  1. ⁃ activate all levers (8)
  2. ⁃ Fuel panel: Reactor operation mode dial: nominal
  3. ⁃ Fuel panel: Insert in Core (fuel block)
  4. ⁃ Pressurisation: heaters ON
  5. ⁃ Pressurisation: check heating power HIGH
  6. ⁃ Coolant system: dial ordered MEDIUM
  7. ⁃ Coolant system - circulation pumps: START all the pumps you currently have
  8. ⁃ Coolant system - all freight pumps: LOAD
  9. [if restarting, also set core outer vessel dial to LOAD]
  10. ⁃ Condenser panel - coolant flow speed - ordered dial to FAST, then START condenser
  11. ⁃ [first time only] While awaiting pressurisation, iPad 75k loan 4 weeks
  12. ⁃ [first time only] While awaiting pressurisation: iPad buy AO control rods, pressure, maintenance
  13. ⁃ Pressurisation: await pressure & temperature green
  14. ⁃ Pressurisation: heating power dial LOW
  15. [if restarting, check water level is above control rods before proceeding]
  16. ⁃ Coolant system - all freight pumps: OFF
  17. [if restarting, also set core outer vessel dial to OFF]
  18. ⁃ Control rods - keypad: 98 SET
  19. [will be a lower number in an upgraded plant & as core fuel reduces]
  20. While awaiting critical reaction: Energy generation - Resistor banks ON, Compensator ON, Turbine bypass 33%
  21. [if restarting an upgraded plant, increase initial bypass to suit]
  22. ⁃ Await critical reaction
  23. ⁃ Steam generators: START all the generators you currently have
  24. ⁃ Steam generator - coolant flow speed: dial MEDIUM [FAST if restarting upgraded plant]
  25. ⁃ Pressurisation: heaters OFF
  26. [if restarting, breaker should be OPEN]
  27. [if restarting an upgraded plant, monitor generated energy closely and adjust turbine bypass to avoid overloading resistors]
  28. ⁃ Energy generation - await 150kw [if restarting an upgraded plant, it will require more energy]
  29. ⁃ Internal or external supply: STOP/OFF
  30. ⁃ Await reactor temp 250deg
  31. [will be higher in an upgraded plant, needs to be near green band]
  32. ⁃ Ipad AO turn on
  33. ⁃ iPad AO activate control rods & pressure functions
  34. ⁃ iPad request start operation
  35. ⁃ Await operation start time
  36. ⁃ Synchroscope: raise and lower speed (blue panel) to center dot
  37. ⁃ Circuit breaker CLOSE when holding synchronised (sync is shown as two green dots on synchroscope)
  38. ⁃ Synchroscope: increase/decrease voltage (green panel) to match grid
  39. ⁃ Turbine bypass 0 when feeding grid
  40. [if restarting an upgraded plant, monitor generated energy closely and adjust turbine bypass to avoid over-revving turbine]