000
- - GE cost: 270 -> 260
- - talisman: 2200 -> 2100 GE
- - Shimakaze:
- - 330000 -> 195000 SL
- - crew cost: 72000 -> 43000 SL
- - expert crew cost: 250000 -> 150000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 5400 -> 3600
- - SL cost: 10000 -> 6500
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking:
- - RP cost: 4500 -> 3000
- - SL cost: 8700 -> 5400
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 1F:
- - RP cost: 2500 -> 1700
- - SL cost: 4900 -> 3100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2200
- - SL cost: 6400 -> 4000
- - Suzuya:
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 877 / 641 -> 917 / 681 SL/minute
- - full stock repair cost: 12168 / 11946 -> 12722 / 12691 SL
- - full spaded repair cost: 16421 / 16122 -> 17169 / 17127 SL
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Type 0F:
- - RP cost: 8600 -> 7100
- - SL cost: 14000 -> 12000
- - GE cost: 360 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 91, Ventilation:
- - RP cost: 6600 -> 5400
- - SL cost: 11000 -> 9300
- - GE cost: 280 -> 290
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 5900 -> 4900
- - SL cost: 9400 -> 8400
- - GE cost: 250 -> 260
- - talisman: 1900 -> 2000 GE
- - Tama:
- - 26000 -> 21000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 308 / 288 -> 350 / 284 SL/minute
- - full stock repair cost: 4102 / 6036 -> 4659 / 5953 SL
- - full spaded repair cost: 5558 / 8179 -> 6314 / 8067 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.26 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Hydroplane, Mines, New Pumps, Torpedo Mode:
- - RP cost: 1200 -> 870
- - SL cost: 2200 -> 1700
- - GE cost: 180 -> 200
- - Anti-Air Armament Targeting, AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking, Mod. 2 SAP:
- - RP cost: 1100 -> 750
- - SL cost: 2100 -> 1500
- - GE cost: 165 -> 175
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 2F:
- - RP cost: 1000 -> 710
- - SL cost: 1900 -> 1400
- - GE cost: 150 -> 165
- - Improved Rangefinder, Mod. 1 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 780
- - SL cost: 2100 -> 1600
- - GE cost: 165 -> 180
- - talisman: 1100 -> 1200 GE
- - Tone:
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 9100
- - SL cost: 22000 -> 16000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91:
- - RP cost: 5300 -> 3400
- - SL cost: 8500 -> 5900
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0F:
- - RP cost: 5900 -> 3800
- - SL cost: 9400 -> 6500
- - GE cost: 230 -> 240
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Yamato:
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 26000 -> 25000
- - SL cost: 41000 -> 42000
- - GE cost: 650 -> 660
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 330 -> 320
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Type 0F: RP cost: 18000 -> 17000
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 16000 -> 15000
- - GE cost: 400 -> 390
- - Y┼Фgumo:
- - 11000 -> 13000 RP
- - 22000 -> 31000 SL
- - crew cost: 6300 -> 9000 SL
- - expert crew cost: 22000 -> 31000 SL
- - ace crew cost: 220000 / 250 -> 250000 RP / 320 GE
- - minimum repair cost: 206 / 201 -> 252 / 251 SL/minute
- - full stock repair cost: 1558 / 2370 -> 1904 / 2959 SL
- - full spaded repair cost: 1987 / 3023 -> 2429 / 3774 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 1.65 / 3.8 / 1.0
- - RP multiplier: 1.24 -> 1.3
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 840 -> 880
- - SL cost: 1100 -> 1300
- - GE cost: 175 -> 195
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking:
- - RP cost: 690 -> 730
- - SL cost: 910 -> 1100
- - GE cost: 145 -> 165
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 1F:
- - RP cost: 390 -> 410
- - SL cost: 520 -> 620
- - GE cost: 80 -> 90
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 540
- - SL cost: 690 -> 820
- - GE cost: 110 -> 120
- - talisman: 750 -> 860 GE
- - Andrea Doria:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Perforante Mod. 1916, Torpedo Mode:
- - RP cost: 11000 -> 8900
- - SL cost: 18000 -> 15000
- - GE cost: 350 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 12000 -> 9100
- - SL cost: 19000 -> 15000
- - Auxiliary Armament Targeting, Fire Division, Palla, Rudder Replacement:
- - RP cost: 9700 -> 7700
- - SL cost: 15000 -> 13000
- - GE cost: 310 -> 330
- - Improved Rangefinder, Perforante, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5700
- - SL cost: 11000 -> 9700
- - GE cost: 230 -> 250
- - talisman: 2000 -> 2100 GE
- - Attilio Regolo:
- - 36000 -> 25000 RP
- - 115000 -> 87000 SL
- - crew cost: 33000 -> 25000 SL
- - expert crew cost: 115000 -> 87000 SL
- - ace crew cost: 360000 / 590 -> 390000 RP / 700 GE
- - minimum repair cost: 358 / 243 -> 461 / 288 SL/minute
- - full stock repair cost: 4661 / 5281 -> 5998 / 6247 SL
- - full spaded repair cost: 6053 / 6859 -> 7790 / 8113 SL
- - SL multiplier: 3.43 / 6.0 / 1.0 -> 3.8 / 6.0 / 1.0
- - RP multiplier: 1.48 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mines, New Pumps, Torpedo Mode:
- - RP cost: 2300 -> 1600
- - SL cost: 5000 -> 3200
- - GE cost: 220 -> 250
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Perforante:
- - RP cost: 1800 -> 1200
- - SL cost: 3900 -> 2400
- - GE cost: 175 -> 185
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 2000 -> 1400
- - SL cost: 4300 -> 2800
- - GE cost: 195 -> 220
- - Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1500 -> 1000
- - SL cost: 3300 -> 2000
- - GE cost: 145 -> 155
- - talisman: 1200 -> 1300 GE
- - Bartolomeo Colleoni:
- - 26000 -> 21000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 309 / 288 -> 351 / 284 SL/minute
- - full stock repair cost: 4107 / 6044 -> 4666 / 5961 SL
- - full spaded repair cost: 5558 / 8179 -> 6314 / 8067 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.26 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1400 -> 1000
- - SL cost: 2600 -> 2000
- - GE cost: 185 -> 200
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 1800 -> 1300
- - SL cost: 3400 -> 2600
- - GE cost: 240 -> 270
- - Auxiliary Armament Targeting, Fire Division, Palla, Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 1000 -> 710
- - SL cost: 1900 -> 1400
- - GE cost: 130 -> 145
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 780
- - SL cost: 2100 -> 1600
- - GE cost: 145 -> 160
- - talisman: 1100 -> 1200 GE
- - Bolzano:
- - 75000 -> 73000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 67000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 570000 RP / 1200 GE
- - minimum repair cost: 700 / 479 -> 815 / 583 SL/minute
- - full stock repair cost: 9765 / 9720 -> 11365 / 11823 SL
- - full spaded repair cost: 13196 / 13135 -> 15358 / 15977 SL
- - SL multiplier: 4.33 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.78
- - modification changes:
- - Ammo Wetting, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - SL cost: 7000 -> 6400
- - GE cost: 270 -> 300
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - SL cost: 8700 -> 8000
- - GE cost: 330 -> 380
- - Auxiliary Armament Targeting, Fire Division, Perforante, Rudder Replacement, Smokescreen:
- - SL cost: 4900 -> 4500
- - GE cost: 185 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 5400 -> 5000
- - GE cost: 210 -> 240
- - talisman: 1500 -> 1800 GE
- - Camicia Nera (CN):
- - 14000 -> 11000 RP
- - 32000 -> 22000 SL
- - crew cost: 9200 -> 6300 SL
- - expert crew cost: 32000 -> 22000 SL
- - ace crew cost: 250000 / 320 -> 220000 RP / 250 GE
- - minimum repair cost: 251 / 250 -> 206 / 201 SL/minute
- - full stock repair cost: 1897 / 2947 -> 1552 / 2361 SL
- - full spaded repair cost: 2429 / 3774 -> 1987 / 3023 SL
- - SL multiplier: 1.65 / 3.8 / 1.0 -> 1.38 / 3.18 / 1.0
- - RP multiplier: 1.3 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 900 -> 620
- - SL cost: 1300 -> 870
- - GE cost: 175 -> 155
- - API-T / API-T / API-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Granata Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 520 -> 360
- - SL cost: 750 -> 510
- - GE cost: 100 -> 90
- - Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / API-T:
- - RP cost: 920 -> 640
- - SL cost: 1300 -> 900
- - GE cost: 180 -> 160
- - Granata Dirompente Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 580 -> 400
- - SL cost: 840 -> 560
- - GE cost: 115 -> 100
- - talisman: 860 -> 750 GE
- - Comandante Margottini (MA):
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode: RP cost: 450 -> 440
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen: RP cost: 390 -> 380
- - Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: RP cost: 290 -> 280
- - Damage Control Division, Dry-Docking, Perforante: RP cost: 460 -> 450
- - Conte di Cavour:
- - 390000 -> 300000 RP
- - 1050000 -> 900000 SL
- - crew cost: 300000 -> 260000 SL
- - expert crew cost: 1050000 -> 900000 SL
- - ace crew cost: 890000 / 2200 -> 950000 RP / 2400 GE
- - RP multiplier: 2.14 -> 2.2
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 29000
- - GE cost: 700 -> 760
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Perforante:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - GE cost: 330 -> 340
- - Auxiliary Armament Targeting, Fire Division, Palla, Rudder Replacement:
- - RP cost: 17000 -> 15000
- - GE cost: 370 -> 390
- - Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 11000
- - GE cost: 260 -> 290
- - talisman: 2400 -> 2600 GE
- - Dante Alighieri:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 15000
- - SL cost: 30000 -> 26000
- - GE cost: 510 -> 540
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 12000 -> 9100
- - SL cost: 19000 -> 15000
- - GE cost: 320 -> 330
- - Auxiliary Armament Targeting, Fire Division, Palla, Rudder Replacement:
- - RP cost: 9700 -> 7700
- - SL cost: 15000 -> 13000
- - GE cost: 260 -> 280
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6800
- - SL cost: 14000 -> 12000
- - GE cost: 230 -> 240
- - talisman: 2000 -> 2100 GE
- - Dardo (DR):
- - 5900 -> 4000 RP
- - 6300 -> 2100 SL
- - crew cost: 1800 -> 600 SL
- - expert crew cost: 6300 -> 2100 SL
- - ace crew cost: 135000 / 80 -> 110000 RP / 45 GE
- - minimum repair cost: 86 / 85 -> 58 / 57 SL/minute
- - full stock repair cost: 632 / 987 -> 426 / 668 SL
- - full spaded repair cost: 824 / 1285 -> 554 / 871 SL
- - SL multiplier: 0.72 / 1.24 / 1.0 -> 0.5 / 0.86 / 1.0
- - RP multiplier: 1.06 -> 1.0
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 480 -> 320
- - SL cost: 360 -> 170
- - GE cost: 115 -> 100
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 400 -> 260
- - SL cost: 300 -> 140
- - GE cost: 95 -> 80
- - Auxiliary Armament Targeting, Fire Division, Granata Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 270 -> 180
- - SL cost: 200 -> 95
- - GE cost: 65 -> 55
- - Granata Dirompente Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 250 -> 165
- - SL cost: 190 -> 90
- - GE cost: 60 -> 50
- - talisman: 410 -> 300 GE
- - Duilio:
- - 380000 -> 220000 RP
- - 990000 -> 660000 SL
- - crew cost: 280000 -> 190000 SL
- - expert crew cost: 990000 -> 660000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 21000
- - SL cost: 49000 -> 36000
- - GE cost: 680 -> 670
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Perforante:
- - RP cost: 15000 -> 9800
- - SL cost: 23000 -> 17000
- - GE cost: 320 -> 310
- - Auxiliary Armament Targeting, Fire Division, Palla, Rudder Replacement:
- - RP cost: 16000 -> 11000
- - SL cost: 25000 -> 19000
- - GE cost: 340 -> 350
- - Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 8100
- - SL cost: 18000 -> 14000
- - Etna:
- - 26000 -> 18000 RP
- - 76000 -> 55000 SL
- - crew cost: 22000 -> 16000 SL
- - expert crew cost: 76000 -> 55000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 2900 -> 1700
- - SL cost: 5400 -> 3200
- - GE cost: 330 -> 320
- - Anti-Air Armament Targeting, Damage Control Division, Dirompente HE, Dry-Docking, Perforante:
- - RP cost: 1100 -> 630
- - SL cost: 2100 -> 1200
- - GE cost: 125 -> 120
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 1500 -> 890
- - SL cost: 2800 -> 1700
- - Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 660
- - SL cost: 2100 -> 1300
- - Eugenio di Savoia:
- - 75000 -> 59000 RP
- - 250000 -> 185000 SL
- - crew cost: 72000 -> 53000 SL
- - expert crew cost: 250000 -> 185000 SL
- - ace crew cost: 480000 / 940 -> 520000 RP / 1100 GE
- - minimum repair cost: 695 / 489 -> 781 / 545 SL/minute
- - full stock repair cost: 9660 / 9449 -> 10845 / 10531 SL
- - full spaded repair cost: 13054 / 12769 -> 14656 / 14231 SL
- - SL multiplier: 4.33 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.72
- - modification changes:
- - Ammo Wetting, Bomb mortar, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3100 -> 2500
- - SL cost: 6000 -> 4600
- - GE cost: 240 -> 260
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 4500 -> 3600
- - SL cost: 8700 -> 6600
- - GE cost: 350 -> 370
- - Auxiliary Armament Targeting, Fire Division, Palla, Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 2000
- - SL cost: 4900 -> 3700
- - GE cost: 195 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 2300
- - SL cost: 5400 -> 4200
- - GE cost: 220 -> 240
- - talisman: 1500 -> 1700 GE
- - Francesco Caracciolo:
- - 380000 -> 180000 RP
- - 990000 -> 540000 SL
- - crew cost: 280000 -> 155000 SL
- - expert crew cost: 990000 -> 540000 SL
- - ace crew cost: 830000 / 2000 -> 780000 RP / 1800 GE
- - RP multiplier: 2.08 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 18000
- - SL cost: 49000 -> 31000
- - GE cost: 600 -> 560
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 19000 -> 11000
- - SL cost: 29000 -> 19000
- - GE cost: 360 -> 340
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 12000
- - SL cost: 34000 -> 20000
- - GE cost: 410 -> 380
- - Improved Rangefinder, Perforante, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 6900
- - SL cost: 18000 -> 12000
- - GE cost: 230 -> 220
- - talisman: 2300 -> 2200 GE
- - Giovanni da Verazzano:
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1600 -> 1100
- - SL cost: 2600 -> 1900
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 1300 -> 920
- - SL cost: 2100 -> 1600
- - Auxiliary Armament Targeting, Fire Division, Granata Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 620
- - SL cost: 1500 -> 1100
- - Granata Dirompente Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 830 -> 580
- - SL cost: 1400 -> 990
- - Grecale:
- - 4000 -> 5300 RP
- - 2100 -> 5000 SL
- - crew cost: 600 -> 1400 SL
- - expert crew cost: 2100 -> 5000 SL
- - ace crew cost: 110000 / 45 -> 135000 RP / 80 GE
- - minimum repair cost: 58 / 57 -> 86 / 85 SL/minute
- - full stock repair cost: 426 / 668 -> 632 / 987 SL
- - full spaded repair cost: 554 / 871 -> 824 / 1285 SL
- - SL multiplier: 0.5 / 0.86 / 1.0 -> 0.72 / 1.24 / 1.0
- - RP multiplier: 1.0 -> 1.06
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 290 -> 340
- - SL cost: 175 -> 240
- - GE cost: 85 -> 100
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 300 -> 350
- - SL cost: 180 -> 250
- - GE cost: 85 -> 100
- - Auxiliary Armament Targeting, Fire Division, Granata Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 200 -> 240
- - SL cost: 120 -> 170
- - GE cost: 60 -> 70
- - Granata Dirompente Contro-aereaF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 185 -> 220
- - SL cost: 110 -> 155
- - GE cost: 55 -> 65
- - talisman: 300 -> 410 GE
- - Impetuoso (D 558):
- - 14000 -> 13000 RP
- - 32000 -> 31000 SL
- - crew cost: 9200 -> 9000 SL
- - expert crew cost: 32000 -> 31000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 900 -> 710
- - SL cost: 1300 -> 1100
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1, Rudder Replacement, Smokescreen:
- - RP cost: 520 -> 410
- - SL cost: 750 -> 620
- - Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.:
- - RP cost: 690 -> 540
- - SL cost: 1000 -> 820
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 580 -> 450
- - SL cost: 840 -> 680
- - GE cost: 120 -> 115
- - Leone (LE):
- - 11000 -> 9000 RP
- - 22000 -> 16000 SL
- - crew cost: 6300 -> 4500 SL
- - expert crew cost: 22000 -> 16000 SL
- - ace crew cost: 220000 / 250 -> 190000 RP / 180 GE
- - minimum repair cost: 202 / 197 -> 158 / 159 SL/minute
- - full stock repair cost: 1528 / 2325 -> 1196 / 1873 SL
- - full spaded repair cost: 1987 / 3023 -> 1555 / 2435 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.24 -> 1.18
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 840 -> 690
- - SL cost: 1100 -> 770
- - GE cost: 175 -> 155
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Perforante, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 430
- - SL cost: 690 -> 480
- - GE cost: 110 -> 95
- - Auxiliary Armament Targeting, Contro-aereaF, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 470 -> 380
- - SL cost: 620 -> 420
- - GE cost: 100 -> 85
- - talisman: 750 -> 640 GE
- - Luigi di Savoia Duca degli Abruzzi:
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Contro-aereaF, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 7100 -> 4600
- - SL cost: 11000 -> 7900
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 8800 -> 5600
- - SL cost: 14000 -> 9600
- - Auxiliary Armament Targeting, Fire Division, Palla, Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 3200
- - SL cost: 7800 -> 5500
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 3500
- - SL cost: 8800 -> 6000
- - Raimondo Montecuccoli:
- - 61000 -> 46000 RP
- - 230000 -> 150000 SL
- - crew cost: 65000 -> 43000 SL
- - expert crew cost: 230000 -> 150000 SL
- - ace crew cost: 440000 / 820 -> 480000 RP / 940 GE
- - minimum repair cost: 564 / 414 -> 695 / 489 SL/minute
- - full stock repair cost: 7844 / 8004 -> 9660 / 9449 SL
- - full spaded repair cost: 10600 / 10817 -> 13054 / 12769 SL
- - SL multiplier: 3.97 / 6.0 / 1.0 -> 4.33 / 6.0 / 1.0
- - RP multiplier: 1.6 -> 1.66
- - modification changes:
- - Ammo Wetting, Bomb mortar, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 2600 -> 2100
- - SL cost: 5000 -> 3800
- - GE cost: 220 -> 240
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 3700 -> 3000
- - SL cost: 7100 -> 5400
- - GE cost: 320 -> 350
- - Auxiliary Armament Targeting, Fire Division, Palla, Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 2100 -> 1700
- - SL cost: 4100 -> 3100
- - GE cost: 180 -> 195
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1900
- - SL cost: 4400 -> 3400
- - GE cost: 195 -> 220
- - talisman: 1400 -> 1500 GE
- - Roma:
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps: RP cost: 21000 -> 20000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 16000 -> 15000
- - GE cost: 400 -> 390
- - Auxiliary Armament Targeting, Fire Division, Palla, Rudder Replacement: RP cost: 18000 -> 17000
- - Trento:
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3000 -> 1900
- - SL cost: 5800 -> 3600
- - GE cost: 240 -> 250
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 3700 -> 2300
- - SL cost: 7100 -> 4300
- - Auxiliary Armament Targeting, Fire Division, Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 2100 -> 1300
- - SL cost: 4100 -> 2400
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1400
- - SL cost: 4400 -> 2600
- - GE cost: 190 -> 185
- - Zara:
- - 125000 -> 110000 RP
- - 360000 -> 340000 SL
- - crew cost: 105000 -> 97000 SL
- - expert crew cost: 360000 -> 340000 SL
- - ace crew cost: 620000 / 1400 -> 670000 RP / 1500 GE
- - minimum repair cost: 863 / 625 -> 903 / 665 SL/minute
- - full stock repair cost: 11976 / 12091 -> 12531 / 12864 SL
- - full spaded repair cost: 16162 / 16317 -> 16911 / 17361 SL
- - RP multiplier: 1.84 -> 1.9
- - modification changes:
- - Ammo Wetting, Contro-aereaF, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 8600 -> 7100
- - SL cost: 14000 -> 12000
- - GE cost: 380 -> 400
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 8800 -> 7300
- - SL cost: 14000 -> 13000
- - GE cost: 390 -> 410
- - Auxiliary Armament Targeting, Fire Division, Perforante, Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 4100
- - SL cost: 7800 -> 7100
- - GE cost: 220 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 4500
- - SL cost: 8800 -> 7700
- - GE cost: 240 -> 260
- - talisman: 1900 -> 2000 GE
- - Bretagne:
- - 175000 -> 180000 RP
- - 490000 -> 540000 SL
- - crew cost: 140000 -> 155000 SL
- - expert crew cost: 490000 -> 540000 SL
- - ace crew cost: 670000 / 1500 -> 780000 RP / 1800 GE
- - RP multiplier: 1.9 -> 2.02
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 18000
- - SL cost: 30000 -> 31000
- - GE cost: 610 -> 680
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1910 Com., OPf mle. 1912/21 APC:
- - RP cost: 6900 -> 6700
- - GE cost: 220 -> 250
- - Auxiliary Armament Targeting, Fire Division, OPf mle. 1921 SAPBC, Rudder Replacement:
- - RP cost: 9700 -> 9400
- - SL cost: 15000 -> 16000
- - GE cost: 310 -> 350
- - Improved Rangefinder, OPf mle. 1921, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 6900
- - SL cost: 11000 -> 12000
- - GE cost: 230 -> 260
- - talisman: 2000 -> 2200 GE
- - Chacal (X 23):
- - 5900 -> 5300 RP
- - 6300 -> 5000 SL
- - crew cost: 1800 -> 1400 SL
- - expert crew cost: 6300 -> 5000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 480 -> 430
- - SL cost: 360 -> 310
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 330 -> 300
- - SL cost: 250 -> 210
- - Damage Control Division, Dry-Docking, Improved Rangefinder, OEA mle. 1925F, OPfA mle. 1923 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 300 -> 260
- - SL cost: 230 -> 185
- - GE cost: 70 -> 65
- - Colbert:
- - 61000 -> 46000 RP
- - 230000 -> 150000 SL
- - crew cost: 65000 -> 43000 SL
- - expert crew cost: 230000 -> 150000 SL
- - ace crew cost: 440000 / 820 -> 480000 RP / 940 GE
- - minimum repair cost: 562 / 403 -> 692 / 477 SL/minute
- - full stock repair cost: 7812 / 8173 -> 9621 / 9680 SL
- - full spaded repair cost: 10600 / 11090 -> 13054 / 13135 SL
- - SL multiplier: 3.97 / 6.0 / 1.0 -> 4.33 / 6.0 / 1.0
- - RP multiplier: 1.6 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3600 -> 2900
- - SL cost: 7000 -> 5200
- - GE cost: 270 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA mle. 1925F, OPf mle. 1927 SAPBC:
- - RP cost: 2200 -> 1800
- - SL cost: 4200 -> 3200
- - GE cost: 165 -> 180
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 3100 -> 2500
- - SL cost: 6000 -> 4500
- - GE cost: 230 -> 250
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 2200
- - SL cost: 5400 -> 4000
- - GE cost: 210 -> 220
- - talisman: 1400 -> 1500 GE
- - Dunkerque:
- - 380000 -> 260000 RP
- - 990000 -> 780000 SL
- - crew cost: 280000 -> 220000 SL
- - expert crew cost: 990000 -> 780000 SL
- - ace crew cost: 830000 / 2000 -> 890000 RP / 2200 GE
- - RP multiplier: 2.08 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 24000 -> 18000
- - SL cost: 37000 -> 31000
- - GE cost: 540 -> 550
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1935, OPfK mle. 1933 SAPBC:
- - RP cost: 12000 -> 9100
- - SL cost: 18000 -> 16000
- - GE cost: 270 -> 280
- - Auxiliary Armament Targeting, Fire Division, OEA mle. 1934F, Rudder Replacement:
- - RP cost: 16000 -> 13000
- - SL cost: 25000 -> 22000
- - GE cost: 360 -> 400
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 11000
- - SL cost: 23000 -> 19000
- - talisman: 2300 -> 2400 GE
- - ├Ѕmile Bertin:
- - 61000 -> 33000 RP
- - 230000 -> 115000 SL
- - crew cost: 65000 -> 33000 SL
- - expert crew cost: 230000 -> 115000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3600 -> 2300
- - SL cost: 7000 -> 4300
- - GE cost: 280 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA mle. 1925F, OPf RC mle. 1937 SAPBC:
- - RP cost: 2200 -> 1400
- - SL cost: 4200 -> 2600
- - GE cost: 170 -> 175
- - Auxiliary Armament Targeting, Fire Division, OPf mle. 1943, Rudder Replacement, Smokescreen:
- - RP cost: 2500 -> 1600
- - SL cost: 4800 -> 3000
- - GE cost: 195 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 1700
- - SL cost: 5400 -> 3200
- - GE cost: 220 -> 210
- - Guichen (D 607):
- - 11000 -> 13000 RP
- - 22000 -> 31000 SL
- - crew cost: 6300 -> 9000 SL
- - expert crew cost: 22000 -> 31000 SL
- - ace crew cost: 220000 / 250 -> 250000 RP / 320 GE
- - minimum repair cost: 206 / 201 -> 252 / 251 SL/minute
- - full stock repair cost: 1558 / 2370 -> 1904 / 2959 SL
- - full spaded repair cost: 1987 / 3023 -> 2429 / 3774 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 1.65 / 3.8 / 1.0
- - RP multiplier: 1.24 -> 1.3
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 1100 -> 1200
- - SL cost: 1500 -> 1800
- - GE cost: 190 -> 220
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 470 -> 490
- - SL cost: 620 -> 740
- - GE cost: 80 -> 90
- - Damage Control Division, Dry-Docking:
- - RP cost: 1000 -> 1100
- - SL cost: 1300 -> 1700
- - GE cost: 175 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 540
- - SL cost: 690 -> 820
- - GE cost: 90 -> 100
- - talisman: 750 -> 860 GE
- - Jeanne d'Arc:
- - 47000 -> 55000 SL
- - crew cost: 13000 -> 16000 SL
- - expert crew cost: 47000 -> 55000 SL
- - ace crew cost: 280000 / 400 -> 320000 RP / 500 GE
- - minimum repair cost: 281 / 260 -> 326 / 248 SL/minute
- - full stock repair cost: 3658 / 5650 -> 4238 / 5381 SL
- - full spaded repair cost: 4745 / 7329 -> 5497 / 6979 SL
- - SL multiplier: 2.71 / 6.0 / 1.0 -> 3.07 / 6.0 / 1.0
- - RP multiplier: 1.36 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 2100 -> 1700
- - SL cost: 3400 -> 3200
- - GE cost: 290 -> 320
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA HE-BF, OEA mle. 1925F:
- - RP cost: 790 -> 630
- - SL cost: 1300 -> 1200
- - GE cost: 110 -> 120
- - Auxiliary Armament Targeting, Fire Division, OPf SAPBC, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 710
- - SL cost: 1500 -> 1300
- - GE cost: 120 -> 135
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 790
- - SL cost: 1600 -> 1500
- - GE cost: 135 -> 150
- - talisman: 980 -> 1100 GE
- - Kl├Еber (D 603):
- - 7900 -> 7000 RP
- - 10000 -> 8700 SL
- - crew cost: 3000 -> 2500 SL
- - expert crew cost: 10000 -> 8700 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode: RP cost: 560 -> 550
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Spr.Gr. L/4.5 Bd.Z. HE-BF: RP cost: 280 -> 270
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF: RP cost: 260 -> 250
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: RP cost: 350 -> 340
- - La Combattante (L 19):
- - 5900 -> 4000 RP
- - 6300 -> 2100 SL
- - crew cost: 1800 -> 600 SL
- - expert crew cost: 6300 -> 2100 SL
- - ace crew cost: 135000 / 80 -> 110000 RP / 45 GE
- - minimum repair cost: 85 / 86 -> 59 / 58 SL/minute
- - full stock repair cost: 631 / 1003 -> 435 / 679 SL
- - full spaded repair cost: 822 / 1307 -> 566 / 885 SL
- - SL multiplier: 0.65 / 1.27 / 1.0 -> 0.45 / 0.88 / 1.0
- - RP multiplier: 1.06 -> 1.0
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 390 -> 260
- - SL cost: 300 -> 140
- - GE cost: 115 -> 100
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. Va SAP:
- - RP cost: 240 -> 160
- - SL cost: 180 -> 85
- - GE cost: 70 -> 60
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, HE-TFF, Rudder Replacement, Smokescreen:
- - RP cost: 220 -> 150
- - SL cost: 165 -> 80
- - GE cost: 65 -> 55
- - HE-VTF HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 250 -> 165
- - SL cost: 190 -> 90
- - GE cost: 75 -> 60
- - talisman: 410 -> 300 GE
- - La Galissonni├еre:
- - 75000 -> 59000 RP
- - 250000 -> 185000 SL
- - crew cost: 72000 -> 53000 SL
- - expert crew cost: 250000 -> 185000 SL
- - ace crew cost: 480000 / 940 -> 520000 RP / 1100 GE
- - minimum repair cost: 698 / 487 -> 778 / 542 SL/minute
- - full stock repair cost: 9697 / 9411 -> 10806 / 10488 SL
- - full spaded repair cost: 13157 / 12769 -> 14663 / 14231 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 4.5 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3500
- - SL cost: 8300 -> 6400
- - GE cost: 300 -> 330
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA mle. 1925F, OPf RC mle. 1937 SAPBC:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4000
- - GE cost: 190 -> 200
- - Auxiliary Armament Targeting, Fire Division, OPf mle. 1943, Rudder Replacement, Smokescreen:
- - RP cost: 3000 -> 2500
- - SL cost: 5800 -> 4600
- - GE cost: 210 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2700
- - SL cost: 6400 -> 5000
- - GE cost: 230 -> 250
- - talisman: 1500 -> 1700 GE
- - Le Malin (X 82):
- - 18000 -> 15000 RP
- - 47000 -> 38000 SL
- - crew cost: 13000 -> 11000 SL
- - expert crew cost: 47000 -> 38000 SL
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1300 -> 900
- - SL cost: 2100 -> 1500
- - GE cost: 200 -> 195
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, OPfA mle. 1924 SAPBC:
- - RP cost: 790 -> 550
- - SL cost: 1300 -> 940
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 890 -> 620
- - SL cost: 1500 -> 1100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 990 -> 690
- - SL cost: 1600 -> 1200
- - Lorraine:
- - 175000 -> 145000 RP
- - 490000 -> 440000 SL
- - crew cost: 140000 -> 125000 SL
- - expert crew cost: 490000 -> 440000 SL
- - ace crew cost: 670000 / 1500 -> 720000 RP / 1700 GE
- - RP multiplier: 1.9 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 15000
- - SL cost: 30000 -> 26000
- - GE cost: 610 -> 650
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1910 Com., OPf mle. 1912/21 APC:
- - RP cost: 6900 -> 5500
- - SL cost: 11000 -> 9400
- - GE cost: 220 -> 240
- - Auxiliary Armament Targeting, Fire Division, OPf mle. 1921 SAPBC, Rudder Replacement:
- - RP cost: 9700 -> 7700
- - SL cost: 15000 -> 13000
- - GE cost: 310 -> 330
- - Improved Rangefinder, OPf mle. 1921, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5700
- - SL cost: 11000 -> 9700
- - GE cost: 230 -> 250
- - talisman: 2000 -> 2100 GE
- - Marceau (D 601): modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode: RP cost: 840 -> 780
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 420 -> 380
- - SL cost: 560 -> 530
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 390 -> 360
- - SL cost: 520 -> 510
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 480
- - SL cost: 690 -> 670
- - Milan (X 111):
- - 9200 -> 9000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mines, New Pumps, Torpedo Mode: SL cost: 620 -> 610
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, OPfA mle. 1924 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 430
- - SL cost: 470 -> 480
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 470 -> 480
- - SL cost: 530 -> 540
- - GE cost: 105 -> 110
- - Mogador (X 61):
- - 26000 -> 21000 RP
- - 76000 -> 70000 SL
- - crew cost: 22000 -> 20000 SL
- - expert crew cost: 76000 -> 70000 SL
- - ace crew cost: 320000 / 500 -> 360000 RP / 590 GE
- - minimum repair cost: 315 / 322 -> 368 / 366 SL/minute
- - full stock repair cost: 2399 / 3809 -> 2803 / 4322 SL
- - full spaded repair cost: 3128 / 4967 -> 3654 / 5634 SL
- - SL multiplier: 2.14 / 5.23 / 1.0 -> 2.39 / 5.85 / 1.0
- - RP multiplier: 1.42 -> 1.48
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2200 -> 1500
- - SL cost: 4100 -> 3000
- - GE cost: 230 -> 250
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, OPfA mle. 1924 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 940
- - SL cost: 2400 -> 1900
- - GE cost: 140 -> 155
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 1500 -> 1100
- - SL cost: 2800 -> 2200
- - GE cost: 160 -> 180
- - talisman: 1100 -> 1200 GE
- - Paris:
- - 125000 -> 90000 RP
- - 360000 -> 280000 SL
- - crew cost: 105000 -> 80000 SL
- - expert crew cost: 360000 -> 280000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 9100
- - SL cost: 22000 -> 16000
- - GE cost: 520 -> 530
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1910, OPf mle. 1910 Com.:
- - RP cost: 5300 -> 3400
- - SL cost: 8500 -> 5900
- - Auxiliary Armament Targeting, Fire Division, OPf mle. 1921 SAPBC, Rudder Replacement:
- - RP cost: 7400 -> 4700
- - SL cost: 12000 -> 8100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 4200
- - SL cost: 11000 -> 7200
- - Primauguet:
- - 26000 -> 25000 RP
- - 76000 -> 87000 SL
- - crew cost: 22000 -> 25000 SL
- - expert crew cost: 76000 -> 87000 SL
- - ace crew cost: 320000 / 500 -> 390000 RP / 700 GE
- - minimum repair cost: 308 / 288 -> 438 / 326 SL/minute
- - full stock repair cost: 4096 / 6028 -> 5826 / 6840 SL
- - full spaded repair cost: 5558 / 8179 -> 7905 / 9281 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 3.62 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.54
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1600
- - GE cost: 210 -> 260
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA HE-BF, OEA mle. 1925F:
- - RP cost: 1100 -> 990
- - SL cost: 2100 -> 2000
- - GE cost: 135 -> 160
- - Auxiliary Armament Targeting, Fire Division, OPf SAPBC, Rudder Replacement, Smokescreen:
- - RP cost: 1200 -> 1100
- - GE cost: 150 -> 180
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 1200
- - GE cost: 160 -> 195
- - talisman: 1100 -> 1300 GE
- - Richelieu:
- - 420000 -> 400000 RP
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps: RP cost: 35000 -> 33000
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1936, OPf RC mle. 1937 SAPBC:
- - RP cost: 13000 -> 12000
- - SL cost: 21000 -> 20000
- - GE cost: 340 -> 330
- - Auxiliary Armament Targeting, Fire Division, OPf mle. 1943, Rudder Replacement:
- - RP cost: 15000 -> 14000
- - SL cost: 24000 -> 23000
- - GE cost: 400 -> 390
- - Improved Rangefinder, OEA mle. 36F, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - SL cost: 21000 -> 22000
- - GE cost: 340 -> 360
- - Strasbourg:
- - 400000 -> 300000 RP
- - 1080000 -> 900000 SL
- - crew cost: 310000 -> 260000 SL
- - expert crew cost: 1080000 -> 900000 SL
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 25000 -> 21000
- - SL cost: 39000 -> 36000
- - GE cost: 600 -> 580
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1935, OPfK mle. 1933 SAPBC:
- - RP cost: 12000 -> 11000
- - GE cost: 290 -> 310
- - Auxiliary Armament Targeting, Fire Division, OEA mle. 1934F, Rudder Replacement:
- - RP cost: 17000 -> 15000
- - SL cost: 27000 -> 26000
- - GE cost: 410 -> 420
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 13000
- - SL cost: 23000 -> 22000
- - Vauquelin (X 53):
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 158 / 159 -> 202 / 197 SL/minute
- - full stock repair cost: 1192 / 1868 -> 1524 / 2319 SL
- - full spaded repair cost: 1555 / 2435 -> 1987 / 3023 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 1.38 / 3.18 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mines, New Pumps, Torpedo Mode:
- - RP cost: 460 -> 520
- - SL cost: 520 -> 730
- - GE cost: 110 -> 125
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, OPfA mle. 1924 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 480
- - SL cost: 470 -> 670
- - GE cost: 100 -> 115
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 470 -> 540
- - SL cost: 530 -> 760
- - GE cost: 115 -> 130
- - talisman: 640 -> 750 GE
- - Vautour (X 71):
- - 7900 -> 9000 RP
- - 10000 -> 16000 SL
- - crew cost: 3000 -> 4500 SL
- - expert crew cost: 10000 -> 16000 SL
- - ace crew cost: 160000 / 125 -> 190000 RP / 180 GE
- - minimum repair cost: 115 -> 158 / 159 SL/minute
- - full stock repair cost: 869 / 1351 -> 1192 / 1868 SL
- - full spaded repair cost: 1133 / 1762 -> 1555 / 2435 SL
- - SL multiplier: 0.81 / 1.86 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.12 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 450 -> 550
- - SL cost: 440 -> 610
- - GE cost: 120 -> 135
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf mle. 1917 SAP, OPfA mle. 1924 SAPBC:
- - RP cost: 280 -> 340
- - SL cost: 270 -> 380
- - GE cost: 75 -> 85
- - Auxiliary Armament Targeting, Fire Division, OEA mle. 1917F, Rudder Replacement, Smokescreen:
- - RP cost: 310 -> 380
- - SL cost: 300 -> 420
- - GE cost: 85 -> 95
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 350 -> 430
- - SL cost: 340 -> 480
- - GE cost: 95 -> 105
- - talisman: 530 -> 640 GE
Advertisement
Add Comment
Please, Sign In to add comment