TheWatcher666

Facebook Data Center

Jun 25th, 2019
2,548
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 4.63 KB | None | 0 0
  1. Facebook Data Center Map (Provided Pic)
  2.  
  3. Link: https://baxtel.com/data-centers/facebook#datacenter-map
  4.  
  5. Archive: Not Able To Properly Archive
  6.  
  7. ——————–
  8.  
  9. Facebook Singapore Tajong Kling
  10.  
  11. Sunview Drive
  12.  
  13. Singapore 627485
  14.  
  15. Located in Singapore
  16.  
  17. Facebook Odense Denmark
  18.  
  19. M. P. Allerups Vej 48
  20.  
  21. 5220 Odense, Denmark
  22.  
  23. Located in Denmark
  24.  
  25. 120.0 MWs Under Construction
  26.  
  27. Utility: Energinet
  28.  
  29. Facebook plans to build two data center buildings that will be 270,000 sqft each. The first building will be completed in 2020.
  30.  
  31. Facebook Esbjerg Denmark
  32.  
  33. Esbjerg
  34.  
  35. Denmark
  36.  
  37. Located in Denmark
  38.  
  39. Utility: SYD ENERGI Net A/S
  40.  
  41. ——————–
  42.  
  43. Facebook Huntsville
  44.  
  45. North Huntsville Industrial Park
  46.  
  47. Huntsville, AL 35773
  48.  
  49. Located in Huntsville
  50.  
  51. 970,000 Building SqFt
  52.  
  53. Facebook's $750 million datacenter project in Huntsville was previously known by the codename “Starbelt.” The data center will be located in the North Huntsville Industrial Park and is expected to launch in 2020.
  54.  
  55. ——————–
  56.  
  57. Facebook Clonee Ireland
  58.  
  59. Sli Na Chairde
  60.  
  61. Portan, Clonee, Co. Meath, Ireland
  62.  
  63. Located in Dublin
  64.  
  65. Facebook Los Lunas
  66.  
  67. 4250 Messenger Loop NW
  68.  
  69. Los Lunas, NM 87031
  70.  
  71. Located in Albuquerque
  72.  
  73. 30.0 Megawatts
  74.  
  75. 400,000 Building SqFt
  76.  
  77. Facebook announced the planned construction of two data centers in Los Lunas. While still under construction, Facebook announced an additional four buildings to be constructed. The siz buildings will total 2.8 million sqft.
  78.  
  79. ——————–
  80.  
  81. Facebook Luleå
  82.  
  83. Datavägen 15977 54 Luleå
  84.  
  85. Sweden
  86.  
  87. Located in Sweden
  88.  
  89. Facebook Forest City
  90.  
  91. 480 Social Circle
  92.  
  93. Forest City, NC 28043
  94.  
  95. Located in North Carolina Data Center Corridor
  96.  
  97. 40.0 Megawatts
  98.  
  99. 740,000 Building SqFt
  100.  
  101. The Forest City location consists of two buildings with 370,000 sqft each.
  102.  
  103. ——————–
  104.  
  105. Facebook Eagle Mountain Utah
  106.  
  107. Eagle Mountain
  108.  
  109. UT 84005
  110.  
  111. Located in Salt Lake City
  112.  
  113. 970,000 Building SqFt
  114.  
  115. The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
  116.  
  117. ——————–
  118.  
  119. Facebook Papillion Nebraska
  120.  
  121. Capehart Rd & S 144th St
  122.  
  123. Springfield, NE 68059
  124.  
  125. Located in Omaha
  126.  
  127. 200.0 MWs Under Construction
  128.  
  129. Q1 2020 Scheduled completion
  130.  
  131. The original plan called for 900,000 sqft data center space and a 70,000 office space. Facebook has since announced an expansion that will bring the complex to 2.6 million square feet. The first data center comes online in 2020.
  132.  
  133. ——————–
  134.  
  135. Facebook Fort Worth
  136.  
  137. 4500 Like Way
  138.  
  139. Fort Worth, TX 76177
  140.  
  141. Located in Dallas
  142.  
  143. 440,000 Building SqFt
  144.  
  145. When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
  146.  
  147. ——————–
  148.  
  149. Facebook Henrico
  150.  
  151. 6200 Technology Blvd
  152.  
  153. Sandston, VA 23150
  154.  
  155. Located in Richmond
  156.  
  157. The 970,000-square-foot Facebook data center in the White Oak Technology Park will use solar power and 100 percent renewable energy.
  158.  
  159. ——————–
  160.  
  161. Facebook Newton (Atlanta)
  162.  
  163. Social Circle
  164.  
  165. GA 30025
  166.  
  167. Located in Atlanta
  168.  
  169. Utility: Walton Electric Membership Corporation (EMC)
  170.  
  171. Facebook's data center in Social Circle just East of Atlanta is under construction and will be ready in 2020. It will be powered by 100 percent clean and renewable energy and cooled using outside air.
  172.  
  173. ——————–
  174.  
  175. Facebook Altoona Iowa
  176.  
  177. 100 Share Way NW
  178.  
  179. Altoona, IA 50009
  180.  
  181. Located in Des Moines
  182.  
  183. 117.0 Megawatts
  184.  
  185. 1,440,000 Building SqFt
  186.  
  187. Phase 1: 476,000 square-foot, $300 million building built in 2014
  188.  
  189. Phase 2: 468,000 square feet
  190.  
  191. Phase 3: 496,000 square feet
  192.  
  193. Phase 4: The fourth building will be a 'cold storage' facility. SqFt TBD.
  194.  
  195. ——————–
  196.  
  197. Facebook New Albany Ohio
  198.  
  199. 1367 Beech Road SW
  200.  
  201. New Albany, Ohio 43054
  202.  
  203. Located in Columbus
  204.  
  205. 970,000 Building SqFt
  206.  
  207. In August 2017, Facebook announced plans to build its first data center in the state in New Albany. The 970,000-square-foot facility is being constructed on 345 acres in the business park on the east side of Beech Road and south of the state Route 161 interchange.
  208.  
  209. ——————–
  210.  
  211. Facebook Prineville
  212.  
  213. 735 S.W. Connect Way
  214.  
  215. Prineville, OR 97754
  216.  
  217. Located in Bend Prineville
  218.  
  219. 40.0 Megawatts
  220.  
  221. Utility: Pacific Power
  222.  