- _m -Emergency Door [hinged door] is required by each revolving door.AIso for WELL
- Cenmcorion, min 3m iong door mot is requires.
- SOLUTION PLAZA 520 1200 -InsT<:III hot wafer demonstration equipmeni on 2F. Balcony is necessary for placing
- oufdoor unit
- BALCONY 10 Install lF balcony for placing outdoor unit for residential products. Chiller < 3.4t
- [3200xi200} to be placed on i F.
- -Slab to be FL-BOO.
- - Flows are planned where customers and staffs to access from iF and service
- department and vendors to access from Bi F.
- -Assuming that the freight Ev is used for routing equipment rooftop replacement,
- setting the EV cage inner size W 1,950 x D 2, 450 x H 2,600, maximum load 2,500 .
- n: SOLUTION PLAZA -Size of the large tour bus that comes into iF Carriage to have 45 seats. Since the bus
- cannot be parked for a long time on the front street, the bus needs to be parked on
- the site. Therefore, plan to devise three devaluation points.
- -Visitor tour route: Solution Plaza [i-QFJ —»Training Center [3F]—>Contact Center 8.
- Testing Room [4F]
- -Establish a cafe {tenant} of about SOsqm to attract passersbv on iF.
- -Set up a motorbike parking tor visitors on the ground floor.
- -Install flag poles on the facade by the entrance.
- -InstaII hot water demonstration equipment on 2F. Balcony is necessary for placing
- outdoor unit-
- MEETING ROOM 2 35 30 Install iF balcony for placing outdoor unit for residential products. Chiller < 3.4t
- MEETING ROOM 3 25 30 [3200xi200} to be placed on lF.
- 2F SOLUTION PLAZA -5iob ro be FL-soo.
- MEETING ROOM 5 20 30 -Visitor tour route: Solution Plaza [i -2F] —>Training Center [SH—Contact Center &
- _—
- ___
- -Secure 60 Male Lockers and 9-18 Female Lockers.Size of the locker to be H l ,800x
- W900 {9 box].
- AP ROOM 40 50 -Between Roomi and Room3&2 to be movable partitions.
- BRAZING TRAINING CENTER 80 iOO - N0 anchor is needed to fix the equipment to the floor.
- _m -When setting up the equipment under direct management work, please use the
- CLASSROOM 2 65 70 equipment side anti-vibration stand. When setting up the equipment [the Client's
- Scope], please use the anti—vibration stand. No measures will be taken such as making
- ___the floor ot the Training Room architecturally "floating tloor structure".
- -Since 3F Training Rooms require sound insulation, it is difficult to secure the insulation
- STORAGE 1 25 quality thus the hinged doors to be used.
- 3F TRAINING CENTER In addition, the general doors are set to be single-open effective W 850, double open
- SUPPLY STORAGE effective W 1700.
- - Floor waterproofing is required for 3F Training Rooms and 4F Testing Room.
- -3F Classrooms i, 2 and 3 to be the window's side as a front. The desk size should be
- WI 400>< H750>< D600.
- -Floor waterproofing is required for Pantry, Kitchen and wet areas.
- -Visifor tour route: Solution Plaza [i -2F] —’Training Center [SH-Contact Center 8.
- Testing Room [4F]
- -When setting up the equipment under direct management work, please use the
- equipment side anti-vibration stand. When setting up the equipment (the Client's
- PRESENTATION ROOM 35 50 Scope], please use the anti-vibration stand. No measures will be taken such as making
- RELAX CENTER 25 30 the floor of the Training Room architecturally "floating floor structure".
- -Since SF Training Rooms require sound insulation, it is difficult to secure the insulation
- HVAC OURDOOR MECH SPACE 45 39 Quality thus the hinged doors to be used.
- In addition, the general doors are set to be single-open effective W 850, double open
- effective W 1700.
- - Floor waterproofing is required for 3F Training Rooms and 4F Testing Room.
- -SurveiIIance monitors ii 370mmx8] immxé monitors] and 7 monitoring seats to be
- installed.
- -FIoor waterproofing is required for