- Your company’s own geotechnical report suggests the
- presence of uncontrolled fill and a high
- concentration of sulfates in the soft clay silts. Upon
- examining the proposal in detail, it becomes apparent
- to you that the in-house foundation design may not
- be adequate and warrants further consideration.
- • Upon examining the proposal in detail, it becomes
- apparent to you that the in-house foundation design
- may not be adequate and warrants further
- consideration.
- Task 1.
- • With reference to the proposed foundation shown in
- the brief (Figure 2 & 3), identify the inadequacies that
- may be a source of concern to the structural
- robustness of the foundations for the 6 storey building.
- • Using clearly and well annotated drawings suggest
- suitable solutions to enhance the original foundations.
- Intro
- Upon running a detailed analysis of the proposed In house Foundation design a few Inadequacies have been identified that could potentially compromise the structural integrity of the building. Our reports suggest a high concentration of sulphates in the soft clay slits and the presence of uncontrolled fill. It appears that these potential risks for the buildings structural soundness have not been addressed or picked up in the current building design and nothing has been done to mitigate these risks. Below I will highlight specific areas of concern and identity remedies for these issues.
- .
- First let us list the type of foundations for the building, the building has Ground beams at a depth of 400mm and are 600mm wide
- Your company’s own geotechnical report suggests the
- presence of uncontrolled fill and a high
- concentration of sulfates in the soft clay silts. Upon
- examining the proposal in detail, it becomes apparent
- to you that the in-house foundation design may not
- be adequate and warrants further consideration.
- • Upon examining the proposal in detail, it becomes
- apparent to you that the in-house foundation design
- may not be adequate and warrants further
- consideration.
- Task 1.
- • With reference to the proposed foundation shown in
- the brief (Figure 2 & 3), identify the inadequacies that
- may be a source of concern to the structural
- robustness of the foundations for the 6 storey building.
- • Using clearly and well annotated drawings suggest
- suitable solutions to enhance the original foundations.
- Intro
- Upon running a detailed analysis of the proposed In house Foundation design a few Inadequacies have been identified that could potentially compromise the structural integrity of the building. Our reports suggest a high concentration of sulphates in the soft clay slits and the presence of uncontrolled fill. It appears that these potential risks for the buildings structural soundness have not been addressed or picked up in the current building design and nothing has been done to mitigate these risks. Below I will highlight specific areas of concern and identity remedies for these issues.
- .
- First let us list the type of foundations for the building, the building has Ground beams at a depth of 400mm and are 600mm wide