- Date Power Reason or Comment
- 20171231 92 INCREASING POWER
- 20171230 71 INCREASING POWER
- 20171229 77 HOLDING POWER FOR FUEL SOAK
- 20171228 55 INCREASING POWER AFTER ROD PATTERN ADJUSTMENT
- 20171227 69 HOLDING POWER FOR XENON SOAK
- 20171226 50 INCREASING POWER
- 20171225 64 INCREASING POWER
- 20171224 45 INCREASING POWER
- 20171223 60 HOLDING POWER
- 20171222 40 INCREASING POWER
- 20171221 30 REDUCED POWER FOR MAINTENANCE
- 20171220 28 REDUCED POWER FOR MAINTENANCE
- 20171219 27 REDUCED POWER FOR MAINTENANCE
- 20171218 49 HOLDING POWER PENDING RESTORATION OF 4160V BUS
- 20171217 60 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20171216 73 24 HOUR XENON HOLD
- 20171215 58 INCREASING POWER PER POWER ASCENSION PLAN
- 20171214 25 HOLDING FOR WORK ON ESF TRANSFORMER
- 20171213 14 HOLDING FOR WORK ON ESF TRANSFORMER
- 20171212 19 SYNCING GENERATOR TO THE GRID
- 20171211 4 INCREASING POWER TO 100%
- 20171210 0 BELOW THE POINT OF ADDING HEAT
- 20171209 0 REPAIR DRYWELL COOLERS AND NUCLEAR INSTRUMENTATION
- 20171208 0 NO DATA FOR THIS DATE
- 20171207 0 SHUTDOWN TO REPAIR DRYWELL COOLERS
- 20171206 0 SHUTDOWN TO REPAIR DRYWELL COOLERS
- 20171205 8 DOWNPOWER DUE TO DRYWELL ENTRY FOR SEAL LEAKAGE
- 20171204 12 INCREASING POWER
- 20171203 4 STARTUP IN PROGRESS
- 20171202 0 STARTUP IN PROGRESS - JUST ABOVE POAH
- 20171201 0 FORCED OUTAGE - IRM TROUBLESHOOTING IN PROGRESS
- -----------------
- 20171130 0 FORCED OUTAGE - IRM TROUBLESHOOTING IN PROGRESS
- 20171129 0 FORCED OUTAGE - IRM TROUBLESHOOTING IN PROGRESS
- 20171128 0 FORCED OUTAGE - IRM TROUBLESHOOTING IN PROGRESS
- 20171127 0 FORCED OUTAGE - IRM TROUBLESHOOTING IN PROGRESS
- 20171126 0 FORCED OUTAGE - IRM TROUBLESHOOTING IN PROGRESS
- 20171125 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171124 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171123 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171122 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171121 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171120 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171119 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171118 0 FORCED OUTAGE - "B" RX RECIRC PUMP SEAL REPAIR IN PROGRESS
- 20171117 0 FORCED OUTAGE - SHUTDOWN DUE TO "B" RX RECIRC PUMP SEAL ISSUE
- 20171116 50 SHUTDOWN IN PROGRESS DUE TO "B" RX RECIRC PUMP SEAL ISSUE
- 20171115 100
- 20171114 90 INCREASING POWER FOLLOWING SEQUENCE EXCHANGE
- 20171113 99 REDUCED POWER DUE TO XENON SOAK
- 20171112 100
- 20171111 65 REDUCED POWER FOR SEQUENCE EXCHANGE
- 20171110 100
- 20171109 97 HOLDING POWER
- 20171108 93 SLOWLY INCREASING POWER
- 20171107 58 INCREASING POWER AFTER ROD SEQUENCE EXCHANGE
- 20171106 99 HOLDING UNTIL ROD PATTERN ADJUSTMENT
- 20171105 99 HOLDING UNTIL ROD PATTERN ADJUSTMENT
- 20171104 99 HOLDING UNTIL ROD PATTERN ADJUSTMENT
- 20171103 99 HOLDING UNTIL ROD PATTERN ADJUSTMENT
- 20171102 99 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20171101 99 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- -----------------
- 20171031 99 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20171030 99 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20171029 100
- 20171028 100
- 20171027 100
- 20171026 100
- 20171025 100
- 20171024 100
- 20171023 100
- 20171022 100
- 20171021 100
- 20171020 100
- 20171019 100
- 20171018 100
- 20171017 89 INCREASING POWER AFTER ROD PATTERN ADJUSTMENT
- 20171016 99 INCREASING POWER
- 20171015 92 INCREASING POWER
- 20171014 75 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20171013 93 MAXIMUM RECIRCULATION FLOW
- 20171012 85 RAMPING UP TO 93% POWER
- 20171011 66 RAMPING UP TO 93% POWER
- 20171010 86 HOLDING POWER FOR XENON
- 20171009 87 INCREASING POWER
- 20171008 73 INCREASING POWER
- 20171007 55 ROD PATTERN ADJUSTMENT IN PROGRESS - WILL INCREASE POWER TO 100%
- 20171006 58 WILL INCREASE POWER SHORTLY TO 75% FOLLOWING TROUBLESHOOT OF DIGITAL FEED CONTROL SYSTEM
- 20171005 60 WILL INCREASE POWER SHORTLY TO 75%
- 20171004 46 REDUCED POWER FOR MAINTENANCE
- 20171003 54 INCREASING POWER
- 20171002 18 SYNCHRONIZING GENERATOR TO GRID IN PROGRESS
- 20171001 1 STARTUP IN PROGRESS - REACTOR CRITICAL IN THE INTERMEDIATE RANGE
- -------------------------
- 20170930 0 FORCED OUTAGE - ANTICIPATE RESTART WITHIN THE NEXT 24 HOURS
- 20170929 0 FORCED OUTAGE - SEE EN #52936
- 20170928 0 FORCED OUTAGE - SEE EN #52936
- 20170927 0 FORCED OUTAGE - SEE EN #52936
- 20170926 0 FORCED OUTAGE - SEE EN #52936
- 20170925 0 FORCED OUTAGE - SEE EN #52936
- 20170924 0 FORCED OUTAGE - SEE EN #52936
- 20170923 0 FORCED OUTAGE - SEE EN #52936
- 20170922 0 FORCED OUTAGE - SEE EN #52936
- 20170921 0 FORCED OUTAGE - SEE EN #52936
- 20170920 0 SEE EN #52936
- 20170919 0 SEE EN #52936
- 20170918 0 SEE EN #52936
- 20170917 0 SEE EN #52936
- 20170916 0 SEE EN #52936
- 20170915 0 SEE EN #52936
- 20170914 0 SEE EN #52936
- 20170913 0 SEE EN #52936
- 20170912 0 SEE EN #52936
- 20170911 0 SEE EN #52936
- 20170910 0 SEE EN #52936
- 20170909 0 SEE EN #52936
- 20170908 0 SEE EN #52936
- 20170907 0 SEE EN #52936
- 20170906 0 SEE EN #52936
- 20170905 0 SEE EN #52936
- 20170904 0 SEE EN #52936
- 20170903 0 SEE EN #52936
- 20170902 0 SEE EN #52936
- 20170901 0 SEE EN #52936
- ----------------------
- 20170831 0 SEE EN #52936
- 20170830 0 SEE EN #52936
- 20170829 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170828 0 SEE EN #52936
- 20170827 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170826 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170825 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170824 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170823 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170822 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170821 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170820 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170819 65 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170818 48 REDUCED POWER FOR PLANNED MAINTENANCE ON ONE FEED PUMP
- 20170817 100
- 20170816 100
- 20170815 100
- 20170814 100
- 20170813 100
- 20170812 100
- 20170811 100
- 20170810 100
- 20170809 100
- 20170808 100
- 20170807 100
- 20170806 100
- 20170805 100
- 20170804 88 INCREASING POWER
- 20170803 99 XENON SOAK
- 20170802 96 INCREASING POWER
- 20170801 87 INCREASING POWER REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- -----------------
- 20170731 78 INCREASING POWER REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20170730 98 INCREASING POWER
- 20170729 88 INCREASING POWER
- 20170728 77 INCREASING POWER
- 20170727 90 HOLDING POWER FOR NEXT ROD PATTERN ADJUSTMENT
- 20170726 82 INCREASING POWER
- 20170725 68 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20170724 80 24 HOUR SOAK
- 20170723 80 24 HOUR SOAK
- 20170722 65 INCREASING POWER
- 20170721 59 HOLD FOR CONDENSATE BOOSTER PUMP REPAIR
- 20170720 53 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20170719 74 INCREASING POWER
- 20170718 67 INCREASING POWER
- 20170717 52 REDUCED POWER FOR FEEDWATER PUMP TESTING
- 20170716 64 REDUCED POWER FOR FEEDWATER PUMP REPAIR
- 20170715 64 REDUCED POWER FOR FEEDWATER PUMP REPAIR
- 20170714 65 REDUCED POWER FOR FEEDWATER PUMP REPAIR
- 20170713 100
- 20170712 100
- 20170711 100
- 20170710 100
- 20170709 100
- 20170708 100
- 20170707 100
- 20170706 100
- 20170705 100
- 20170704 100
- 20170703 100
- 20170702 96 INCREASING POWER
- 20170701 97 XENON SOAK
- -------------------------
- 20170630 63 INCREASING POWER
- 20170629 63 POWER SUPPRESSION TESTING
- 20170628 62 POWER SUPPRESSION TESTING
- 20170627 100
- 20170626 100
- 20170625 100
- 20170624 100
- 20170623 95 INCREASING POWER
- 20170622 100 CONSERVATIVE OPERATIONS
- 20170621 100 CONSERVATIVE OPERATIONS
- 20170620 100
- 20170619 100
- 20170618 100 NO DATA FOR THIS DATE
- 20170617 100 NO DATA FOR THIS DATE
- 20170616 100
- 20170615 100
- 20170614 100
- 20170613 100
- 20170612 100
- 20170611 100
- 20170610 100
- 20170609 100
- 20170608 100
- 20170607 100
- 20170606 100
- 20170605 100
- 20170604 100
- 20170603 100
- 20170602 100
- 20170601 100
- -------------------------
- 20170531 100
- 20170530 100
- 20170529 100
- 20170528 100
- 20170527 100
- 20170526 100
- 20170525 100
- 20170524 100
- 20170523 100
- 20170522 100
- 20170521 100
- 20170520 100
- 20170519 100
- 20170518 100
- 20170517 100
- 20170516 100
- 20170515 100
- 20170514 100
- 20170513 100
- 20170512 100
- 20170511 100
- 20170510 100
- 20170509 100
- 20170508 85 INCREASING POWER AFTER A ROD PATTERN ADJUSTMENT
- 20170507 100
- 20170506 90 INCREASING POWER
- 20170505 95 MSR REHEATER LIMITS
- 20170504 95 MSR REHEATER LIMITS
- 20170503 95 MSR REHEATER LIMITS
- 20170502 95 MSR REHEATER LIMITS
- 20170501 92 INCREASING POWER
- ------------------------
- 20170430 94 HOLD POWER FOR PLANT TESTING
- 20170429 94 HOLD POWER FOR PLANT TESTING
- 20170428 94 HOLD POWER FOR PLANT TESTING
- 20170427 94 HOLD POWER FOR PLANT TESTING
- 20170426 87 INCREASING POWER
- 20170425 71 INCREASING POWER
- 20170424 87 XENON SOAK
- 20170423 95 INCREASING POWER TO 100%
- 20170422 50 INCREASING POWER TO 100%
- 20170421 25 SYNCED TO THE GRID - MISO GENERATION ALERT IN EFFECT UNTIL 2300 HOURS 4/21 (GRID CAPACITY)
- 20170420 16 PREPARING TO SYNC TO THE GRID - MISO GENERATION ALERT IN EFFECT UNTIL 2300 HOURS 4/21 (GRID CAPACITY)
- 20170419 14 HOLDING POWER FOR CONDENSATE VALVE REPAIR
- 20170418 14 HOLDING POWER FOR CONDENSATE VALVE REPAIR
- 20170417 10 HOLDING POWER FOR CONDENSATE VALVE REPAIR
- 20170416 3 INCREASING POWER
- 20170415 1 STARTUP IN PROGRESS - RX CRITICIAL IN THE INTERMEDIATE RANGE
- 20170414 1 STARTUP IN PROGRESS - RX CURRENTLY SUB-CRITICIAL
- 20170413 0 FORCED OUTAGE - REPAIR CONDENSATE LEAK
- 20170412 0 FORCED OUTAGE - REPAIR CONDENSATE LEAK
- 20170411 0 FORCED OUTAGE - REPAIR CONDENSATE LEAK
- 20170410 0 FORCED OUTAGE - REPAIR CONDENSATE LEAK
- 20170409 0 FORCED OUTAGE - REPAIR CONDENSATE LEAK
- 20170408 0 MANUAL RX SCRAM DUE TO CONDENSATE LEAK. SEE EN #52663.
- 20170407 0 MANUAL RX SCRAM DUE TO CONDENSATE LEAK. SEE EN #52663.
- 20170406 0 MANUAL RX SCRAM DUE TO CONDENSATE LEAK. SEE EN #52663.
- 20170405 0 MANUAL RX SCRAM DUE TO CONDENSATE LEAK. SEE EN #52663.
- 20170404 0 MANUAL RX SCRAM DUE TO CONDENSATE LEAK. SEE EN #52663.
- 20170403 100 SEVERE WEATHER WARNING
- 20170402 100
- 20170401 100
- -------------------------
- 20170331 100
- 20170330 100
- 20170329 100
- 20170328 100
- 20170327 100
- 20170326 100
- 20170325 100
- 20170324 100
- 20170323 100
- 20170322 100
- 20170321 100
- 20170320 100
- 20170319 100
- 20170318 100
- 20170317 100
- 20170316 100
- 20170315 100
- 20170314 100
- 20170313 100
- 20170312 100
- 20170311 100
- 20170310 100
- 20170309 76 INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT
- 20170308 93 HOLDING POWER FOR XENON
- 20170307 91 INCREASING POWER TO 100%
- 20170306 76 CONDENSATE BOOSTER PUMP ISSUE
- 20170305 76 CONDENSATE BOOSTER PUMP ISSUE
- 20170304 73 CONDENSATE BOOSTER PUMP ISSUE
- 20170303 75 CONDENSATE BOOSTER PUMP ISSUE
- 20170302 75 CONDENSATE BOOSTER PUMP ISSUE
- 20170301 75 CONDENSATE BOOSTER PUMP ISSUE
- -------------------------
- 20170228 75 CONDENSATE BOOSTER PUMP ISSUE
- 20170227 74 CONDENSATE BOOSTER PUMP ISSUE
- 20170226 76 CONDENSATE BOOSTER PUMP ISSUE
- 20170225 76 CONDENSATE BOOSTER PUMP ISSUE
- 20170224 74 CONDENSATE BOOSTER PUMP ISSUE
- 20170223 100
- 20170222 100
- 20170221 100
- 20170220 100
- 20170219 100
- 20170218 100
- 20170217 100
- 20170216 100
- 20170215 100
- 20170214 96 LOAD LINE ADJUSTMENT
- 20170213 97 INCREASING POWER
- 20170212 74 LOSS OF B CONDENSATE BOOSTER PUMP
- 20170211 76 LOSS OF B CONDENSATE BOOSTER PUMP
- 20170210 100
- 20170209 91 REDUCED POWER FOR ROD PATTERN ADJUSTMENT
- 20170208 96
- 20170207 58 HOLDING POWER - WILL INCREASE LATER TODAY
- 20170206 59 HOLDING POWER - WILL INCREASE LATER TODAY
- 20170205 50 NO DATA FOR THIS DATE
- 20170204 28 NO DATA FOR THIS DATE
- 20170203 28 HOLDING FOR FLOW CONTROL VALVE REPAIRS
- 20170202 19 HOLD TROUBLESHOOTING COMPUTER DATA PROBLEMS
- 20170201 20 INCREASING POWER
- ---------------------
- 20170131 9 PLANT STARTUP IN PROGRESS
- 20170130 1 PLANT STARTUP IN PROGRESS
- 20170129 1 PLANT STARTUP IN PROGRESS
- 20170128 0
- 20170127 0 FORCED OUTAGE
- 20170126 0 FORCED OUTAGE
- 20170125 0 FORCED OUTAGE
- 20170124 0 FORCED OUTAGE
- 20170123 0 FORCED OUTAGE
- 20170122 0 FORCED OUTAGE
- 20170121 0 FORCED OUTAGE
- 20170120 0 FORCED OUTAGE
- 20170119 0 FORCED OUTAGE
- 20170118 0 FORCED OUTAGE
- 20170117 0 FORCED OUTAGE
- 20170116 0 FORCED OUTAGE
- 20170115 0 FORCED OUTAGE
- 20170114 0 FORCED OUTAGE
- 20170113 0 FORCED OUTAGE
- 20170112 0 FORCED OUTAGE
- 20170111 0 FORCED OUTAGE
- 20170110 0 FORCED OUTAGE
- 20170109 0 FORCED OUTAGE
- 20170108 0 FORCED OUTAGE
- 20170107 0 FORCED OUTAGE
- 20170106 0 FORCED OUTAGE
- 20170105 0 FORCED OUTAGE
- 20170104 0 FORCED OUTAGE
- 20170103 0 FORCED OUTAGE
- 20170102 0 FORCED OUTAGE
- 20170101 0 FORCED OUTAGE