Advertisement
Not a member of Pastebin yet?
Sign Up,
it unlocks many cool features!
- - F-2A:
- - added modifications: Sniper (Tier I)
- - removed modifications: J/AAQ-2 (Tier I)
- - modification changes:
- - GBU-38 JDAM:
- - added modification requirement: Sniper
- - removed previous modification (visually, not required): J/AAQ-2
- - GBU-54B:
- - added modification requirement: GBU-31 JDAM
- - removed previous modification (visually, not required): GBU-31 JDAM
- - F-35 (WDNS):
- - minimum repair cost: 1215 / 1219 / 986 -> 1216 / 1214 / 952 SL/minute
- - full stock repair cost: 2902 / 9469 / 8718 -> 3140 / 8662 / 9937 SL
- - full spaded repair cost: 4158 / 13566 / 12491 -> 4498 / 12410 / 14236 SL
- - SL multiplier: 1.21 / 3.42 / 6.0 -> 0.88 / 3.09 / 6.0
- - number of modifications needed to unlock Tier III: 1 -> 2
- - number of modifications needed to unlock Tier IV: 3 -> 2
- - added modifications:
- - AIM-9B (Tier I)
- - Flares/Chaff (Tier I)
- - LAU-3/A (Tier II)
- - LAU-5003 B/A (Tier IV)
- - modification changes:
- - 30 mm belts, Fuselage repair:
- - RP cost: 23000 -> 11000
- - SL cost: 36000 -> 17000
- - GE cost: 550 -> 350
- - Airframe, Compressor:
- - RP cost: 26000 -> 13000
- - SL cost: 41000 -> 20000
- - GE cost: 620 -> 410
- - Cover, EFS, Engine:
- - RP cost: 25000 -> 18000
- - SL cost: 39000 -> 28000
- - GE cost: 590 -> 570
- - G-suit:
- - added previous modification (visually, not required): Flares/Chaff
- - RP cost: 11000 -> 14000
- - SL cost: 17000 -> 22000
- - GE cost: 260 -> 440
- - Mk82:
- - Tier: III -> II
- - RP cost: 11000 -> 13000
- - SL cost: 17000 -> 20000
- - GE cost: 260 -> 410
- - Mk83:
- - added modification requirement: Mk82
- - RP cost: 11000 -> 14000
- - SL cost: 17000 -> 22000
- - GE cost: 260 -> 440
- - New 30 mm cannons/MGs, Wings repair:
- - RP cost: 11000 -> 14000
- - SL cost: 17000 -> 22000
- - GE cost: 260 -> 440
- - Z-10:
- - minimum repair cost: 728 / 1169 / 1172 -> 639 / 1026 / 1028 SL/minute
- - full stock repair cost: 9600 / 4533 / 5690 -> 8427 / 3979 / 4994 SL
- - added modifications: MAW (Tier I)
- - removed modifications: Flares/Chaff (Tier I)
- - modification changes:
- - Compressor: repair cost coefficient: 0.042 -> 0.048
- - Cover: repair cost coefficient: 0.075 -> 0.085
- - EFS(a): repair cost coefficient: 0.079 -> 0.09
- - Engine: repair cost coefficient: 0.086 -> 0.098
- - Helicopter frame: repair cost coefficient: 0.04 -> 0.046
- - New 12.7 mm cannons/MGs, New 23 mm cannons/MGs: repair cost coefficient: 0.016 -> 0.019
- - NVD:
- - previous modification (visually, not required): Flares/Chaff -> MAW
- - repair cost coefficient: 0.079 -> 0.09
- - Replacing helicopter blades: repair cost coefficient: 0.057 -> 0.065
- - Z-10 (2018) ("Z-10A"):
- - minimum repair cost: 728 / 1167 / 1172 -> 639 / 1025 / 1028 SL/minute
- - full stock repair cost: 9600 / 5130 / 5690 -> 8427 / 4503 / 4994 SL
- - added modifications: MAW (Tier I)
- - removed modifications: Flares/Chaff (Tier I)
- - modification changes:
- - Compressor: repair cost coefficient: 0.042 -> 0.048
- - Cover: repair cost coefficient: 0.075 -> 0.085
- - EFS(a): repair cost coefficient: 0.079 -> 0.09
- - Engine: repair cost coefficient: 0.086 -> 0.098
- - Helicopter frame: repair cost coefficient: 0.04 -> 0.046
- - New 12.7 mm cannons/MGs, New 23 mm cannons/MGs: repair cost coefficient: 0.016 -> 0.019
- - NVD:
- - previous modification (visually, not required): Flares/Chaff -> MAW
- - repair cost coefficient: 0.079 -> 0.09
- - Replacing helicopter blades: repair cost coefficient: 0.057 -> 0.065
- - M1097A2 (AN/MPQ-64):
- - minimum repair cost: 1041 / 1176 / 1224 -> 1088 / 1228 / 1278 SL/minute
- - full stock repair cost: 5836 / 7090 / 8030 -> 6095 / 7405 / 8387 SL
- - number of modifications needed to unlock Tier IV: 2 -> 1
- - removed modifications:
- - Elevation Mechanism (Tier III)
- - Horizontal Drive (Tier I)
- - modification changes:
- - Airstrike:
- - repair cost coefficient: 0.03 -> 0.028
- - GE cost: 300 -> 260
- - Artillery Support:
- - repair cost coefficient: 0.04 -> 0.039
- - GE cost: 440 -> 380
- - Brake System, Improved FPE: GE cost: 300 -> 260
- - Crew Replenishment:
- - RP cost: 26000 -> 39000
- - SL cost: 40000 -> 60000
- - GE cost: 440 -> 570
- - Engine:
- - repair cost coefficient: 0.052 -> 0.05
- - GE cost: 440 -> 380
- - Filters:
- - repair cost coefficient: 0.034 -> 0.032
- - RP cost: 26000 -> 39000
- - SL cost: 40000 -> 60000
- - GE cost: 440 -> 570
- - Improved optics:
- - repair cost coefficient: 0.03 -> 0.028
- - GE cost: 440 -> 380
- - Improved Parts:
- - RP cost: 6300 -> 9300
- - SL cost: 32000 -> 47000
- - GE cost: 360 -> 450
- - Suspension:
- - repair cost coefficient: 0.02 -> 0.019
- - GE cost: 300 -> 260
- - Tires:
- - RP cost: 21000 -> 31000
- - SL cost: 32000 -> 47000
- - GE cost: 360 -> 450
- - Transmission:
- - repair cost coefficient: 0.046 -> 0.044
- - GE cost: 440 -> 380
- - M1097A2 (SLAMRAAM):
- - minimum repair cost: 1041 / 1176 / 1224 -> 1074 / 1212 / 1262 SL/minute
- - full stock repair cost: 5836 / 7090 / 8030 -> 6017 / 7309 / 8279 SL
- - number of modifications needed to unlock Tier IV: 2 -> 1
- - removed modifications: Elevation Mechanism (Tier III)
- - modification changes:
- - Airstrike:
- - repair cost coefficient: 0.03 -> 0.029
- - GE cost: 300 -> 280
- - Artillery Support:
- - repair cost coefficient: 0.04 -> 0.039
- - GE cost: 440 -> 410
- - Brake System, Improved FPE, Suspension: GE cost: 300 -> 280
- - Crew Replenishment:
- - RP cost: 26000 -> 39000
- - SL cost: 40000 -> 60000
- - GE cost: 440 -> 610
- - Engine:
- - repair cost coefficient: 0.052 -> 0.051
- - GE cost: 440 -> 410
- - Filters:
- - repair cost coefficient: 0.034 -> 0.033
- - RP cost: 26000 -> 39000
- - SL cost: 40000 -> 60000
- - GE cost: 440 -> 610
- - Horizontal Drive, Improved Parts, Tires: GE cost: 360 -> 330
- - Improved optics:
- - repair cost coefficient: 0.03 -> 0.029
- - GE cost: 440 -> 410
- - Transmission:
- - repair cost coefficient: 0.046 -> 0.044
- - GE cost: 440 -> 410
- - Alaska (CB-1):
- - 400000 -> 380000 RP
- - 1080000 -> 990000 SL
- - crew cost: 310000 -> 280000 SL
- - expert crew cost: 1080000 -> 990000 SL
- - ace crew cost: 950000 / 2400 -> 830000 RP / 2000 GE
- - RP multiplier: 2.2 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 25000 -> 24000
- - SL cost: 39000 -> 37000
- - GE cost: 630 -> 570
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 18 Mod. 1 APCBC, Mk. 32 Mod. 1 Com.:
- - SL cost: 19000 -> 18000
- - GE cost: 300 -> 290
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement:
- - RP cost: 17000 -> 16000
- - SL cost: 27000 -> 25000
- - GE cost: 430 -> 380
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 13000 -> 12000
- - SL cost: 20000 -> 18000
- - GE cost: 330 -> 290
- - talisman: 2600 -> 2300 GE
- - Allen M. Sumner (DD-692):
- - 7900 -> 18000 RP
- - 10000 -> 47000 SL
- - crew cost: 3000 -> 13000 SL
- - expert crew cost: 10000 -> 47000 SL
- - ace crew cost: 160000 / 125 -> 280000 RP / 400 GE
- - minimum repair cost: 116 / 114 -> 279 / 280 SL/minute
- - full stock repair cost: 883 / 1353 -> 2122 / 3315 SL
- - full spaded repair cost: 1148 / 1760 -> 2760 / 4311 SL
- - SL multiplier: 0.8 / 1.95 / 1.0 -> 1.89 / 4.62 / 1.0
- - RP multiplier: 1.12 -> 1.36
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 450 -> 1300
- - SL cost: 440 -> 2100
- - GE cost: 130 -> 220
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.:
- - RP cost: 280 -> 790
- - SL cost: 270 -> 1300
- - GE cost: 80 -> 130
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement, Smokescreen:
- - RP cost: 260 -> 740
- - SL cost: 250 -> 1200
- - GE cost: 75 -> 125
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 290 -> 830
- - SL cost: 280 -> 1400
- - GE cost: 85 -> 140
- - talisman: 530 -> 980 GE
- - backup: 25 -> 30 GE
- - Arizona (BB-39):
- - 390000 -> 380000 RP
- - 1050000 -> 990000 SL
- - crew cost: 300000 -> 280000 SL
- - expert crew cost: 1050000 -> 990000 SL
- - ace crew cost: 890000 / 2200 -> 830000 RP / 2000 GE
- - RP multiplier: 2.14 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps: GE cost: 530 -> 510
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking, Mk. 8 Mod. 3 APCBC: SL cost: 19000 -> 18000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement: GE cost: 480 -> 470
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 330 -> 320
- - talisman: 2400 -> 2300 GE
- - Brooklyn (CL-40):
- - 88000 -> 45000 RP
- - 490000 -> 300000 SL
- - crew cost: 140000 -> 87000 SL
- - expert crew cost: 490000 -> 300000 SL
- - ace crew cost: 670000 / 1500 -> 520000 RP / 1100 GE
- - minimum repair cost: 917 / 681 -> 797 / 561 SL/minute
- - full stock repair cost: 12722 / 12691 -> 11058 / 10457 SL
- - full spaded repair cost: 17169 / 17127 -> 14924 / 14112 SL
- - RP multiplier: 1.9 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 11000 -> 5100
- - SL cost: 18000 -> 8800
- - GE cost: 390 -> 330
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 35 Mod. 1 APCBC:
- - RP cost: 8700 -> 3900
- - SL cost: 14000 -> 6700
- - GE cost: 310 -> 250
- - Auxiliary Armament Targeting, Fire Division, Mk. 34 Mod. 1 HE-BF, Rudder Replacement, Smokescreen:
- - RP cost: 7800 -> 3500
- - SL cost: 12000 -> 6000
- - GE cost: 280 -> 230
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 3300
- - SL cost: 11000 -> 5700
- - GE cost: 260 -> 210
- - talisman: 2000 -> 1700 GE
- - backup: 50 -> 40 GE
- - Cleveland (CL-55):
- - 125000 -> 61000 RP
- - 360000 -> 230000 SL
- - crew cost: 105000 -> 65000 SL
- - expert crew cost: 360000 -> 230000 SL
- - ace crew cost: 620000 / 1400 -> 440000 RP / 820 GE
- - minimum repair cost: 877 / 641 -> 569 / 430 SL/minute
- - full stock repair cost: 12168 / 11946 -> 7895 / 8014 SL
- - full spaded repair cost: 16421 / 16122 -> 10655 / 10816 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 3.89 / 6.0 / 1.0
- - RP multiplier: 1.84 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 8600 -> 3600
- - SL cost: 14000 -> 7000
- - GE cost: 400 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 35 Mod. 1 APCBC:
- - RP cost: 6600 -> 2800
- - SL cost: 11000 -> 5400
- - GE cost: 310 -> 230
- - Auxiliary Armament Targeting, Fire Division, Mk. 34 Mod. 1 HE-BF, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 2100
- - SL cost: 7800 -> 4100
- - GE cost: 230 -> 170
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 2300
- - SL cost: 8800 -> 4400
- - GE cost: 250 -> 190
- - talisman: 1900 -> 1400 GE
- - backup: 50 -> 40 GE
- - Colorado (BB-45):
- - 400000 -> 390000 RP
- - 1080000 -> 1050000 SL
- - crew cost: 310000 -> 300000 SL
- - expert crew cost: 1080000 -> 1050000 SL
- - ace crew cost: 950000 / 2400 -> 890000 RP / 2200 GE
- - RP multiplier: 2.2 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 25000 -> 24000
- - SL cost: 39000 -> 37000
- - GE cost: 600 -> 560
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking, Mk. 3 APCBC: GE cost: 290 -> 280
- - Auxiliary Armament Targeting, Fire Division, Mk. 5 Mod. 1 APCBC, Rudder Replacement:
- - SL cost: 27000 -> 26000
- - GE cost: 410 -> 390
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 360 -> 350
- - talisman: 2600 -> 2400 GE
- - Fargo (CL-106):
- - 125000 -> 75000 RP
- - 360000 -> 250000 SL
- - crew cost: 105000 -> 72000 SL
- - expert crew cost: 360000 -> 250000 SL
- - ace crew cost: 620000 / 1400 -> 480000 RP / 940 GE
- - minimum repair cost: 877 / 641 -> 699 / 505 SL/minute
- - full stock repair cost: 12168 / 11946 -> 9697 / 9411 SL
- - full spaded repair cost: 16421 / 16122 -> 13086 / 12700 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.24 / 6.0 / 1.0
- - RP multiplier: 1.84 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 8600 -> 4300
- - SL cost: 14000 -> 8300
- - GE cost: 400 -> 320
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 35 Mod. 1 APCBC:
- - RP cost: 6600 -> 3300
- - SL cost: 11000 -> 6400
- - GE cost: 310 -> 240
- - Auxiliary Armament Targeting, Fire Division, Mk. 34 Mod. 1 HE-BF, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 2500
- - SL cost: 7800 -> 4900
- - GE cost: 230 -> 185
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 5500 -> 2800
- - SL cost: 8800 -> 5400
- - GE cost: 250 -> 210
- - talisman: 1900 -> 1500 GE
- - backup: 50 -> 40 GE
- - Gearing (DD-710):
- - 11000 -> 26000 RP
- - 22000 -> 76000 SL
- - crew cost: 6300 -> 22000 SL
- - expert crew cost: 22000 -> 76000 SL
- - ace crew cost: 220000 / 250 -> 320000 RP / 500 GE
- - minimum repair cost: 202 / 206 -> 316 / 323 SL/minute
- - full stock repair cost: 1539 / 2441 -> 2405 / 3819 SL
- - full spaded repair cost: 2002 / 3174 -> 3128 / 4967 SL
- - SL multiplier: 1.36 / 3.34 / 1.0 -> 2.14 / 5.23 / 1.0
- - RP multiplier: 1.24 -> 1.42
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 680 -> 1700
- - SL cost: 900 -> 3200
- - GE cost: 175 -> 230
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HEFI-T / HEFI-T / HEFI-T / AP-T, Mk. 32 Mod. 1 Com.:
- - RP cost: 420 -> 1100
- - SL cost: 560 -> 2100
- - GE cost: 105 -> 150
- - AP-T / AP-T / AP-T / HEFI-T, Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement, Smokescreen:
- - RP cost: 390 -> 1000
- - SL cost: 520 -> 1900
- - GE cost: 100 -> 135
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 430 -> 1100
- - SL cost: 570 -> 2100
- - GE cost: 110 -> 150
- - talisman: 750 -> 1100 GE
- - backup: 25 -> 30 GE
- - Mitscher (DL-2):
- - 14000 -> 9200 RP
- - 32000 -> 16000 SL
- - crew cost: 9200 -> 4500 SL
- - expert crew cost: 32000 -> 16000 SL
- - ace crew cost: 250000 / 320 -> 190000 RP / 180 GE
- - minimum repair cost: 248 / 245 -> 160 / 159 SL/minute
- - full stock repair cost: 1891 / 2896 -> 1217 / 1877 SL
- - full spaded repair cost: 2453 / 3756 -> 1578 / 2434 SL
- - SL multiplier: 1.63 / 3.99 / 1.0 -> 1.04 / 2.54 / 1.0
- - RP multiplier: 1.3 -> 1.18
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 1500 -> 910
- - SL cost: 2200 -> 1000
- - GE cost: 280 -> 220
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 42 Sp. Com.:
- - RP cost: 690 -> 420
- - SL cost: 1000 -> 470
- - GE cost: 130 -> 100
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Mk. 41 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 520 -> 320
- - SL cost: 750 -> 360
- - GE cost: 95 -> 75
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Rocket Launcher, Shrapnel Protection, Ventilation:
- - RP cost: 580 -> 350
- - SL cost: 840 -> 400
- - GE cost: 110 -> 85
- - talisman: 860 -> 640 GE
- - New Orleans (CA-32):
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 823 / 585 -> 702 / 489 SL/minute
- - full stock repair cost: 11420 / 11318 -> 9750 / 9462 SL
- - full spaded repair cost: 15412 / 15274 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, Mk. 17 Mod. 1 Sp. Com., New Pumps:
- - RP cost: 6000 -> 4300
- - SL cost: 10000 -> 8300
- - GE cost: 350 -> 300
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 19 Mod. 1 APCBC:
- - RP cost: 4700 -> 3300
- - SL cost: 7800 -> 6400
- - GE cost: 270 -> 230
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Rudder Replacement, Smokescreen:
- - RP cost: 4200 -> 3000
- - SL cost: 7000 -> 5800
- - GE cost: 240 -> 210
- - Improved Rangefinder, Mk. 28 Mod. 9 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5400
- - GE cost: 230 -> 195
- - talisman: 1800 -> 1500 GE
- - North Dakota (BB-29):
- - 230000 -> 125000 RP
- - 640000 -> 360000 SL
- - crew cost: 185000 -> 105000 SL
- - expert crew cost: 640000 -> 360000 SL
- - ace crew cost: 720000 / 1700 -> 620000 RP / 1400 GE
- - minimum repair cost: 993 / 992 -> 950 / 949 SL/minute
- - full stock repair cost: 22774 / 28736 -> 21787 / 27490 SL
- - full spaded repair cost: 28574 / 36055 -> 27336 / 34492 SL
- - RP multiplier: 1.96 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 14000
- - SL cost: 37000 -> 22000
- - GE cost: 580 -> 490
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking, Mk. 7 APCBC:
- - RP cost: 8700 -> 5300
- - SL cost: 13000 -> 8500
- - GE cost: 210 -> 185
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 16000 -> 9900
- - SL cost: 25000 -> 16000
- - GE cost: 390 -> 350
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 11000 -> 6600
- - SL cost: 17000 -> 11000
- - GE cost: 270 -> 230
- - talisman: 2100 -> 1900 GE
- - Pensacola (CA-24), London (69): 89000 -> 45000 RP
- - Pittsburgh (CA-72):
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 955 / 709 -> 913 / 667 SL/minute
- - full stock repair cost: 13238 / 13205 -> 12660 / 12430 SL
- - full spaded repair cost: 17169 / 17127 -> 16421 / 16122 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mk. 17 Mod. 1 Sp. Com., New Pumps:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 18000
- - GE cost: 500 -> 480
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 21 Mod. 2 APCBC:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 310 -> 290
- - Auxiliary Armament Targeting, Fire Division, Mk. 25 Mod. 1 HE, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement, Smokescreen:
- - RP cost: 6500 -> 4900
- - SL cost: 10000 -> 7800
- - GE cost: 230 -> 220
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5500
- - SL cost: 11000 -> 8800
- - GE cost: 260 -> 240
- - talisman: 2000 -> 1900 GE
- - Portland (CA-33): 75000 -> 37000 RP
- - Raleigh (CL-7):
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 440 / 327 -> 309 / 288 SL/minute
- - full stock repair cost: 5842 / 6858 -> 4107 / 6044 SL
- - full spaded repair cost: 7905 / 9281 -> 5558 / 8179 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3000 -> 1700
- - SL cost: 6400 -> 3200
- - GE cost: 260 -> 210
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 27 Mod. 1 Sp. Com., Mk. 29 Mod. 1 APCBC:
- - RP cost: 1800 -> 1100
- - SL cost: 3900 -> 2100
- - GE cost: 160 -> 135
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 2000 -> 1200
- - SL cost: 4300 -> 2200
- - GE cost: 175 -> 150
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1300
- - SL cost: 4900 -> 2400
- - GE cost: 200 -> 160
- - talisman: 1300 -> 1100 GE
- - Roanoke (CL-145):
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 955 / 709 -> 913 / 667 SL/minute
- - full stock repair cost: 13238 / 13205 -> 12660 / 12430 SL
- - full spaded repair cost: 17169 / 17127 -> 16421 / 16122 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Mk. 34 Mod. 1 HE-VTF, New Pumps:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 18000
- - GE cost: 470 -> 460
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. 35 Mod. 1 APCBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 290 -> 280
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Mk. 34 Mod. 1 HE-BF, Rudder Replacement, Smokescreen:
- - RP cost: 6500 -> 4900
- - SL cost: 10000 -> 7800
- - GE cost: 220 -> 210
- - talisman: 2000 -> 1900 GE
- - Somers (DD-381):
- - 36000 -> 26000 RP
- - 115000 -> 76000 SL
- - crew cost: 33000 -> 22000 SL
- - expert crew cost: 115000 -> 76000 SL
- - ace crew cost: 360000 / 590 -> 320000 RP / 500 GE
- - minimum repair cost: 375 / 369 -> 320 / 327 SL/minute
- - full stock repair cost: 2853 / 4379 -> 2439 / 3884 SL
- - full spaded repair cost: 3648 / 5600 -> 3119 / 4967 SL
- - SL multiplier: 2.37 / 6.0 / 1.0 -> 2.12 / 5.39 / 1.0
- - RP multiplier: 1.48 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2900 -> 2200
- - SL cost: 6300 -> 4100
- - GE cost: 270 -> 250
- - Auxiliary Armament Targeting, Fire Division, Mk. 46 Mod. 1 Sp. Com., Rudder Replacement, Smokescreen:
- - RP cost: 1600 -> 1200
- - SL cost: 3500 -> 2200
- - GE cost: 150 -> 135
- - Damage Control Division, Dry-Docking, Mk. 32 Mod. 1 Com.:
- - RP cost: 2400 -> 1800
- - SL cost: 5200 -> 3400
- - GE cost: 220 -> 200
- - Improved Rangefinder, Mk. 31 Mod. 1 HE-VTF, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1500 -> 1100
- - SL cost: 3300 -> 2100
- - GE cost: 140 -> 125
- - talisman: 1200 -> 1100 GE
- - Texas (BB-35):
- - 380000 -> 175000 RP
- - 990000 -> 490000 SL
- - crew cost: 280000 -> 140000 SL
- - expert crew cost: 990000 -> 490000 SL
- - ace crew cost: 830000 / 2000 -> 670000 RP / 1500 GE
- - full stock repair cost: 26310 / 32365 -> 25114 / 30894 SL
- - full spaded repair cost: 33012 / 40609 -> 31511 / 38763 SL
- - RP multiplier: 2.08 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 32000 -> 19000
- - SL cost: 49000 -> 30000
- - GE cost: 640 -> 540
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking, Mk. 8 Mod. 3 APCBC:
- - RP cost: 12000 -> 6900
- - SL cost: 18000 -> 11000
- - GE cost: 240 -> 195
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 13000
- - SL cost: 34000 -> 21000
- - GE cost: 440 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 8700
- - SL cost: 23000 -> 14000
- - GE cost: 300 -> 250
- - talisman: 2300 -> 2000 GE
- - backup: 55 -> 50 GE
- - Trenton (CL-11):
- - 26000 -> 18000 RP
- - 76000 -> 47000 SL
- - crew cost: 22000 -> 13000 SL
- - expert crew cost: 76000 -> 47000 SL
- - ace crew cost: 320000 / 500 -> 280000 RP / 400 GE
- - minimum repair cost: 309 / 288 -> 267 / 271 SL/minute
- - full stock repair cost: 4107 / 6044 -> 3549 / 5677 SL
- - full spaded repair cost: 5558 / 8179 -> 4803 / 7682 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 2.58 / 5.55 / 1.0
- - RP multiplier: 1.42 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1300
- - SL cost: 3200 -> 2100
- - GE cost: 210 -> 200
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. 27 Mod. 1 Sp. Com., Mk. 29 Mod. 1 APCBC:
- - RP cost: 1100 -> 790
- - SL cost: 2100 -> 1300
- - GE cost: 135 -> 120
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 1200 -> 890
- - SL cost: 2200 -> 1500
- - GE cost: 150 -> 135
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 990
- - SL cost: 2400 -> 1600
- - GE cost: 160 -> 150
- - talisman: 1100 -> 980 GE
- - Wyoming (BB-32):
- - 290000 -> 175000 RP
- - 790000 -> 490000 SL
- - crew cost: 230000 -> 140000 SL
- - expert crew cost: 790000 -> 490000 SL
- - ace crew cost: 780000 / 1800 -> 670000 RP / 1500 GE
- - RP multiplier: 2.02 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 31000 -> 19000
- - SL cost: 46000 -> 30000
- - GE cost: 600 -> 540
- - Anti-Air Armament Targeting, APC, Damage Control Division, Dry-Docking, Mk. 15 Mod. 1 APC:
- - RP cost: 11000 -> 6900
- - SL cost: 16000 -> 11000
- - GE cost: 210 -> 195
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 21000 -> 13000
- - SL cost: 31000 -> 21000
- - GE cost: 410 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 14000 -> 8700
- - SL cost: 21000 -> 14000
- - GE cost: 270 -> 250
- - talisman: 2200 -> 2000 GE
- - Admiral Graf Spee:
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 820 / 584 -> 700 / 488 SL/minute
- - full stock repair cost: 11390 / 11287 -> 9723 / 9436 SL
- - full spaded repair cost: 15412 / 15274 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 6000 -> 4300
- - SL cost: 10000 -> 8300
- - GE cost: 370 -> 320
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.7 APCBC, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 5200
- - GE cost: 230 -> 200
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.2 Bd.Z. SAPBC:
- - RP cost: 4200 -> 3000
- - SL cost: 7000 -> 5800
- - GE cost: 260 -> 220
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5400
- - GE cost: 240 -> 210
- - talisman: 1800 -> 1500 GE
- - Admiral Hipper:
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 820 / 584 -> 700 / 488 SL/minute
- - full stock repair cost: 11390 / 11287 -> 9723 / 9436 SL
- - full spaded repair cost: 15412 / 15274 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 6000 -> 4300
- - SL cost: 10000 -> 8300
- - GE cost: 370 -> 320
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L/4.4 (m.Hb.) APCBC, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 5200
- - GE cost: 230 -> 200
- - Auxiliary Armament Targeting, Fire Division, Pz.Gr. L/4.2 APHE, Rudder Replacement, Smokescreen, Spr.Gr. L/4.7 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4900
- - GE cost: 210 -> 185
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 4700 -> 3300
- - SL cost: 7800 -> 6400
- - GE cost: 290 -> 240
- - talisman: 1800 -> 1500 GE
- - Derfflinger:
- - 290000 -> 175000 RP
- - 790000 -> 490000 SL
- - crew cost: 230000 -> 140000 SL
- - expert crew cost: 790000 -> 490000 SL
- - ace crew cost: 780000 / 1800 -> 670000 RP / 1500 GE
- - RP multiplier: 2.02 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 23000 -> 14000
- - SL cost: 34000 -> 22000
- - GE cost: 530 -> 470
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 14000 -> 8700
- - SL cost: 21000 -> 14000
- - GE cost: 320 -> 290
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 13000 -> 7800
- - SL cost: 19000 -> 12000
- - GE cost: 300 -> 260
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 7200
- - SL cost: 18000 -> 11000
- - GE cost: 280 -> 240
- - talisman: 2200 -> 2000 GE
- - Elbing:
- - 26000 -> 18000 RP
- - 76000 -> 47000 SL
- - crew cost: 22000 -> 13000 SL
- - expert crew cost: 76000 -> 47000 SL
- - ace crew cost: 320000 / 500 -> 280000 RP / 400 GE
- - minimum repair cost: 331 / 252 -> 286 / 265 SL/minute
- - full stock repair cost: 4310 / 5472 -> 3720 / 5746 SL
- - full spaded repair cost: 5497 / 6979 -> 4745 / 7329 SL
- - SL multiplier: 3.07 / 6.0 / 1.0 -> 2.71 / 6.0 / 1.0
- - RP multiplier: 1.42 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 2900 -> 2100
- - SL cost: 5400 -> 3400
- - GE cost: 290 -> 260
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 1200 -> 890
- - SL cost: 2200 -> 1500
- - GE cost: 120 -> 110
- - Damage Control Division, Dry-Docking:
- - RP cost: 2700 -> 2000
- - SL cost: 5100 -> 3300
- - GE cost: 270 -> 240
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 830
- - SL cost: 2100 -> 1400
- - GE cost: 110 -> 100
- - talisman: 1100 -> 980 GE
- - Emden:
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 457 / 341 -> 321 / 300 SL/minute
- - full stock repair cost: 6079 / 7137 -> 4274 / 6289 SL
- - full spaded repair cost: 7905 / 9281 -> 5558 / 8179 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 3700 -> 2200
- - SL cost: 7900 -> 4100
- - GE cost: 340 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC, Spr.Gr. L/4.4 Bd.Z. HE-BF:
- - RP cost: 1800 -> 1100
- - SL cost: 3900 -> 2100
- - GE cost: 165 -> 145
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 1700 -> 1000
- - SL cost: 3600 -> 1900
- - GE cost: 155 -> 130
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 1900 -> 1100
- - SL cost: 4100 -> 2100
- - GE cost: 175 -> 145
- - talisman: 1300 -> 1100 GE
- - Helgoland:
- - 230000 -> 175000 RP
- - 640000 -> 490000 SL
- - crew cost: 185000 -> 140000 SL
- - expert crew cost: 640000 -> 490000 SL
- - ace crew cost: 720000 / 1700 -> 670000 RP / 1500 GE
- - RP multiplier: 1.96 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 19000
- - SL cost: 37000 -> 30000
- - GE cost: 610 -> 580
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 9800 -> 7800
- - SL cost: 15000 -> 12000
- - GE cost: 250 -> 240
- - Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 15000 -> 12000
- - SL cost: 23000 -> 19000
- - GE cost: 380 -> 360
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 9100 -> 7200
- - SL cost: 14000 -> 11000
- - GE cost: 230 -> 220
- - talisman: 2100 -> 2000 GE
- - Kaiser:
- - 290000 -> 230000 RP
- - 790000 -> 640000 SL
- - crew cost: 230000 -> 185000 SL
- - expert crew cost: 790000 -> 640000 SL
- - ace crew cost: 780000 / 1800 -> 720000 RP / 1700 GE
- - RP multiplier: 2.02 -> 1.96
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 31000 -> 24000
- - SL cost: 46000 -> 37000
- - GE cost: 640 -> 610
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC, Spr.Gr. L/3.8 Bd.Z. APC:
- - RP cost: 13000 -> 9800
- - SL cost: 19000 -> 15000
- - GE cost: 270 -> 250
- - Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.3 Bd.Z. (m.Hb.) SAP:
- - RP cost: 19000 -> 15000
- - SL cost: 28000 -> 23000
- - GE cost: 390 -> 380
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 9100
- - SL cost: 18000 -> 14000
- - GE cost: 250 -> 230
- - talisman: 2200 -> 2100 GE
- - Köln:
- - 75000 -> 61000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 65000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 440000 RP / 820 GE
- - minimum repair cost: 729 / 508 -> 594 / 430 SL/minute
- - full stock repair cost: 10118 / 9819 -> 8251 / 8318 SL
- - full spaded repair cost: 13157 / 12769 -> 10730 / 10817 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 3.94 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 5400 -> 4500
- - SL cost: 10000 -> 8700
- - GE cost: 380 -> 350
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 3300 -> 2800
- - SL cost: 6400 -> 5400
- - GE cost: 230 -> 220
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 2500 -> 2100
- - SL cost: 4900 -> 4100
- - GE cost: 175 -> 165
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 2300
- - SL cost: 5400 -> 4400
- - GE cost: 195 -> 180
- - talisman: 1500 -> 1400 GE
- - Nürnberg:
- - 89000 -> 37000 RP
- - 300000 -> 250000 SL
- - crew cost: 87000 -> 72000 SL
- - expert crew cost: 300000 -> 250000 SL
- - ace crew cost: 520000 / 1100 -> 480000 RP / 940 GE
- - minimum repair cost: 812 / 566 -> 729 / 508 SL/minute
- - full stock repair cost: 11276 / 10943 -> 10118 / 9819 SL
- - full spaded repair cost: 14663 / 14231 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 6400 -> 5400
- - SL cost: 11000 -> 10000
- - GE cost: 410 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 3900 -> 3300
- - SL cost: 6700 -> 6400
- - GE cost: 250 -> 230
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 2900 -> 2500
- - SL cost: 5000 -> 4900
- - GE cost: 190 -> 175
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2800
- - SL cost: 5700 -> 5400
- - GE cost: 210 -> 195
- - talisman: 1700 -> 1500 GE
- - Von der Tann:
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 993 / 992 -> 950 / 949 SL/minute
- - full stock repair cost: 22774 / 28736 -> 21787 / 27490 SL
- - full spaded repair cost: 28574 / 36055 -> 27336 / 34492 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 14000
- - SL cost: 30000 -> 22000
- - GE cost: 580 -> 520
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Spr.Gr. L/3.2 APC:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 260 -> 250
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Spr.Gr. L/3.2 Bd.Z. SAPBC:
- - RP cost: 9700 -> 7400
- - SL cost: 15000 -> 12000
- - GE cost: 290 -> 280
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Pz.Gr. L/3.7 (m.Hb.) APCBC, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5500
- - SL cost: 11000 -> 8800
- - GE cost: 220 -> 210
- - talisman: 2000 -> 1900 GE
- - Z 20 (1941) ("Z 22"):
- - 9200 -> 7900 RP
- - 16000 -> 10000 SL
- - crew cost: 4500 -> 3000 SL
- - expert crew cost: 16000 -> 10000 SL
- - ace crew cost: 190000 / 180 -> 160000 RP / 125 GE
- - minimum repair cost: 158 / 159 -> 115 SL/minute
- - full stock repair cost: 1196 / 1873 -> 871 / 1355 SL
- - full spaded repair cost: 1555 / 2435 -> 1133 / 1762 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 0.81 / 1.86 / 1.0
- - RP multiplier: 1.18 -> 1.12
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 680 -> 560
- - SL cost: 770 -> 550
- - GE cost: 165 -> 140
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl. APCBC, Spr.Gr. L/4.5 Bd.Z. HE-BF:
- - RP cost: 340 -> 280
- - SL cost: 380 -> 270
- - GE cost: 80 -> 70
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 380 -> 310
- - SL cost: 430 -> 300
- - GE cost: 90 -> 80
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 350
- - SL cost: 470 -> 340
- - GE cost: 100 -> 90
- - talisman: 640 -> 530 GE
- - Z 33:
- - 14000 -> 9200 RP
- - 32000 -> 16000 SL
- - crew cost: 9200 -> 4500 SL
- - expert crew cost: 32000 -> 16000 SL
- - ace crew cost: 250000 / 320 -> 190000 RP / 180 GE
- - minimum repair cost: 248 / 244 -> 159 / 158 SL/minute
- - full stock repair cost: 1886 / 2888 -> 1214 / 1872 SL
- - full spaded repair cost: 2453 / 3756 -> 1578 / 2434 SL
- - SL multiplier: 1.63 / 3.99 / 1.0 -> 1.04 / 2.54 / 1.0
- - RP multiplier: 1.3 -> 1.18
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 1100 -> 680
- - SL cost: 1600 -> 770
- - GE cost: 200 -> 165
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl. APCBC, Spr.Gr. L/4.4 Bd.Z. (m.Hb.) SAPBC:
- - RP cost: 550 -> 340
- - SL cost: 790 -> 380
- - GE cost: 100 -> 80
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.5 Zt.Z. HE-TF:
- - RP cost: 620 -> 380
- - SL cost: 890 -> 430
- - GE cost: 115 -> 90
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 690 -> 420
- - SL cost: 1000 -> 470
- - GE cost: 130 -> 100
- - talisman: 860 -> 640 GE
- - Z 35 ("Z 43"):
- - 11000 -> 9200 RP
- - 22000 -> 16000 SL
- - crew cost: 6300 -> 4500 SL
- - expert crew cost: 22000 -> 16000 SL
- - ace crew cost: 220000 / 250 -> 190000 RP / 180 GE
- - minimum repair cost: 202 / 206 -> 159 / 158 SL/minute
- - full stock repair cost: 1539 / 2441 -> 1214 / 1872 SL
- - full spaded repair cost: 2002 / 3174 -> 1578 / 2434 SL
- - SL multiplier: 1.36 / 3.34 / 1.0 -> 1.04 / 2.54 / 1.0
- - RP multiplier: 1.24 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 680 -> 550
- - SL cost: 900 -> 620
- - GE cost: 160 -> 140
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Pz.Gr. L'spur Zerl. APCBC, Spr.Gr. L/4.5 Bd.Z. HE-BF:
- - RP cost: 420 -> 340
- - SL cost: 560 -> 380
- - GE cost: 95 -> 85
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 470 -> 380
- - SL cost: 620 -> 430
- - GE cost: 110 -> 95
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 420
- - SL cost: 690 -> 470
- - GE cost: 120 -> 105
- - talisman: 750 -> 640 GE
- - Arkhangelsk:
- - 400000 -> 390000 RP
- - 1080000 -> 1050000 SL
- - crew cost: 310000 -> 300000 SL
- - expert crew cost: 1080000 -> 1050000 SL
- - ace crew cost: 950000 / 2400 -> 890000 RP / 2200 GE
- - RP multiplier: 2.2 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 33000 -> 32000
- - SL cost: 52000 -> 50000
- - GE cost: 740 -> 700
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. XIIa APCBC, SAP: GE cost: 270 -> 260
- - Auxiliary Armament Targeting, Fire Division, Mk. XVIIb APCBC, Rudder Replacement:
- - SL cost: 27000 -> 26000
- - GE cost: 380 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 340 -> 330
- - talisman: 2600 -> 2400 GE
- - Chapayev:
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 871 / 626 -> 727 / 526 SL/minute
- - full stock repair cost: 12083 / 11655 -> 10089 / 9792 SL
- - full spaded repair cost: 15672 / 15117 -> 13086 / 12700 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.24 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, ZS-55R HE-VTF:
- - RP cost: 7600 -> 5400
- - SL cost: 13000 -> 10000
- - GE cost: 470 -> 400
- - Anti-Air Armament Targeting, B-35 APCBC, Damage Control Division, Dry-Docking, ZS-55 HE-TF:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 5200
- - GE cost: 230 -> 200
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4900
- - GE cost: 210 -> 185
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35 HE-TF:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5400
- - GE cost: 240 -> 210
- - talisman: 1800 -> 1500 GE
- - Imperatritsa Mariya:
- - 290000 -> 125000 RP
- - 790000 -> 360000 SL
- - crew cost: 230000 -> 105000 SL
- - expert crew cost: 790000 -> 360000 SL
- - ace crew cost: 780000 / 1800 -> 620000 RP / 1400 GE
- - minimum repair cost: 1056 / 1039 -> 1003 / 996 SL/minute
- - full stock repair cost: 25051 / 30816 -> 23791 / 29544 SL
- - full spaded repair cost: 31511 / 38763 -> 29926 / 37162 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.44 / 6.0 / 1.0
- - RP multiplier: 2.02 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 23000 -> 11000
- - SL cost: 34000 -> 18000
- - GE cost: 500 -> 440
- - Anti-Air Armament Targeting, B-17 APCBC, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAPBC:
- - RP cost: 11000 -> 5300
- - SL cost: 16000 -> 8500
- - GE cost: 240 -> 210
- - Auxiliary Armament Targeting, Fire Division, PB-17 SAPCBC, Rudder Replacement:
- - RP cost: 16000 -> 7400
- - SL cost: 24000 -> 12000
- - GE cost: 350 -> 290
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 14000 -> 6600
- - SL cost: 21000 -> 11000
- - GE cost: 310 -> 260
- - talisman: 2200 -> 1900 GE
- - Izmail:
- - 380000 -> 175000 RP
- - 990000 -> 490000 SL
- - crew cost: 280000 -> 140000 SL
- - expert crew cost: 990000 -> 490000 SL
- - ace crew cost: 830000 / 2000 -> 670000 RP / 1500 GE
- - minimum repair cost: 1081 / 1053 -> 1068 / 1053 SL/minute
- - full stock repair cost: 27424 / 33250 -> 25879 / 31739 SL
- - full spaded repair cost: 34496 / 41824 -> 32552 / 39923 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.43 / 6.0 / 1.0
- - RP multiplier: 2.08 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 24000 -> 14000
- - SL cost: 37000 -> 22000
- - GE cost: 510 -> 420
- - Anti-Air Armament Targeting, BP obr. 1911 g. APCBC, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAPBC:
- - RP cost: 12000 -> 6900
- - SL cost: 18000 -> 11000
- - GE cost: 260 -> 210
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 22000 -> 13000
- - SL cost: 34000 -> 21000
- - GE cost: 470 -> 390
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 15000 -> 8700
- - SL cost: 23000 -> 14000
- - GE cost: 320 -> 260
- - talisman: 2300 -> 2000 GE
- - backup: 55 -> 50 GE
- - Kirov:
- - 75000 -> 61000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 65000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 440000 RP / 820 GE
- - minimum repair cost: 700 / 488 -> 571 / 413 SL/minute
- - full stock repair cost: 9723 / 9436 -> 7929 / 7994 SL
- - full spaded repair cost: 13157 / 12769 -> 10730 / 10817 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 3.94 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3600
- - SL cost: 8300 -> 7000
- - GE cost: 330 -> 310
- - Anti-Air Armament Targeting, B-32 APCBC, Damage Control Division, Dry-Docking, ZS-56 HE-TF:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4200
- - GE cost: 210 -> 190
- - Auxiliary Armament Targeting, Fire Division, PB-32 SAPCBC, Rudder Replacement, Smokescreen, ZS-56R HE-VTF:
- - RP cost: 2500 -> 2100
- - SL cost: 4900 -> 4100
- - GE cost: 195 -> 180
- - AZ-ZS-32 HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2800 -> 2300
- - SL cost: 5400 -> 4400
- - GE cost: 220 -> 195
- - talisman: 1500 -> 1400 GE
- - Krasny Kavkaz:
- - 36000 -> 18000 RP
- - 115000 -> 47000 SL
- - crew cost: 33000 -> 13000 SL
- - expert crew cost: 115000 -> 47000 SL
- - ace crew cost: 360000 / 590 -> 280000 RP / 400 GE
- - minimum repair cost: 365 / 296 -> 277 / 281 SL/minute
- - full stock repair cost: 4849 / 6195 -> 3688 / 5900 SL
- - full spaded repair cost: 6314 / 8067 -> 4803 / 7682 SL
- - SL multiplier: 3.26 / 6.0 / 1.0 -> 2.58 / 5.55 / 1.0
- - RP multiplier: 1.48 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2900 -> 1600
- - SL cost: 6300 -> 2600
- - GE cost: 300 -> 240
- - Anti-Air Armament Targeting, B-32 APCBC, Damage Control Division, Dry-Docking:
- - RP cost: 1800 -> 990
- - SL cost: 3900 -> 1600
- - GE cost: 185 -> 150
- - Auxiliary Armament Targeting, Fire Division, HE-TF, PB-32 SAPCBC, Rudder Replacement, Smokescreen:
- - RP cost: 1300 -> 740
- - SL cost: 2800 -> 1200
- - GE cost: 135 -> 115
- - AZ-ZS-32 HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1500 -> 830
- - SL cost: 3300 -> 1400
- - GE cost: 155 -> 125
- - talisman: 1200 -> 980 GE
- - Krasny Krym:
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 464 / 344 -> 318 / 303 SL/minute
- - full stock repair cost: 6149 / 6649 -> 4212 / 5860 SL
- - full spaded repair cost: 7996 / 8646 -> 5477 / 7620 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 3700 -> 2200
- - SL cost: 7900 -> 4100
- - GE cost: 310 -> 260
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, PB obr. 1928 g. SAPBC:
- - RP cost: 2300 -> 1300
- - SL cost: 4900 -> 2400
- - GE cost: 190 -> 155
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 2000 -> 1200
- - SL cost: 4300 -> 2200
- - GE cost: 165 -> 140
- - DG obr. 1928 g. HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1900 -> 1100
- - SL cost: 4100 -> 2100
- - GE cost: 160 -> 130
- - talisman: 1300 -> 1100 GE
- - Mikhail Kutuzov:
- - 175000 -> 52000 RP
- - 490000 -> 310000 SL
- - crew cost: 140000 -> 90000 SL
- - expert crew cost: 490000 -> 310000 SL
- - ace crew cost: 670000 / 1500 -> 570000 RP / 1200 GE
- - minimum repair cost: 934 / 709 -> 851 / 626 SL/minute
- - full stock repair cost: 12778 / 13205 -> 11640 / 11655 SL
- - full spaded repair cost: 16574 / 17127 -> 15097 / 15117 SL
- - RP multiplier: 1.9 -> 1.78
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, ZS-55R HE-VTF:
- - RP cost: 14000 -> 7600
- - SL cost: 22000 -> 13000
- - GE cost: 520 -> 470
- - Anti-Air Armament Targeting, B-35 APCBC, Damage Control Division, Dry-Docking, ZS-55 HE-TF:
- - RP cost: 6900 -> 3700
- - SL cost: 11000 -> 6200
- - GE cost: 260 -> 230
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 6500 -> 3500
- - SL cost: 10000 -> 5800
- - GE cost: 240 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35 HE-TF:
- - RP cost: 7200 -> 3900
- - SL cost: 11000 -> 6500
- - GE cost: 270 -> 240
- - talisman: 2000 -> 1800 GE
- - backup: 50 -> 40 GE
- - Novorossiysk:
- - 390000 -> 380000 RP
- - 1050000 -> 990000 SL
- - crew cost: 300000 -> 280000 SL
- - expert crew cost: 1050000 -> 990000 SL
- - ace crew cost: 890000 / 2200 -> 830000 RP / 2000 GE
- - RP multiplier: 2.14 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - SL cost: 50000 -> 49000
- - GE cost: 700 -> 680
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 20000 -> 19000
- - SL cost: 31000 -> 29000
- - GE cost: 440 -> 410
- - Auxiliary Armament Targeting, Fire Division, Granata Perforante APHEBC, Palla APCBC, Rudder Replacement: GE cost: 290 -> 280
- - Granata Dirompente Contro-aerea HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: SL cost: 19000 -> 18000
- - talisman: 2400 -> 2300 GE
- - Ognevoy:
- - 5900 -> 7900 RP
- - 6300 -> 10000 SL
- - crew cost: 1800 -> 3000 SL
- - expert crew cost: 6300 -> 10000 SL
- - ace crew cost: 135000 / 80 -> 160000 RP / 125 GE
- - minimum repair cost: 86 -> 114 SL/minute
- - full stock repair cost: 632 / 1005 -> 839 / 1329 SL
- - full spaded repair cost: 822 / 1307 -> 1092 / 1729 SL
- - SL multiplier: 0.65 / 1.27 / 1.0 -> 0.88 / 1.73 / 1.0
- - RP multiplier: 1.06 -> 1.12
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 390 -> 450
- - SL cost: 300 -> 440
- - GE cost: 110 -> 125
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361D HE-TF, PB-46A SAPCBC:
- - RP cost: 240 -> 280
- - SL cost: 180 -> 270
- - GE cost: 70 -> 80
- - Auxiliary Armament Targeting, BR-361 APHEBC, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 270 -> 310
- - SL cost: 200 -> 300
- - GE cost: 75 -> 85
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 250 -> 290
- - SL cost: 190 -> 280
- - GE cost: 70 -> 80
- - talisman: 410 -> 530 GE
- - backup: 20 -> 25 GE
- - Parizhskaya Kommuna:
- - 230000 -> 175000 RP
- - 640000 -> 490000 SL
- - crew cost: 185000 -> 140000 SL
- - expert crew cost: 640000 -> 490000 SL
- - ace crew cost: 720000 / 1700 -> 670000 RP / 1500 GE
- - minimum repair cost: 1083 / 1056 -> 1071 / 1056 SL/minute
- - full stock repair cost: 26244 / 31819 -> 25944 / 31819 SL
- - full spaded repair cost: 32928 / 39923 -> 32552 / 39923 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.43 / 6.0 / 1.0
- - RP multiplier: 1.96 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, PB-46 HE:
- - RP cost: 18000 -> 14000
- - SL cost: 28000 -> 22000
- - GE cost: 490 -> 450
- - Anti-Air Armament Targeting, B-17 APCBC, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAP:
- - RP cost: 8700 -> 6900
- - SL cost: 13000 -> 11000
- - GE cost: 240 -> 220
- - Auxiliary Armament Targeting, Fire Division, PB-17 SAPCBC, Rudder Replacement:
- - RP cost: 12000 -> 9700
- - SL cost: 19000 -> 15000
- - GE cost: 330 -> 310
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 11000 -> 8700
- - SL cost: 17000 -> 14000
- - GE cost: 300 -> 280
- - talisman: 2100 -> 2000 GE
- - Poltava:
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 1056 / 1039 -> 1003 / 996 SL/minute
- - full stock repair cost: 25051 / 30816 -> 23791 / 29544 SL
- - full spaded repair cost: 31511 / 38763 -> 29926 / 37162 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.44 / 6.0 / 1.0
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 18000
- - GE cost: 450 -> 440
- - Anti-Air Armament Targeting, B-17 APCBC, Damage Control Division, Dry-Docking, PB obr. 1911 g. SAP:
- - RP cost: 6900 -> 5300
- - SL cost: 11000 -> 8500
- - GE cost: 220 -> 210
- - Auxiliary Armament Targeting, Fire Division, PB-17 SAPCBC, Rudder Replacement:
- - RP cost: 9700 -> 7400
- - SL cost: 15000 -> 12000
- - GE cost: 310 -> 290
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 280 -> 260
- - talisman: 2000 -> 1900 GE
- - Ryany:
- - 550 -> 700 GE
- - crew cost: 1400 -> 2300 SL
- - expert crew cost: 9000 -> 15000 SL
- - ace crew cost: 270000 / 80 -> 320000 RP / 125 GE
- - minimum repair cost: 56 / 69 -> 77 / 75 SL/minute
- - full repair cost: 411 / 806 -> 569 / 869 SL
- - SL multiplier: 1.43 / 2.55 / 1.0 -> 1.96 / 3.4 / 1.0
- - RP multiplier: 1.06 -> 1.12
- - modification changes: Mark of distinction: RP cost: 72000 -> 76000
- - backup: 40 -> 50 GE
- - Soobrazitelny:
- - 11000 -> 9200 RP
- - 22000 -> 16000 SL
- - crew cost: 6300 -> 4500 SL
- - expert crew cost: 22000 -> 16000 SL
- - ace crew cost: 220000 / 250 -> 190000 RP / 180 GE
- - minimum repair cost: 202 / 197 -> 158 / 159 SL/minute
- - full stock repair cost: 1528 / 2325 -> 1196 / 1873 SL
- - full spaded repair cost: 1987 / 3023 -> 1555 / 2435 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.24 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 680 -> 550
- - SL cost: 900 -> 620
- - GE cost: 165 -> 145
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361D HE-TF, PB-46A SAPCBC:
- - RP cost: 420 -> 340
- - SL cost: 560 -> 380
- - GE cost: 100 -> 90
- - Auxiliary Armament Targeting, BR-361 APHEBC, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 470 -> 380
- - SL cost: 620 -> 430
- - GE cost: 115 -> 100
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 430 -> 350
- - SL cost: 570 -> 400
- - GE cost: 105 -> 95
- - talisman: 750 -> 640 GE
- - Sverdlov:
- - 125000 -> 45000 RP
- - 360000 -> 300000 SL
- - crew cost: 105000 -> 87000 SL
- - expert crew cost: 360000 -> 300000 SL
- - ace crew cost: 620000 / 1400 -> 520000 RP / 1100 GE
- - minimum repair cost: 911 / 666 -> 827 / 583 SL/minute
- - full stock repair cost: 12628 / 12398 -> 11476 / 10852 SL
- - full spaded repair cost: 16421 / 16122 -> 14924 / 14112 SL
- - RP multiplier: 1.84 -> 1.72
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode, ZS-55R HE-VTF:
- - RP cost: 8600 -> 5100
- - SL cost: 14000 -> 8800
- - GE cost: 420 -> 360
- - Anti-Air Armament Targeting, B-35 APCBC, Damage Control Division, Dry-Docking, ZS-55 HE-TF:
- - RP cost: 5300 -> 3100
- - SL cost: 8500 -> 5300
- - GE cost: 260 -> 220
- - Auxiliary Armament Targeting, F-55 HE-BF, Fire Division, PB-35 SAPBC (Flat Nose), Rudder Replacement, Smokescreen:
- - RP cost: 4900 -> 2900
- - SL cost: 7800 -> 5000
- - GE cost: 240 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-35 HE-TF:
- - RP cost: 5500 -> 3300
- - SL cost: 8800 -> 5700
- - GE cost: 270 -> 230
- - talisman: 1900 -> 1700 GE
- - backup: 50 -> 40 GE
- - Tashkent:
- - 11000 -> 18000 RP
- - 22000 -> 47000 SL
- - crew cost: 6300 -> 13000 SL
- - expert crew cost: 22000 -> 47000 SL
- - ace crew cost: 220000 / 250 -> 280000 RP / 400 GE
- - minimum repair cost: 202 / 206 -> 279 / 280 SL/minute
- - full stock repair cost: 1539 / 2441 -> 2122 / 3315 SL
- - full spaded repair cost: 2002 / 3174 -> 2760 / 4311 SL
- - SL multiplier: 1.36 / 3.34 / 1.0 -> 1.89 / 4.62 / 1.0
- - RP multiplier: 1.24 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 840 -> 1600
- - SL cost: 1100 -> 2600
- - GE cost: 195 -> 240
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, O-361D HE-TF, PB-46A SAPCBC:
- - RP cost: 420 -> 790
- - SL cost: 560 -> 1300
- - GE cost: 95 -> 120
- - Auxiliary Armament Targeting, BR-361 APHEBC, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 470 -> 890
- - SL cost: 620 -> 1500
- - GE cost: 110 -> 135
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation, ZS-46R HE-VTF:
- - RP cost: 430 -> 830
- - SL cost: 570 -> 1400
- - GE cost: 100 -> 125
- - talisman: 750 -> 980 GE
- - backup: 25 -> 30 GE
- - Arethusa (26):
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 457 / 344 -> 321 / 303 SL/minute
- - full stock repair cost: 6079 / 6649 -> 4274 / 5860 SL
- - full spaded repair cost: 7905 / 8646 -> 5558 / 7620 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 3000 -> 1700
- - SL cost: 6400 -> 3200
- - GE cost: 290 -> 230
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Va SAP, SAPBC:
- - RP cost: 1800 -> 1100
- - SL cost: 3900 -> 2100
- - GE cost: 175 -> 150
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 1700 -> 1000
- - SL cost: 3600 -> 1900
- - GE cost: 165 -> 135
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1900 -> 1100
- - SL cost: 4100 -> 2100
- - GE cost: 185 -> 150
- - talisman: 1300 -> 1100 GE
- - Colossus:
- - 230000 -> 125000 RP
- - 640000 -> 360000 SL
- - crew cost: 185000 -> 105000 SL
- - expert crew cost: 640000 -> 360000 SL
- - ace crew cost: 720000 / 1700 -> 620000 RP / 1400 GE
- - minimum repair cost: 1058 / 1042 -> 1005 / 999 SL/minute
- - full stock repair cost: 25114 / 30894 -> 23851 / 29618 SL
- - full spaded repair cost: 31511 / 38763 -> 29926 / 37162 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.44 / 6.0 / 1.0
- - RP multiplier: 1.96 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 14000
- - SL cost: 37000 -> 22000
- - GE cost: 610 -> 520
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. VIa APC, SAPBC:
- - RP cost: 8700 -> 5300
- - SL cost: 13000 -> 8500
- - GE cost: 220 -> 200
- - Auxiliary Armament Targeting, Fire Division, Mk. VIIa SAPCBC, Rudder Replacement:
- - RP cost: 12000 -> 7400
- - SL cost: 19000 -> 12000
- - GE cost: 310 -> 280
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 11000 -> 6600
- - SL cost: 17000 -> 11000
- - GE cost: 280 -> 250
- - talisman: 2100 -> 1900 GE
- - Dreadnought:
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 993 / 992 -> 950 / 949 SL/minute
- - full stock repair cost: 22774 / 28736 -> 21787 / 27490 SL
- - full spaded repair cost: 28574 / 36055 -> 27336 / 34492 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 14000
- - SL cost: 30000 -> 22000
- - GE cost: 540 -> 490
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. VIa APC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 250 -> 230
- - Auxiliary Armament Targeting, Fire Division, Mk. VIIa SAPCBC, Rudder Replacement:
- - RP cost: 9700 -> 7400
- - SL cost: 15000 -> 12000
- - GE cost: 280 -> 260
- - talisman: 2000 -> 1900 GE
- - Enterprise (D 52):
- - 26000 -> 18000 RP
- - 76000 -> 47000 SL
- - crew cost: 22000 -> 13000 SL
- - expert crew cost: 76000 -> 47000 SL
- - ace crew cost: 320000 / 500 -> 280000 RP / 400 GE
- - minimum repair cost: 309 / 288 -> 267 / 271 SL/minute
- - full stock repair cost: 4107 / 6044 -> 3549 / 5677 SL
- - full spaded repair cost: 5558 / 8179 -> 4803 / 7682 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 2.58 / 5.55 / 1.0
- - RP multiplier: 1.42 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1300
- - SL cost: 3200 -> 2100
- - GE cost: 220 -> 210
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, SAP:
- - RP cost: 1300 -> 990
- - SL cost: 2400 -> 1600
- - GE cost: 170 -> 160
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, SAPBC, Smokescreen:
- - RP cost: 1000 -> 740
- - SL cost: 1900 -> 1200
- - GE cost: 130 -> 120
- - HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1100 -> 830
- - SL cost: 2100 -> 1400
- - GE cost: 145 -> 135
- - talisman: 1100 -> 980 GE
- - Eskimo (F 75):
- - 9200 -> 7900 RP
- - 16000 -> 10000 SL
- - crew cost: 4500 -> 3000 SL
- - expert crew cost: 16000 -> 10000 SL
- - ace crew cost: 190000 / 180 -> 160000 RP / 125 GE
- - minimum repair cost: 158 / 159 -> 115 SL/minute
- - full stock repair cost: 1194 / 1870 -> 870 / 1353 SL
- - full spaded repair cost: 1555 / 2435 -> 1133 / 1762 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 0.81 / 1.86 / 1.0
- - RP multiplier: 1.18 -> 1.12
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mk. VIIa HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 460 -> 380
- - SL cost: 520 -> 370
- - GE cost: 135 -> 115
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Va SAP:
- - RP cost: 340 -> 280
- - SL cost: 380 -> 270
- - GE cost: 100 -> 85
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Mk. VIIa HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 320 -> 260
- - SL cost: 360 -> 250
- - GE cost: 95 -> 80
- - HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 350 -> 290
- - SL cost: 400 -> 280
- - GE cost: 100 -> 90
- - talisman: 640 -> 530 GE
- - Glorious (77):
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 802 / 850 -> 760 / 807 SL/minute
- - full stock repair cost: 15554 / 21446 -> 14723 / 20365 SL
- - full spaded repair cost: 19589 / 27011 -> 18543 / 25649 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 14000 -> 11000
- - SL cost: 22000 -> 18000
- - GE cost: 420 -> 410
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. XIIa APCBC, SAP:
- - RP cost: 6900 -> 5300
- - SL cost: 11000 -> 8500
- - GE cost: 210 -> 200
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 13000 -> 9900
- - SL cost: 21000 -> 16000
- - GE cost: 390 -> 370
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 260 -> 250
- - talisman: 2000 -> 1900 GE
- - Hawkins (D 86):
- - 36000 -> 26000 RP
- - 115000 -> 76000 SL
- - crew cost: 33000 -> 22000 SL
- - expert crew cost: 115000 -> 76000 SL
- - ace crew cost: 360000 / 590 -> 320000 RP / 500 GE
- - minimum repair cost: 365 / 299 -> 321 / 303 SL/minute
- - full stock repair cost: 4855 / 5785 -> 4274 / 5860 SL
- - full spaded repair cost: 6314 / 7523 -> 5558 / 7620 SL
- - SL multiplier: 3.26 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.48 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 2900 -> 2200
- - SL cost: 6300 -> 4100
- - GE cost: 280 -> 260
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, SAP, SAPBC:
- - RP cost: 1400 -> 1100
- - SL cost: 3000 -> 2100
- - GE cost: 135 -> 130
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 1600 -> 1200
- - SL cost: 3500 -> 2200
- - GE cost: 155 -> 140
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1800 -> 1300
- - SL cost: 3900 -> 2400
- - GE cost: 175 -> 155
- - talisman: 1200 -> 1100 GE
- - Invincible (85):
- - 125000 -> 75000 RP
- - 360000 -> 250000 SL
- - crew cost: 105000 -> 72000 SL
- - expert crew cost: 360000 -> 250000 SL
- - ace crew cost: 620000 / 1400 -> 480000 RP / 940 GE
- - minimum repair cost: 950 / 949 -> 749 / 753 SL/minute
- - full stock repair cost: 21787 / 27490 -> 17191 / 21805 SL
- - full spaded repair cost: 27336 / 34492 -> 21570 / 27359 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.16 / 5.56 / 1.0
- - RP multiplier: 1.84 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 14000 -> 7200
- - SL cost: 22000 -> 14000
- - GE cost: 520 -> 430
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. VIa APC, SAP:
- - RP cost: 5300 -> 2700
- - SL cost: 8500 -> 5200
- - GE cost: 200 -> 160
- - Auxiliary Armament Targeting, Fire Division, Mk. VIIa SAPCBC, Rudder Replacement:
- - RP cost: 7400 -> 3800
- - SL cost: 12000 -> 7400
- - GE cost: 280 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 6600 -> 3300
- - SL cost: 11000 -> 6400
- - GE cost: 250 -> 195
- - talisman: 1900 -> 1500 GE
- - backup: 50 -> 40 GE
- - Kelvin (F 37):
- - 11000 -> 9200 RP
- - 22000 -> 16000 SL
- - crew cost: 6300 -> 4500 SL
- - expert crew cost: 22000 -> 16000 SL
- - ace crew cost: 220000 / 250 -> 190000 RP / 180 GE
- - minimum repair cost: 202 / 197 -> 158 / 159 SL/minute
- - full stock repair cost: 1526 / 2322 -> 1194 / 1870 SL
- - full spaded repair cost: 1987 / 3023 -> 1555 / 2435 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.24 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mk. VIIa HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 560 -> 460
- - SL cost: 740 -> 520
- - GE cost: 145 -> 130
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, HE / HE / HE / AP-T, Mk. Va SAP:
- - RP cost: 420 -> 340
- - SL cost: 560 -> 380
- - GE cost: 105 -> 95
- - AP-T / AP-T / AP-T / HE, Auxiliary Armament Targeting, Fire Division, Mk. VIIa HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 390 -> 320
- - SL cost: 520 -> 360
- - GE cost: 100 -> 90
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 420
- - SL cost: 690 -> 470
- - GE cost: 135 -> 115
- - talisman: 750 -> 640 GE
- - Kent (54):
- - 75000 -> 61000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 65000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 440000 RP / 820 GE
- - minimum repair cost: 697 / 504 -> 568 / 429 SL/minute
- - full stock repair cost: 9670 / 9385 -> 7874 / 7993 SL
- - full spaded repair cost: 13086 / 12700 -> 10655 / 10816 SL
- - SL multiplier: 4.24 / 6.0 / 1.0 -> 3.89 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3600
- - SL cost: 8300 -> 7000
- - GE cost: 300 -> 280
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC, SAP:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4200
- - GE cost: 190 -> 170
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 3000 -> 2500
- - SL cost: 5800 -> 4800
- - GE cost: 210 -> 195
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2800
- - SL cost: 6400 -> 5400
- - GE cost: 230 -> 220
- - talisman: 1500 -> 1400 GE
- - Nepal (G 25):
- - 14000 -> 9200 RP
- - 32000 -> 16000 SL
- - crew cost: 9200 -> 4500 SL
- - expert crew cost: 32000 -> 16000 SL
- - ace crew cost: 250000 / 320 -> 190000 RP / 180 GE
- - minimum repair cost: 247 / 246 -> 158 / 159 SL/minute
- - full stock repair cost: 1865 / 2898 -> 1194 / 1870 SL
- - full spaded repair cost: 2429 / 3774 -> 1555 / 2435 SL
- - SL multiplier: 1.65 / 3.8 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.3 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mk. VIIa HE-VTF, New Pumps, Torpedo Mode:
- - RP cost: 750 -> 460
- - SL cost: 1100 -> 520
- - GE cost: 160 -> 130
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Va SAP, SAP:
- - RP cost: 550 -> 340
- - SL cost: 790 -> 380
- - GE cost: 120 -> 95
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Mk. VIIa HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 520 -> 320
- - SL cost: 750 -> 360
- - GE cost: 110 -> 90
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 690 -> 420
- - SL cost: 1000 -> 470
- - GE cost: 150 -> 115
- - talisman: 860 -> 640 GE
- - Norfolk (78):
- - 45000 -> 37000 RP
- - 300000 -> 250000 SL
- - crew cost: 87000 -> 72000 SL
- - expert crew cost: 300000 -> 250000 SL
- - ace crew cost: 520000 / 1100 -> 480000 RP / 940 GE
- - minimum repair cost: 811 / 565 -> 728 / 507 SL/minute
- - full stock repair cost: 11261 / 10929 -> 10105 / 9806 SL
- - full spaded repair cost: 14663 / 14231 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 6400 -> 5400
- - SL cost: 11000 -> 10000
- - GE cost: 410 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC, Mk. Va SAP:
- - RP cost: 3100 -> 2700
- - SL cost: 5300 -> 5200
- - GE cost: 200 -> 190
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 3000
- - SL cost: 6000 -> 5800
- - GE cost: 230 -> 210
- - HE-VTF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2800
- - SL cost: 5700 -> 5400
- - GE cost: 210 -> 195
- - talisman: 1700 -> 1500 GE
- - Orion (52):
- - 290000 -> 175000 RP
- - 790000 -> 490000 SL
- - crew cost: 230000 -> 140000 SL
- - expert crew cost: 790000 -> 490000 SL
- - ace crew cost: 780000 / 1800 -> 670000 RP / 1500 GE
- - RP multiplier: 2.02 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 31000 -> 19000
- - SL cost: 46000 -> 30000
- - GE cost: 600 -> 540
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, SAPCBC:
- - RP cost: 16000 -> 9700
- - SL cost: 24000 -> 15000
- - GE cost: 310 -> 280
- - Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. IIa APCBC, Primary Armament Targeting, Propeller Replacement, SAPBC, Shrapnel Protection, Ventilation:
- - RP cost: 14000 -> 8700
- - SL cost: 21000 -> 14000
- - GE cost: 270 -> 250
- - talisman: 2200 -> 2000 GE
- - Queen Mary (14):
- - 230000 -> 175000 RP
- - 640000 -> 490000 SL
- - crew cost: 185000 -> 140000 SL
- - expert crew cost: 640000 -> 490000 SL
- - ace crew cost: 720000 / 1700 -> 670000 RP / 1500 GE
- - RP multiplier: 1.96 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 19000
- - SL cost: 37000 -> 30000
- - GE cost: 580 -> 540
- - Auxiliary Armament Targeting, Fire Division, Mk. I SAPCBC, Rudder Replacement:
- - RP cost: 12000 -> 9700
- - SL cost: 19000 -> 15000
- - GE cost: 290 -> 280
- - Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. Ia APCBC, Primary Armament Targeting, Propeller Replacement, SAPBC, Shrapnel Protection, Ventilation:
- - RP cost: 11000 -> 8700
- - SL cost: 17000 -> 14000
- - GE cost: 270 -> 250
- - talisman: 2100 -> 2000 GE
- - Rodney (29):
- - 400000 -> 380000 RP
- - 1080000 -> 990000 SL
- - crew cost: 310000 -> 280000 SL
- - expert crew cost: 1080000 -> 990000 SL
- - ace crew cost: 950000 / 2400 -> 830000 RP / 2000 GE
- - RP multiplier: 2.2 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 20000 -> 19000
- - SL cost: 31000 -> 29000
- - GE cost: 450 -> 410
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. Ia APCBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 340 -> 320
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement:
- - RP cost: 23000 -> 22000
- - SL cost: 36000 -> 34000
- - GE cost: 520 -> 470
- - talisman: 2600 -> 2300 GE
- - Southampton (83):
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 819 / 583 -> 699 / 487 SL/minute
- - full stock repair cost: 11374 / 11272 -> 9710 / 9423 SL
- - full spaded repair cost: 15412 / 15274 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, HE-VTF, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 5000 -> 3600
- - SL cost: 8300 -> 7000
- - GE cost: 340 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Va SAP, SAPBC:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 5200
- - GE cost: 250 -> 220
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4900
- - GE cost: 230 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5400
- - GE cost: 260 -> 230
- - talisman: 1800 -> 1500 GE
- - Warspite (03):
- - 400000 -> 390000 RP
- - 1080000 -> 1050000 SL
- - crew cost: 310000 -> 300000 SL
- - expert crew cost: 1080000 -> 1050000 SL
- - ace crew cost: 950000 / 2400 -> 890000 RP / 2200 GE
- - RP multiplier: 2.2 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 25000 -> 24000
- - SL cost: 39000 -> 37000
- - GE cost: 600 -> 560
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Mk. XIIa APCBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 360 -> 350
- - Auxiliary Armament Targeting, Fire Division, Mk. XVIIb APCBC, Rudder Replacement, SAPBC:
- - RP cost: 14000 -> 13000
- - SL cost: 22000 -> 20000
- - GE cost: 330 -> 300
- - talisman: 2600 -> 2400 GE
- - York (90):
- - 89000 -> 75000 RP
- - 300000 -> 250000 SL
- - crew cost: 87000 -> 72000 SL
- - expert crew cost: 300000 -> 250000 SL
- - ace crew cost: 520000 / 1100 -> 480000 RP / 940 GE
- - minimum repair cost: 779 / 543 -> 699 / 487 SL/minute
- - full stock repair cost: 10821 / 10502 -> 9710 / 9423 SL
- - full spaded repair cost: 14663 / 14231 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 5100 -> 4300
- - SL cost: 8800 -> 8300
- - GE cost: 330 -> 300
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Mk. Ib SAPCBC, SAP:
- - RP cost: 3100 -> 2700
- - SL cost: 5300 -> 5200
- - GE cost: 200 -> 190
- - Auxiliary Armament Targeting, Fire Division, HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 3000
- - SL cost: 6000 -> 5800
- - GE cost: 230 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 3300
- - SL cost: 6700 -> 6400
- - GE cost: 250 -> 230
- - talisman: 1700 -> 1500 GE
- - Aoba:
- - 89000 -> 37000 RP
- - 300000 -> 250000 SL
- - crew cost: 87000 -> 72000 SL
- - expert crew cost: 300000 -> 250000 SL
- - ace crew cost: 520000 / 1100 -> 480000 RP / 940 GE
- - minimum repair cost: 814 / 567 -> 731 / 509 SL/minute
- - full stock repair cost: 11305 / 10972 -> 10144 / 9845 SL
- - full spaded repair cost: 14663 / 14231 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 8500 -> 7200
- - SL cost: 15000 -> 14000
- - GE cost: 500 -> 460
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91 APHEBC:
- - RP cost: 3100 -> 2700
- - SL cost: 5300 -> 5200
- - GE cost: 180 -> 170
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0 HE-TF:
- - RP cost: 3500 -> 3000
- - SL cost: 6000 -> 5800
- - GE cost: 200 -> 190
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 3300
- - SL cost: 6700 -> 6400
- - GE cost: 230 -> 210
- - talisman: 1700 -> 1500 GE
- - Ayanami:
- - 5900 -> 9200 RP
- - 6300 -> 16000 SL
- - crew cost: 1800 -> 4500 SL
- - expert crew cost: 6300 -> 16000 SL
- - ace crew cost: 135000 / 80 -> 190000 RP / 180 GE
- - minimum repair cost: 87 -> 161 SL/minute
- - full stock repair cost: 642 / 1020 -> 1188 / 1879 SL
- - full spaded repair cost: 822 / 1307 -> 1522 / 2406 SL
- - SL multiplier: 0.65 / 1.27 / 1.0 -> 1.15 / 2.25 / 1.0
- - RP multiplier: 1.06 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 390 -> 550
- - SL cost: 300 -> 620
- - GE cost: 100 -> 130
- - AP / AP / AP / T, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 1 HE-TF:
- - RP cost: 220 -> 320
- - SL cost: 165 -> 360
- - GE cost: 55 -> 75
- - Damage Control Division, Dry-Docking, IAI / IAI / IAI / T:
- - RP cost: 400 -> 560
- - SL cost: 300 -> 630
- - GE cost: 100 -> 135
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 300 -> 420
- - SL cost: 230 -> 470
- - GE cost: 75 -> 100
- - talisman: 410 -> 640 GE
- - backup: 20 -> 25 GE
- - Furutaka:
- - 75000 -> 61000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 65000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 440000 RP / 820 GE
- - minimum repair cost: 702 / 489 -> 573 / 414 SL/minute
- - full stock repair cost: 9750 / 9462 -> 7951 / 8015 SL
- - full spaded repair cost: 13157 / 12769 -> 10730 / 10817 SL
- - SL multiplier: 4.29 / 6.0 / 1.0 -> 3.94 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 5400 -> 4500
- - SL cost: 10000 -> 8700
- - GE cost: 360 -> 330
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91 APHEBC:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4200
- - GE cost: 180 -> 165
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0 HE-TF:
- - RP cost: 3000 -> 2500
- - SL cost: 5800 -> 4800
- - GE cost: 200 -> 185
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2800
- - SL cost: 6400 -> 5400
- - GE cost: 220 -> 210
- - talisman: 1500 -> 1400 GE
- - Fusō:
- - 390000 -> 380000 RP
- - 1050000 -> 990000 SL
- - crew cost: 300000 -> 280000 SL
- - expert crew cost: 1050000 -> 990000 SL
- - ace crew cost: 890000 / 2200 -> 830000 RP / 2000 GE
- - RP multiplier: 2.14 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - SL cost: 50000 -> 49000
- - GE cost: 700 -> 680
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 4 SAP, Type 91 APCBC: SL cost: 19000 -> 18000
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Type 0 HE:
- - RP cost: 17000 -> 16000
- - SL cost: 26000 -> 25000
- - GE cost: 370 -> 340
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 330 -> 320
- - talisman: 2400 -> 2300 GE
- - Haguro:
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 823 / 585 -> 702 / 489 SL/minute
- - full stock repair cost: 11420 / 11318 -> 9750 / 9462 SL
- - full spaded repair cost: 15412 / 15274 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 7600 -> 5400
- - SL cost: 13000 -> 10000
- - GE cost: 420 -> 360
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91 APHEBC:
- - RP cost: 3700 -> 2700
- - SL cost: 6200 -> 5200
- - GE cost: 210 -> 180
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0 HE-TF:
- - RP cost: 4200 -> 3000
- - SL cost: 7000 -> 5800
- - GE cost: 230 -> 200
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 4700 -> 3300
- - SL cost: 7800 -> 6400
- - GE cost: 260 -> 220
- - talisman: 1800 -> 1500 GE
- - Hatsuharu:
- - 11000 -> 7900 RP
- - 22000 -> 10000 SL
- - crew cost: 6300 -> 3000 SL
- - expert crew cost: 22000 -> 10000 SL
- - ace crew cost: 220000 / 250 -> 160000 RP / 125 GE
- - minimum repair cost: 206 / 201 -> 117 SL/minute
- - full stock repair cost: 1552 / 2361 -> 884 / 1376 SL
- - full spaded repair cost: 1987 / 3023 -> 1133 / 1762 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 0.81 / 1.86 / 1.0
- - RP multiplier: 1.24 -> 1.12
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 680 -> 450
- - SL cost: 900 -> 440
- - GE cost: 160 -> 120
- - APHE / APHE / APHE / HE, Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 1 HE-TF:
- - RP cost: 390 -> 260
- - SL cost: 520 -> 250
- - GE cost: 90 -> 70
- - Damage Control Division, Dry-Docking, HE / HE / HE / APHE:
- - RP cost: 690 -> 460
- - SL cost: 910 -> 450
- - GE cost: 160 -> 125
- - HE-TF / HE-TF / HE-TF / HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 430 -> 290
- - SL cost: 570 -> 280
- - GE cost: 100 -> 75
- - talisman: 750 -> 530 GE
- - Isuzu:
- - 26000 -> 18000 RP
- - 76000 -> 47000 SL
- - crew cost: 22000 -> 13000 SL
- - expert crew cost: 76000 -> 47000 SL
- - ace crew cost: 320000 / 500 -> 280000 RP / 400 GE
- - minimum repair cost: 328 / 306 -> 283 / 287 SL/minute
- - full stock repair cost: 4357 / 6412 -> 3765 / 6023 SL
- - full spaded repair cost: 5558 / 8179 -> 4803 / 7682 SL
- - SL multiplier: 2.92 / 6.0 / 1.0 -> 2.58 / 5.55 / 1.0
- - RP multiplier: 1.42 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 2900 -> 2100
- - SL cost: 5400 -> 3400
- - GE cost: 310 -> 270
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking:
- - RP cost: 1800 -> 1300
- - SL cost: 3400 -> 2100
- - GE cost: 190 -> 170
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 0 HE-TF:
- - RP cost: 1000 -> 740
- - SL cost: 1900 -> 1200
- - GE cost: 105 -> 95
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1300 -> 990
- - SL cost: 2400 -> 1600
- - GE cost: 140 -> 130
- - talisman: 1100 -> 980 GE
- - Kako:
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 442 / 276 -> 312 / 237 SL/minute
- - full stock repair cost: 5749 / 5987 -> 4057 / 5151 SL
- - full spaded repair cost: 7790 / 8113 -> 5497 / 6979 SL
- - SL multiplier: 3.8 / 6.0 / 1.0 -> 3.07 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3000 -> 1700
- - SL cost: 6400 -> 3200
- - GE cost: 250 -> 200
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Type 88 APCBC, Ventilation:
- - RP cost: 2300 -> 1300
- - SL cost: 4900 -> 2400
- - GE cost: 190 -> 155
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0 HE-TF:
- - RP cost: 2000 -> 1200
- - SL cost: 4300 -> 2200
- - GE cost: 165 -> 140
- - talisman: 1300 -> 1100 GE
- - Murasame (DD-107):
- - 14000 -> 9200 RP
- - 32000 -> 16000 SL
- - crew cost: 9200 -> 4500 SL
- - expert crew cost: 32000 -> 16000 SL
- - ace crew cost: 250000 / 320 -> 190000 RP / 180 GE
- - minimum repair cost: 252 / 251 -> 161 / 162 SL/minute
- - full stock repair cost: 1904 / 2959 -> 1219 / 1909 SL
- - full spaded repair cost: 2429 / 3774 -> 1555 / 2435 SL
- - SL multiplier: 1.65 / 3.8 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.3 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 1100 -> 680
- - SL cost: 1600 -> 770
- - GE cost: 195 -> 155
- - Auxiliary Armament Targeting, Fire Division, Mk. 31 Mod. 1 HE-VTF, Mk. 41 HE-VTF, Rudder Replacement, Smokescreen:
- - RP cost: 520 -> 320
- - SL cost: 750 -> 360
- - GE cost: 90 -> 75
- - Damage Control Division, Dry-Docking, Mk. 42 Sp. Com.:
- - RP cost: 920 -> 560
- - SL cost: 1300 -> 630
- - GE cost: 160 -> 125
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 690 -> 420
- - SL cost: 1000 -> 470
- - GE cost: 120 -> 95
- - talisman: 860 -> 640 GE
- - Sendai:
- - 48000 -> 36000 RP
- - 180000 -> 115000 SL
- - crew cost: 52000 -> 33000 SL
- - expert crew cost: 180000 -> 115000 SL
- - ace crew cost: 390000 / 700 -> 360000 RP / 590 GE
- - minimum repair cost: 439 / 327 -> 350 / 284 SL/minute
- - full stock repair cost: 5834 / 6849 -> 4659 / 5953 SL
- - full spaded repair cost: 7905 / 9281 -> 6314 / 8067 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 3.26 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.48
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 2500 -> 1900
- - SL cost: 5400 -> 4100
- - GE cost: 250 -> 220
- - Anti-Air Armament Targeting, AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking, Mod. 2 SAP:
- - RP cost: 1800 -> 1400
- - SL cost: 3900 -> 3000
- - GE cost: 180 -> 165
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 2 HE-TF:
- - RP cost: 1700 -> 1300
- - SL cost: 3600 -> 2800
- - GE cost: 170 -> 155
- - Improved Rangefinder, Mod. 1 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1900 -> 1500
- - SL cost: 4100 -> 3300
- - GE cost: 190 -> 180
- - talisman: 1300 -> 1200 GE
- - Tama:
- - 36000 -> 26000 RP
- - 115000 -> 76000 SL
- - crew cost: 33000 -> 22000 SL
- - expert crew cost: 115000 -> 76000 SL
- - ace crew cost: 360000 / 590 -> 320000 RP / 500 GE
- - minimum repair cost: 350 / 284 -> 308 / 288 SL/minute
- - full stock repair cost: 4659 / 5953 -> 4102 / 6036 SL
- - full spaded repair cost: 6314 / 8067 -> 5558 / 8179 SL
- - SL multiplier: 3.26 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.48 -> 1.42
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Hydroplane, Mines, New Pumps, Torpedo Mode:
- - RP cost: 1700 -> 1200
- - SL cost: 3700 -> 2200
- - GE cost: 210 -> 180
- - Anti-Air Armament Targeting, AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking, Mod. 2 SAP:
- - RP cost: 1400 -> 1100
- - SL cost: 3000 -> 2100
- - GE cost: 175 -> 165
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 2 HE-TF:
- - RP cost: 1300 -> 1000
- - SL cost: 2800 -> 1900
- - GE cost: 160 -> 150
- - Improved Rangefinder, Mod. 1 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1500 -> 1100
- - SL cost: 3300 -> 2100
- - GE cost: 185 -> 165
- - talisman: 1200 -> 1100 GE
- - Tone:
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 955 / 709 -> 913 / 667 SL/minute
- - full stock repair cost: 13238 / 13205 -> 12660 / 12430 SL
- - full spaded repair cost: 17169 / 17127 -> 16421 / 16122 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 19000 -> 14000
- - SL cost: 30000 -> 22000
- - GE cost: 610 -> 560
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Type 91 APHEBC:
- - RP cost: 6900 -> 5300
- - SL cost: 11000 -> 8500
- - GE cost: 220 -> 210
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Type 0 HE-TF:
- - RP cost: 7800 -> 5900
- - SL cost: 12000 -> 9400
- - GE cost: 250 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 8700 -> 6600
- - SL cost: 14000 -> 11000
- - GE cost: 280 -> 260
- - talisman: 2000 -> 1900 GE
- - Yūgumo:
- - 9200 -> 11000 RP
- - 16000 -> 22000 SL
- - crew cost: 4500 -> 6300 SL
- - expert crew cost: 16000 -> 22000 SL
- - ace crew cost: 190000 / 180 -> 220000 RP / 250 GE
- - minimum repair cost: 161 / 162 -> 206 / 201 SL/minute
- - full stock repair cost: 1219 / 1909 -> 1558 / 2370 SL
- - full spaded repair cost: 1555 / 2435 -> 1987 / 3023 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 1.38 / 3.18 / 1.0
- - RP multiplier: 1.18 -> 1.24
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps:
- - RP cost: 680 -> 840
- - SL cost: 770 -> 1100
- - GE cost: 155 -> 175
- - AP-T / AP-T / AP-T / HE, Damage Control Division, Dry-Docking:
- - RP cost: 560 -> 690
- - SL cost: 630 -> 910
- - GE cost: 125 -> 145
- - Auxiliary Armament Targeting, Fire Division, HEF-T / HEI / HEI / HEI, Rudder Replacement, Smokescreen, Type 1 HE-TF:
- - RP cost: 320 -> 390
- - SL cost: 360 -> 520
- - GE cost: 75 -> 80
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 520
- - SL cost: 470 -> 690
- - GE cost: 95 -> 110
- - talisman: 640 -> 750 GE
- - Andrea Doria:
- - 290000 -> 175000 RP
- - 790000 -> 490000 SL
- - crew cost: 230000 -> 140000 SL
- - expert crew cost: 790000 -> 490000 SL
- - ace crew cost: 780000 / 1800 -> 670000 RP / 1500 GE
- - RP multiplier: 2.02 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps, Perforante Mod. 1916 APHE, Torpedo Mode:
- - RP cost: 19000 -> 11000
- - SL cost: 28000 -> 18000
- - GE cost: 420 -> 350
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 19000 -> 12000
- - SL cost: 28000 -> 19000
- - GE cost: 420 -> 390
- - Auxiliary Armament Targeting, Fire Division, Palla APCBC, Rudder Replacement:
- - RP cost: 16000 -> 9700
- - SL cost: 24000 -> 15000
- - GE cost: 350 -> 310
- - Improved Rangefinder, Perforante APHE, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 12000 -> 7200
- - SL cost: 18000 -> 11000
- - GE cost: 260 -> 230
- - talisman: 2200 -> 2000 GE
- - Bartolomeo Colleoni:
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 440 / 327 -> 309 / 288 SL/minute
- - full stock repair cost: 5842 / 6858 -> 4107 / 6044 SL
- - full spaded repair cost: 7905 / 9281 -> 5558 / 8179 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Contro-aerea HE-TF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 2500 -> 1400
- - SL cost: 5400 -> 2600
- - GE cost: 230 -> 185
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 3000 -> 1800
- - SL cost: 6400 -> 3400
- - GE cost: 280 -> 240
- - Auxiliary Armament Targeting, Fire Division, Palla APHEBC, Perforante APHE, Rudder Replacement, Smokescreen:
- - RP cost: 1700 -> 1000
- - SL cost: 3600 -> 1900
- - GE cost: 155 -> 130
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1900 -> 1100
- - SL cost: 4100 -> 2100
- - GE cost: 175 -> 145
- - talisman: 1300 -> 1100 GE
- - Conte di Cavour:
- - 400000 -> 390000 RP
- - 1080000 -> 1050000 SL
- - crew cost: 310000 -> 300000 SL
- - expert crew cost: 1080000 -> 1050000 SL
- - ace crew cost: 950000 / 2400 -> 890000 RP / 2200 GE
- - RP multiplier: 2.2 -> 2.14
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 33000 -> 32000
- - SL cost: 52000 -> 50000
- - GE cost: 740 -> 700
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Perforante APHEBC: GE cost: 340 -> 330
- - Auxiliary Armament Targeting, Fire Division, Palla APCBC, Rudder Replacement:
- - SL cost: 27000 -> 26000
- - GE cost: 380 -> 370
- - Contro-aerea HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 13000 -> 12000
- - SL cost: 20000 -> 19000
- - GE cost: 290 -> 260
- - talisman: 2600 -> 2400 GE
- - Dante Alighieri:
- - 230000 -> 175000 RP
- - 640000 -> 490000 SL
- - crew cost: 185000 -> 140000 SL
- - expert crew cost: 640000 -> 490000 SL
- - ace crew cost: 720000 / 1700 -> 670000 RP / 1500 GE
- - RP multiplier: 1.96 -> 1.9
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 24000 -> 19000
- - SL cost: 37000 -> 30000
- - GE cost: 540 -> 510
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 15000 -> 12000
- - SL cost: 23000 -> 19000
- - GE cost: 340 -> 320
- - Auxiliary Armament Targeting, Fire Division, Palla APCBC, Rudder Replacement:
- - RP cost: 12000 -> 9700
- - SL cost: 19000 -> 15000
- - GE cost: 270 -> 260
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 11000 -> 8700
- - SL cost: 17000 -> 14000
- - GE cost: 250 -> 230
- - talisman: 2100 -> 2000 GE
- - Duilio:
- - 390000 -> 380000 RP
- - 1050000 -> 990000 SL
- - crew cost: 300000 -> 280000 SL
- - expert crew cost: 1050000 -> 990000 SL
- - ace crew cost: 890000 / 2200 -> 830000 RP / 2000 GE
- - RP multiplier: 2.14 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - SL cost: 50000 -> 49000
- - GE cost: 700 -> 680
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Perforante APHEBC: GE cost: 330 -> 320
- - Auxiliary Armament Targeting, Fire Division, Palla APCBC, Rudder Replacement:
- - RP cost: 17000 -> 16000
- - SL cost: 26000 -> 25000
- - GE cost: 370 -> 340
- - Contro-aerea HE-TF, Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: SL cost: 19000 -> 18000
- - talisman: 2400 -> 2300 GE
- - Eugenio di Savoia:
- - 105000 -> 75000 RP
- - 310000 -> 250000 SL
- - crew cost: 90000 -> 72000 SL
- - expert crew cost: 310000 -> 250000 SL
- - ace crew cost: 570000 / 1200 -> 480000 RP / 940 GE
- - minimum repair cost: 821 / 585 -> 695 / 489 SL/minute
- - full stock repair cost: 11400 / 11303 -> 9660 / 9449 SL
- - full spaded repair cost: 15406 / 15274 -> 13054 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.33 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.66
- - modification changes:
- - Ammo Wetting, Bomb mortar, Contro-aerea HE-TF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3100
- - SL cost: 7200 -> 6000
- - GE cost: 280 -> 240
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 6200 -> 4500
- - SL cost: 10000 -> 8700
- - GE cost: 400 -> 350
- - Auxiliary Armament Targeting, Fire Division, Palla APHEBC, Perforante APHE, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 2500
- - SL cost: 5800 -> 4900
- - GE cost: 220 -> 195
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 2800
- - SL cost: 6500 -> 5400
- - GE cost: 250 -> 220
- - talisman: 1800 -> 1500 GE
- - Francesco Caracciolo:
- - 390000 -> 380000 RP
- - 1050000 -> 990000 SL
- - crew cost: 300000 -> 280000 SL
- - expert crew cost: 1050000 -> 990000 SL
- - ace crew cost: 890000 / 2200 -> 830000 RP / 2000 GE
- - RP multiplier: 2.14 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - SL cost: 50000 -> 49000
- - GE cost: 620 -> 600
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 20000 -> 19000
- - SL cost: 31000 -> 29000
- - GE cost: 390 -> 360
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement: GE cost: 430 -> 410
- - Improved Rangefinder, Perforante APHE, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: SL cost: 19000 -> 18000
- - talisman: 2400 -> 2300 GE
- - Raimondo Montecuccoli:
- - 89000 -> 61000 RP
- - 300000 -> 230000 SL
- - crew cost: 87000 -> 65000 SL
- - expert crew cost: 300000 -> 230000 SL
- - ace crew cost: 520000 / 1100 -> 440000 RP / 820 GE
- - minimum repair cost: 781 / 545 -> 564 / 414 SL/minute
- - full stock repair cost: 10845 / 10531 -> 7844 / 8004 SL
- - full spaded repair cost: 14656 / 14231 -> 10600 / 10817 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 3.97 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.6
- - modification changes:
- - Ammo Wetting, Bomb mortar, Contro-aerea HE-TF, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3600 -> 2600
- - SL cost: 6200 -> 5000
- - GE cost: 260 -> 220
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 5200 -> 3700
- - SL cost: 8900 -> 7100
- - GE cost: 370 -> 320
- - Auxiliary Armament Targeting, Fire Division, Palla APHEBC, Perforante APHE, Rudder Replacement, Smokescreen:
- - RP cost: 2900 -> 2100
- - SL cost: 5000 -> 4100
- - GE cost: 210 -> 180
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2300
- - SL cost: 5700 -> 4400
- - GE cost: 230 -> 195
- - talisman: 1700 -> 1400 GE
- - Roma:
- - minimum repair cost: 1227 / 1136 -> 1181 / 1094 SL/minute
- - full stock repair cost: 33325 / 37198 -> 32070 / 35797 SL
- - added modifications: Hydroplane (Tier IV)
- - modification changes:
- - Ammo Wetting, Contro-aerea HE-TF, New Pumps:
- - RP cost: 26000 -> 21000
- - SL cost: 41000 -> 33000
- - GE cost: 610 -> 530
- - Anti-Air Armament Targeting:
- - repair cost coefficient: 0.016 -> 0.017
- - GE cost: 380 -> 400
- - Auxiliary Armament Targeting:
- - repair cost coefficient: 0.016 -> 0.017
- - GE cost: 430 -> 450
- - Damage Control Division:
- - repair cost coefficient: 0.043 -> 0.044
- - GE cost: 380 -> 400
- - Dry-Docking:
- - repair cost coefficient: 0.024 -> 0.025
- - GE cost: 380 -> 400
- - Engine Maintenance:
- - repair cost coefficient: 0.021 -> 0.022
- - RP cost: 26000 -> 21000
- - SL cost: 41000 -> 33000
- - GE cost: 610 -> 530
- - Fire Division:
- - repair cost coefficient: 0.043 -> 0.044
- - GE cost: 430 -> 450
- - Improved Rangefinder, Palla APCBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 380 -> 400
- - Palla APHEBC: GE cost: 430 -> 450
- - Rudder Replacement:
- - repair cost coefficient: 0.015 -> 0.016
- - GE cost: 430 -> 450
- - Zara:
- - 175000 -> 125000 RP
- - 490000 -> 360000 SL
- - crew cost: 140000 -> 105000 SL
- - expert crew cost: 490000 -> 360000 SL
- - ace crew cost: 670000 / 1500 -> 620000 RP / 1400 GE
- - minimum repair cost: 903 / 665 -> 863 / 625 SL/minute
- - full stock repair cost: 12531 / 12864 -> 11976 / 12091 SL
- - full spaded repair cost: 16911 / 17361 -> 16162 / 16317 SL
- - RP multiplier: 1.9 -> 1.84
- - modification changes:
- - Ammo Wetting, Contro-aerea HE-TF, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 11000 -> 8600
- - SL cost: 18000 -> 14000
- - GE cost: 390 -> 380
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking:
- - RP cost: 12000 -> 8800
- - SL cost: 19000 -> 14000
- - GE cost: 430 -> 390
- - Auxiliary Armament Targeting, Fire Division, Perforante APHE, Perforante APHEBC, Rudder Replacement, Smokescreen:
- - RP cost: 6500 -> 4900
- - SL cost: 10000 -> 7800
- - GE cost: 230 -> 220
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 7200 -> 5500
- - SL cost: 11000 -> 8800
- - GE cost: 260 -> 240
- - talisman: 2000 -> 1900 GE
- - Colbert:
- - 105000 -> 61000 RP
- - 310000 -> 230000 SL
- - crew cost: 90000 -> 65000 SL
- - expert crew cost: 310000 -> 230000 SL
- - ace crew cost: 570000 / 1200 -> 440000 RP / 820 GE
- - minimum repair cost: 817 / 580 -> 562 / 403 SL/minute
- - full stock repair cost: 11354 / 11775 -> 7812 / 8173 SL
- - full spaded repair cost: 15406 / 15977 -> 10600 / 11090 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 3.97 / 6.0 / 1.0
- - RP multiplier: 1.78 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 6000 -> 3600
- - SL cost: 10000 -> 7000
- - GE cost: 330 -> 270
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA Mle. 1925 HE-TF, OPf Mle. 1927 SAPBC:
- - RP cost: 3700 -> 2200
- - SL cost: 6200 -> 4200
- - GE cost: 210 -> 165
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 5200 -> 3100
- - SL cost: 8700 -> 6000
- - GE cost: 290 -> 230
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 4700 -> 2800
- - SL cost: 7800 -> 5400
- - GE cost: 260 -> 210
- - talisman: 1800 -> 1400 GE
- - Dunkerque:
- - 400000 -> 380000 RP
- - 1080000 -> 990000 SL
- - crew cost: 310000 -> 280000 SL
- - expert crew cost: 1080000 -> 990000 SL
- - ace crew cost: 950000 / 2400 -> 830000 RP / 2000 GE
- - RP multiplier: 2.2 -> 2.08
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps:
- - RP cost: 25000 -> 24000
- - SL cost: 39000 -> 37000
- - GE cost: 600 -> 540
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf Mle. 1935 APCBC, OPfK Mle. 1933 SAPBC:
- - SL cost: 19000 -> 18000
- - GE cost: 290 -> 270
- - Auxiliary Armament Targeting, Fire Division, OEA Mle. 1934 HE-TF, Rudder Replacement:
- - RP cost: 17000 -> 16000
- - SL cost: 27000 -> 25000
- - GE cost: 410 -> 360
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation: GE cost: 360 -> 340
- - talisman: 2600 -> 2300 GE
- - Émile Bertin:
- - 75000 -> 61000 RP
- - 250000 -> 230000 SL
- - crew cost: 72000 -> 65000 SL
- - expert crew cost: 250000 -> 230000 SL
- - ace crew cost: 480000 / 940 -> 440000 RP / 820 GE
- - minimum repair cost: 692 / 477 -> 562 / 403 SL/minute
- - full stock repair cost: 9621 / 9680 -> 7812 / 8173 SL
- - full spaded repair cost: 13054 / 13135 -> 10600 / 11090 SL
- - SL multiplier: 4.33 / 6.0 / 1.0 -> 3.97 / 6.0 / 1.0
- - RP multiplier: 1.66 -> 1.6
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 4300 -> 3600
- - SL cost: 8300 -> 7000
- - GE cost: 300 -> 280
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA Mle. 1925 HE-TF, OPf RC Mle. 1937 SAPBC:
- - RP cost: 2700 -> 2200
- - SL cost: 5200 -> 4200
- - GE cost: 190 -> 170
- - Auxiliary Armament Targeting, Fire Division, OPf Mle. 1943 APCBC, Rudder Replacement, Smokescreen:
- - RP cost: 3000 -> 2500
- - SL cost: 5800 -> 4800
- - GE cost: 210 -> 195
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3300 -> 2800
- - SL cost: 6400 -> 5400
- - GE cost: 230 -> 220
- - talisman: 1500 -> 1400 GE
- - Guichen (D 607):
- - 14000 -> 11000 RP
- - 32000 -> 22000 SL
- - crew cost: 9200 -> 6300 SL
- - expert crew cost: 32000 -> 22000 SL
- - ace crew cost: 250000 / 320 -> 220000 RP / 250 GE
- - minimum repair cost: 252 / 251 -> 206 / 201 SL/minute
- - full stock repair cost: 1904 / 2959 -> 1558 / 2370 SL
- - full spaded repair cost: 2429 / 3774 -> 1987 / 3023 SL
- - SL multiplier: 1.65 / 3.8 / 1.0 -> 1.38 / 3.18 / 1.0
- - RP multiplier: 1.3 -> 1.24
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 1500 -> 1100
- - SL cost: 2200 -> 1500
- - GE cost: 220 -> 190
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen, Spr.Gr. L/4.4 Zt.Z. HE-TF:
- - RP cost: 620 -> 470
- - SL cost: 890 -> 620
- - GE cost: 90 -> 80
- - Damage Control Division, Dry-Docking:
- - RP cost: 1400 -> 1000
- - SL cost: 2000 -> 1300
- - GE cost: 210 -> 175
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 690 -> 520
- - SL cost: 1000 -> 690
- - GE cost: 100 -> 90
- - talisman: 860 -> 750 GE
- - Jeanne d'Arc:
- - 36000 -> 18000 RP
- - 115000 -> 47000 SL
- - crew cost: 33000 -> 13000 SL
- - expert crew cost: 115000 -> 47000 SL
- - ace crew cost: 360000 / 590 -> 280000 RP / 400 GE
- - minimum repair cost: 359 / 244 -> 281 / 260 SL/minute
- - full stock repair cost: 4667 / 5288 -> 3658 / 5650 SL
- - full spaded repair cost: 6053 / 6859 -> 4745 / 7329 SL
- - SL multiplier: 3.43 / 6.0 / 1.0 -> 2.71 / 6.0 / 1.0
- - RP multiplier: 1.48 -> 1.36
- - modification changes:
- - Ammo Wetting, Engine Maintenance, New Pumps:
- - RP cost: 3900 -> 2100
- - SL cost: 8500 -> 3400
- - GE cost: 360 -> 290
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA HE-BF, OEA Mle. 1925 HE-TF:
- - RP cost: 1400 -> 790
- - SL cost: 3000 -> 1300
- - GE cost: 130 -> 110
- - Auxiliary Armament Targeting, Fire Division, OPf SAPBC, Rudder Replacement, Smokescreen:
- - RP cost: 1600 -> 890
- - SL cost: 3500 -> 1500
- - GE cost: 150 -> 120
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 1800 -> 990
- - SL cost: 3900 -> 1600
- - GE cost: 165 -> 135
- - talisman: 1200 -> 980 GE
- - La Galissonnière:
- - 89000 -> 75000 RP
- - 300000 -> 250000 SL
- - crew cost: 87000 -> 72000 SL
- - expert crew cost: 300000 -> 250000 SL
- - ace crew cost: 520000 / 1100 -> 480000 RP / 940 GE
- - minimum repair cost: 778 / 542 -> 698 / 487 SL/minute
- - full stock repair cost: 10806 / 10488 -> 9697 / 9411 SL
- - full spaded repair cost: 14663 / 14231 -> 13157 / 12769 SL
- - SL multiplier: 4.5 / 6.0 / 1.0 -> 4.29 / 6.0 / 1.0
- - RP multiplier: 1.72 -> 1.66
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 5100 -> 4300
- - SL cost: 8800 -> 8300
- - GE cost: 330 -> 300
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA Mle. 1925 HE-TF, OPf RC Mle. 1937 SAPBC:
- - RP cost: 3100 -> 2700
- - SL cost: 5300 -> 5200
- - GE cost: 200 -> 190
- - Auxiliary Armament Targeting, Fire Division, OPf Mle. 1943 APCBC, Rudder Replacement, Smokescreen:
- - RP cost: 3500 -> 3000
- - SL cost: 6000 -> 5800
- - GE cost: 230 -> 210
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 3900 -> 3300
- - SL cost: 6700 -> 6400
- - GE cost: 250 -> 230
- - talisman: 1700 -> 1500 GE
- - Primauguet:
- - 48000 -> 26000 RP
- - 180000 -> 76000 SL
- - crew cost: 52000 -> 22000 SL
- - expert crew cost: 180000 -> 76000 SL
- - ace crew cost: 390000 / 700 -> 320000 RP / 500 GE
- - minimum repair cost: 438 / 326 -> 308 / 288 SL/minute
- - full stock repair cost: 5826 / 6840 -> 4096 / 6028 SL
- - full spaded repair cost: 7905 / 9281 -> 5558 / 8179 SL
- - SL multiplier: 3.62 / 6.0 / 1.0 -> 2.92 / 6.0 / 1.0
- - RP multiplier: 1.54 -> 1.42
- - modification changes:
- - Ammo Wetting, Engine Maintenance, Hydroplane, New Pumps, Torpedo Mode:
- - RP cost: 3000 -> 1700
- - SL cost: 6400 -> 3200
- - GE cost: 260 -> 210
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OEA HE-BF, OEA Mle. 1925 HE-TF:
- - RP cost: 1800 -> 1100
- - SL cost: 3900 -> 2100
- - GE cost: 160 -> 135
- - Auxiliary Armament Targeting, Fire Division, OPf SAPBC, Rudder Replacement, Smokescreen:
- - RP cost: 2000 -> 1200
- - SL cost: 4300 -> 2200
- - GE cost: 175 -> 150
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 2300 -> 1300
- - SL cost: 4900 -> 2400
- - GE cost: 200 -> 160
- - talisman: 1300 -> 1100 GE
- - Vauquelin (X 53):
- - 11000 -> 9200 RP
- - 22000 -> 16000 SL
- - crew cost: 6300 -> 4500 SL
- - expert crew cost: 22000 -> 16000 SL
- - ace crew cost: 220000 / 250 -> 190000 RP / 180 GE
- - minimum repair cost: 202 / 197 -> 158 / 159 SL/minute
- - full stock repair cost: 1524 / 2319 -> 1192 / 1868 SL
- - full spaded repair cost: 1987 / 3023 -> 1555 / 2435 SL
- - SL multiplier: 1.38 / 3.18 / 1.0 -> 1.05 / 2.42 / 1.0
- - RP multiplier: 1.24 -> 1.18
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, Mines, New Pumps, Torpedo Mode:
- - RP cost: 560 -> 460
- - SL cost: 740 -> 520
- - GE cost: 125 -> 110
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, Improved Rangefinder, OPfA Mle. 1924 SAPBC, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 520 -> 420
- - SL cost: 690 -> 470
- - GE cost: 115 -> 100
- - Auxiliary Armament Targeting, Fire Division, Rudder Replacement, Smokescreen:
- - RP cost: 580 -> 470
- - SL cost: 770 -> 530
- - GE cost: 130 -> 115
- - talisman: 750 -> 640 GE
- - Vautour (X 71):
- - 9200 -> 7900 RP
- - 16000 -> 10000 SL
- - crew cost: 4500 -> 3000 SL
- - expert crew cost: 16000 -> 10000 SL
- - ace crew cost: 190000 / 180 -> 160000 RP / 125 GE
- - minimum repair cost: 158 / 159 -> 115 SL/minute
- - full stock repair cost: 1192 / 1868 -> 869 / 1351 SL
- - full spaded repair cost: 1555 / 2435 -> 1133 / 1762 SL
- - SL multiplier: 1.05 / 2.42 / 1.0 -> 0.81 / 1.86 / 1.0
- - RP multiplier: 1.18 -> 1.12
- - modification changes:
- - Ammo Wetting, Bomb mortar, Engine Maintenance, New Pumps, Torpedo Mode:
- - RP cost: 550 -> 450
- - SL cost: 620 -> 440
- - GE cost: 140 -> 120
- - Anti-Air Armament Targeting, Damage Control Division, Dry-Docking, OPf Mle. 1917 SAP, OPfA Mle. 1924 SAPBC:
- - RP cost: 340 -> 280
- - SL cost: 380 -> 270
- - GE cost: 85 -> 75
- - Auxiliary Armament Targeting, Fire Division, OEA Mle. 1917 HE-TF, Rudder Replacement, Smokescreen:
- - RP cost: 380 -> 310
- - SL cost: 430 -> 300
- - GE cost: 95 -> 85
- - Improved Rangefinder, Primary Armament Targeting, Propeller Replacement, Shrapnel Protection, Ventilation:
- - RP cost: 420 -> 350
- - SL cost: 470 -> 340
- - GE cost: 105 -> 95
- - talisman: 640 -> 530 GE
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement