  1. ==Facebook Data Center Map (Provided Pic)==
  2. '''Link:''' https://baxtel.com/data-centers/facebook#datacenter-map
  3. '''Archive:''' https://archive.fo/kdtJU
  4. -
  5. Facebook Singapore Tajong Kling
  6. Sunview Drive
  7. Singapore 627485
  8. Located in Singapore
  9. Facebook Odense Denmark
  10. M. P. Allerups Vej 48
  11. 5220 Odense, Denmark
  12. Located in Denmark
  13. 120.0 MWs Under Construction
  14. Utility: Energinet
  15. Facebook plans to build two data center buildings that will be 270,000 sqft each. The first building will be completed in 2020.
  16. Facebook Esbjerg Denmark
  17. Esbjerg
  18. Denmark
  19. Located in Denmark
  20. Utility: SYD ENERGI Net A/S
  21. -
  22. Facebook Huntsville
  23. North Huntsville Industrial Park
  24. Huntsville, AL 35773
  25. Located in Huntsville
  26. 970,000 Building SqFt
  27. Facebook's $750 million datacenter project in Huntsville was previously known by the codename “Starbelt.” The data center will be located in the North Huntsville Industrial Park and is expected to launch in 2020.
  28. -
  29. Facebook Clonee Ireland
  30. Sli Na Chairde
  31. Portan, Clonee, Co. Meath, Ireland
  32. Located in Dublin
  33. Facebook Los Lunas
  34. 4250 Messenger Loop NW
  35. Los Lunas, NM 87031
  36. Located in Albuquerque
  37. 30.0 Megawatts
  38. 400,000 Building SqFt
  39. Facebook announced the planned construction of two data centers in Los Lunas. While still under construction, Facebook announced an additional four buildings to be constructed. The siz buildings will total 2.8 million sqft.
  40. -
  41. Facebook Luleå
  42. Datavägen 15977 54 Luleå
  43. Sweden
  44. Located in Sweden
  45. Facebook Forest City
  46. 480 Social Circle
  47. Forest City, NC 28043
  48. Located in North Carolina Data Center Corridor
  49. 40.0 Megawatts
  50. 740,000 Building SqFt
  51. The Forest City location consists of two buildings with 370,000 sqft each.
  52. -
  53. Facebook Eagle Mountain Utah
  54. Eagle Mountain
  55. UT 84005
  56. Located in Salt Lake City
  57. 970,000 Building SqFt
  58. The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
  59. -
  60. Facebook Papillion Nebraska
  61. Capehart Rd & S 144th St
  62. Springfield, NE 68059
  63. Located in Omaha
  64. 200.0 MWs Under Construction
  65. Q1 2020 Scheduled completion
  66. The original plan called for 900,000 sqft data center space and a 70,000 office space. Facebook has since announced an expansion that will bring the complex to 2.6 million square feet. The first data center comes online in 2020.
  67. -
  68. Facebook Fort Worth
  69. 4500 Like Way
  70. Fort Worth, TX 76177
  71. Located in Dallas
  72. 440,000 Building SqFt
  73. When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
  74. -
  75. Facebook Henrico
  76. 6200 Technology Blvd
  77. Sandston, VA 23150
  78. Located in Richmond
  79. The 970,000-square-foot Facebook data center in the White Oak Technology Park will use solar power and 100 percent renewable energy.
  80. -
  81. Facebook Newton (Atlanta)
  82. Social Circle
  83. GA 30025
  84. Located in Atlanta
  85. Utility: Walton Electric Membership Corporation (EMC)
  86. Facebook's data center in Social Circle just East of Atlanta is under construction and will be ready in 2020. It will be powered by 100 percent clean and renewable energy and cooled using outside air.
  87. -
  88. Facebook Altoona Iowa
  89. 100 Share Way NW
  90. Altoona, IA 50009
  91. Located in Des Moines
  92. 117.0 Megawatts
  93. 1,440,000 Building SqFt
  94. Phase 1: 476,000 square-foot, $300 million building built in 2014
  95. Phase 2: 468,000 square feet
  96. Phase 3: 496,000 square feet
  97. Phase 4: The fourth building will be a 'cold storage' facility. SqFt TBD.
  98. -
  99. Facebook New Albany Ohio
  100. 1367 Beech Road SW
  101. New Albany, Ohio 43054
  102. Located in Columbus
  103. 970,000 Building SqFt
  104. In August 2017, Facebook announced plans to build its first data center in the state in New Albany. The 970,000-square-foot facility is being constructed on 345 acres in the business park on the east side of Beech Road and south of the state Route 161 interchange.
  105. -
  106. Facebook Prineville
  107. 735 S.W. Connect Way
  108. Prineville, OR 97754
  109. Located in Bend Prineville
  110. 40.0 Megawatts
  111. Utility: Pacific Power
  112. In 2010, Prineville was selected to house Facebook's first data center. Now plans are in place for 7 data centers on the campus with up to 3.2 million square feet.
  113.  
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement