Advertisement
Guest User

Untitled

a guest
May 20th, 2019
112
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 3.62 KB | None | 0 0
  1. [2019-05-21 11:14:40] [Output] : ★ Bob Thomas raises the hoist with the Nissan on it
  2. [2019-05-21 11:15:20] [Output] : ★ Bob Thomas takes his air socket gun connecting a 15mm head to remove the wheel nuts
  3. [2019-05-21 11:15:40] [Output] : ★ Bob Thomas places the gun over the nuts rattling them off the stud
  4. [2019-05-21 11:15:57] [Output] : ★ Bob Thomas removes the front right whel
  5. [2019-05-21 11:16:38] [Output] : ★ Bob Thomas takes the oxy cutting kit off the hook adjusting the KPA to 15 on Oxygen and asettalin
  6. [2019-05-21 11:17:12] [Output] : ★ Bob Thomas begings to cut through the centre of the spring making the coils fall off
  7. [2019-05-21 11:17:38] [Output] : ★ Bob Thomas kicks the coils aside and taps the rest of them free with the tourch head
  8. [2019-05-21 11:18:01] [Output] : ★ Bob Thomas places the wheel on the studs placing the nuts on hand tight
  9. [2019-05-21 11:18:15] [Output] : ★ Bob Thomas drives all 5 nuts on with his 15mm socket
  10. [2019-05-21 11:18:38] [Output] : ★ Bob Thomas drags the air hose to the rear of the nissan
  11. [2019-05-21 11:18:53] [Output] : ★ Bob Thomas places the socket over the nuts one by one driving them looes
  12. [2019-05-21 11:19:16] [Output] : ★ Bob Thomas removes the 5 nuts holding the wheel on placing the nuts and wheel on the ground next to hm
  13. [2019-05-21 11:23:47] [Output] : ★ the spring would not need to be cut as they sit in under the fource of the body ((Bob Thomas))
  14. [2019-05-21 11:24:18] [Output] : ★ Bob Thomas pushes down on the rotor as he reefs the spring on from the kframe
  15. [2019-05-21 11:24:33] [Output] : ★ Bob Thomas places the wheel on the studs putting them on hand tight
  16. [2019-05-21 11:24:46] [Output] : ★ Bob Thomas drives them on with his socket of 15mm of size
  17. [2019-05-21 11:25:11] [Output] : ★ Bob Thomas drags the hose over to the front left of the nissan
  18. [2019-05-21 11:25:29] [Output] : ★ Bob Thomas places the 15mm socket over each of the heads one by one undoing them
  19. [2019-05-21 11:25:44] [Output] : ★ Bob Thomas removes all 5 nuts and the wheel placing it on the ground
  20. [2019-05-21 11:26:06] [Output] : ★ Bob Thomas walks over and picks the cutting tool up and takes it over lighting the flame
  21. [2019-05-21 11:26:29] [Output] : ★ Bob Thomas cutting the coils one by one off the strut tower
  22. [2019-05-21 11:26:53] [Output] : ★ Bob Thomas taps the remaining coils off with the head leaving nothing but the obsorber
  23. [2019-05-21 11:27:10] [Output] : ★ Bob Thomas places the wheel back on the studs doing them up hand tight
  24. [2019-05-21 11:27:22] [Output] : ★ Bob Thomas rattles the nuts on tight with the gun
  25. [2019-05-21 11:27:55] [Output] : ★ Bob Thomas moves to the back last wheel rattling the nuts off with his 15mm air rattles gun
  26. [2019-05-21 11:28:15] [Output] : ★ Bob Thomas drives all 5 nuts off one by one as he puts them on the groun
  27. [2019-05-21 11:28:22] [Output] : ★ Bob Thomas removes the last wheel
  28. [2019-05-21 11:28:53] [Output] : ★ the spring would just about fall out due to the position of the car being low on 3 sides ((Bob Thomas))
  29. [2019-05-21 11:29:09] [Output] : ★ Bob Thomas pulls on the spring with little fource pushing down on the rotor
  30. [2019-05-21 11:29:16] [Output] : ★ th spring would pull free ((Bob Thomas))
  31. [2019-05-21 11:29:36] [Output] : ★ Bob Thomas places the wheel on the studs doing them up one by one hand tight
  32. [2019-05-21 11:29:55] [Output] : ★ Bob Thomas drives all 5 wheel nuts on as tight as the gun can get them
  33. [2019-05-21 11:30:08] [Output] : ★ Bob Thomas shuts off the commprssor and oxy set
  34. [2019-05-21 11:30:16] [Output] : ★ Bob Thomas lowers the hoist down
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement