ThenThereWereThings

I DID A MATHS

Sep 27th, 2015
180
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 0.91 KB | None | 0 0
  1. 15ft x 25ft
  2. 7.5ft x 15ft
  3. 5ft x 5ft
  4. 30ft x 15ft
  5. 15ft x 20ft
  6. 15ft x 5ft
  7. 30ft x 40ft
  8. 30ft x 50ft
  9. 35ft x 25ft
  10. 70ft x 20ft
  11. 10ft x 50ft
  12. 20ft x 30ft
  13. 55ft x 35ft
  14. 35ft x 15ft
  15. 25ft x 40ft
  16. 100ft x 50ft
  17.  
  18. 375+112.5+25+450+300+75+2700+875+1400+500+600+1925+525+1000+5000
  19.  
  20. 15862.5 sq. ft.
  21.  
  22. 1473.67 square meters
  23.  
  24. +15% to account for wastage and unusual shaped rooms
  25.  
  26. 1694.73 square meters
  27.  
  28. Round up
  29.  
  30. 1700 square meters
  31.  
  32. Double down for rooves and shit, triple for walls
  33.  
  34. 20 square meters costs 30gp (Arms and Equipment Guide, p.40)
  35. 150gp for 100 square meters, 2550 for full floor, 7650 for ceiling and walls as well, plus 850 for furnishings, 600gp for roof bars, 9100gp total
  36.  
  37. 2gp per skilled labourer per day. Assume it takes fifty men one month (four weeks) to build the thing. Cost 100gp per day for 28 days, total of 2800 gold.
  38.  
  39. *FINAL COST*
  40. 11900GP
  41. *TIME TAKEN*
  42. 1 MONTH PLUS TIME TO ACQUIRE MATERIALS
Advertisement
Add Comment
Please, Sign In to add comment