- It is with great pleasure that we're announcing that on July 25th our move to coresite will be completed.
- At 11:00 PM PST, July 25th, we will be powering down all equipment and physically moving it to
- the new coresite facility. The whole move should take no longer than two hours, with the target
- time being about one hour.
- While we're sad to be leaving the HE facilities, the benefits are worth it:
- - A far better power infrastructure. Coresite operates 11 locations and has had a total of < 5 minutes
- downtime, total, between all locations since they started operating.
- - A better network consisting of Nlayer, Bandcon (Level3/GBLX and a few others) & HE. Our latency and
- network performance should increase to many locations and help address the high latency spikes
- that occurred to our China based customers while on pure HE.
- - Room to grow. HE racks have a limit of just 15 AMP's per rack wh! ich is quite limiting with VPS nodes.
- Coresite allows us to get 40 AMP's per rack, allowing us to better utilize our rack space.
- Thank you for your patience.