CrimsonSF

Untitled

Jan 10th, 2022
168
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 1.04 KB | None | 0 0
  1. With approval from O5 Command, a single gear was removed from one of the "outer" sections of SCP-914. Placement was carefully documented, and was in a location that would not release tension on any belts or damage any documented sections. Testing area was cleared and sealed after placing a steel block in the "intake" booth. D-00104 was dispatched to SCP-914, and instructed to turn the key and activate SCP-914.
  2.  
  3. D-00104 reported that "the key won't catch", and the key was observed to turn several times without tightening the mainspring. No activity of any kind was observed from SCP-914 during this time.
  4.  
  5. Missing gear was replaced with an identical copy, comprised of the same metal (brass) as the original. Steel block re-inserted into the "intake" booth, and SCP-914 was activated on the "1:1" setting. SCP-914 observed to operate normally, with a slight pause of 3.5 seconds after winding the key. After "refining", Output observed to be a solid steel sphere with the same volume as the original steel block. Original gear returned to SCP-914.
  6.  
  7.  
  8.  
  9.  
Advertisement
Add Comment
Please, Sign In to add comment