  4. 1) __________ is when the activities in the stage must stop because there is no place to deposit the item just completed
  5. A. Buffering
  6. B. Blocking
  7. C. Starving
  8. D. Pacing
  9. 2) According to your text, the most common process metric is
  10. A. productivity
  11. B. efficiency
  12. C. utilization
  13. D. throughput time
  14. 3) Declining product prices
  15. A. increase the manufacturing costs
  16. B. lower the break-point
  17. C. result in lower manufacturing costs
  18. D. increase the break-even point
  19. 4) The type of processing structure that is used for producing discrete products at a controlled rate is
  20. A. job shop
  21. B. batch
  22. C. assembly line
  23. D. project
  24. 5) The best process flow structure to use for making automobiles is
  25. A. job shop
  26. B. batch shop
  27. C. group technology cell
  28. D. assembly line
  29. 6) The break-even analysis is a standard approach to determine alternative processes A break-even analysis chart usually present alternative __________ and __________ based upon the units produced or sold.
  30. A. demand, supply
  31. B. profits, losses
  32. C. equipment, materials
  33. D. variable, fixed costs
  34. 7) A statistical term that refers to the philosophy and methods companies use to eliminate defects in their products and processes by establishing a quality goal of no more than four defects out of every million units is __________.
  35. A. ISO 9000
  36. B. Six Sigma
  37. C. Total Quality Management
  38. D. SERVQUAL
  39. 8) Independent demand is
  40. A. inventory where demand comes from independent suppliers
  41. B. inventory that is independent of any known rules of demand and supply
  42. C. demand that is related to the demand for another item
  43. D. demand determined by the marketplace that requires forecasting
  44. 9) An inventory system designed to ensure that an item will be available on an ongoing basis throughout the year is known as
  45. A. Optional Replenishment System
  46. B. Inventory Accuracy and Cycle Counting
  47. C. ABC Inventory Planning
  48. D. Multiperiod Inventory Systems
  49. 10) A/an __________ approach actually schedules in detail each resource using the setup and runtime required for each order.
  50. A. infinite loading
  51. B. finite loading
  52. C. forward scheduling
  53. D. backward scheduling
  54. 11) What is the net result of reducing the duration of a task (crashing) not on the critical path?
  55. A. Decreased project overhead costs
  56. B. Reduced likelihood of liquidated damages for late delivery
  57. C. Increased slack time associated with the task
  58. D. Reduction in the project duration
  59. 12) The idea of the value density calculation is:
  60. A. finding a carrier that can handle the weight
  61. B. matching the weight of the product with an appropriate carrier
  62. C. deciding where items should be stocked geographically and how they should be shipped
  63. D. finding the minimum cost carrier
  64. 13) When designing a supply chain:
  65. A. cost vs customer service must be considered
  66. B. quality vs cost must be considered
  67. C. lead times vs payment terms must be considered
  68. D. customer service vs product customization must be considered
  69. 14) According to Hau Lee, which of the following types of products need to be delivered with efficient supply-chains?
  70. A. Custom products
  71. B. Innovative products
  72. C. Grocery products
  73. D. High technology products
  74. 15) Which of the following product promotional activities would probably help make the supply chain more efficient?
  75. A. Price promotions that expire on a specific date
  76. B. An “everyday” low price strategy where prices are not dependent on quantity delivered with a specific order
  77. C. Special packaging for a specific event that occurs one time each year
  78. D. A 2-for-1 price promotion
  79. 16) The best operating level is:
  80. A. the maximum point of the cost curve
  81. B. the level of capacity for which average unit cost is minimized
  82. C. maximum capacity
  83. D. the level of capacity for which total cost is minimized
  84. 17) Capacity utilization rate can be computed as:
  85. A. Capacity used – best operating level
  86. B. Capacity used x best operating level
  87. C. Capacity used / best operating level
  88. D. Capacity used + best operating level
  89. 18) The objective of __________ is to provide an approach for determining the overall capacity level of capital-intensive resources that best supports the company’s long-range competitive strategy.
  90. A. workforce management
  91. B. management supervision
  92. C. operations management
  93. D. strategic capacity planning
  94. 19) Lean production systems typically require
  95. A. delivery of large lots at frequent intervals
  96. B. buyer inspection of goods and materials
  97. C. multiple sources from which to purchase
  98. D. low inventory levels throughout production
  99. 20) Given that the previous forecast of 65 turned out to be four units less than the actual demand; the next forecast is 66. What would be the value of alpha if the simple exponential smoothing forecast method is being used?
  100. A. 002
  101. B. 04
  102. C. 004
  103. D. 025
  104. 21) Linear regression sales forecasting techniques:
  105. A. work best when future sales are randomly distributed
  106. B. will not work for declining sales
  107. C. work best when sales are increasi
  108. 22) What should the value of alpha be in an exponential smoothing forecast to be very responsive to recent demand?
  109. A. Large
  110. B. Small
  111. C. Negative
  112. D. Zero
  113. 23) Which of the following statements are true about time-series forecasting?
  114. A. Time series analysis employs empirical data to forecast future events
  115. B. Time series analysis is used to understand the system underlying and surrounding the item being forecast
  116. C. Under time-series methods, demand is divided into the time-based components such as daily, weekly, etc
  117. D. Time series methods are useful for long-range forecasts when the demand pattern is erratic
  118. 24) One option for altering the pattern of demand is:
  119. A. hiring employees
  120. B. using overtime
  121. C. carrying inventory
  122. D. pricing
  123. 25) Aggregate planners balance:
  124. A. demand and costs
  125. B. demand and inventories
  126. C. demand and capacity
  127. D. supply and inventories
  128. 26) Which of the following accurately describes a chase strategy?
  129. A. The firm produces the same amount each day over the planning period and deals with the variations in demand through the use of inventory or overtime
  130. B. The firm produces at the same level for several months, and then adjusts production to another level and produces at that level for several more months
  131. C. The firm matches its production rate to meet demand by varying the size of its workforce as demand varies
  132. D. The firm produces the same amount each day within the planning period and deals with variations in demand through the use of outsourcing partners
  133. 27) Which of the following reflects net material requirements:
  134. A. gross requirements – scheduled receipts
  135. B. gross requirements – projected available balance + scheduled receipts
  136. C. gross requirements – projected available balance – scheduled receipts
  137. D. gross requirements – scheduled releases
  138. 28) Which MRP system input element specifies how many and when the firm plans to build each end item?
  139. A. Inventory records file
  140. B. Bills of material
  141. C. Master production schedule
  142. D. Capacity planning
  143. 29) Which of the following is true about MRP systems?
  144. A. Based on independent demand
  145. B. Lot sizing is based on Economic Order Quantity
  146. C. Demand pattern is random
  147. D. Objective is to meet manufacturing needs
  148. 30) A Material Requirements Planning (MRP) is most valuable in industries where a number of products are made in batches using the same productive equipment and with companies involving:
  149. A. fabrication
  150. B. low number of units annually
  151. C. complex, expensive products
  152. D. assembly operations
  153.  
  154.  
  155. Download: http://solutionzip.com/downloads/__________-is-when-the-activities-in-the-stage-must-stop-because-there-is-no-place-to-deposit-the-item-just-completed/
Advertisement
Add Comment
Please, Sign In to add comment