  1. Your company’s own geotechnical report suggests the
  2. presence of uncontrolled fill and a high
  3. concentration of sulfates in the soft clay silts. Upon
  4. examining the proposal in detail, it becomes apparent
  5. to you that the in-house foundation design may not
  6. be adequate and warrants further consideration.
  7. • Upon examining the proposal in detail, it becomes
  8. apparent to you that the in-house foundation design
  9. may not be adequate and warrants further
  10. consideration.
  11. Task 1.
  12. • With reference to the proposed foundation shown in
  13. the brief (Figure 2 & 3), identify the inadequacies that
  14. may be a source of concern to the structural
  15. robustness of the foundations for the 6 storey building.
  16. • Using clearly and well annotated drawings suggest
  17. suitable solutions to enhance the original foundations.
  18. Intro
  19. Upon running a detailed analysis of the proposed In house Foundation design a few Inadequacies have been identified that could potentially compromise the structural integrity of the building. Our reports suggest a high concentration of sulphates in the soft clay slits and the presence of uncontrolled fill. It appears that these potential risks for the buildings structural soundness have not been addressed or picked up in the current building design and nothing has been done to mitigate these risks. Below I will highlight specific areas of concern and identity remedies for these issues.
  20.  
  21. .
  22.  
  23. First let us list the type of foundations for the building, the building has Ground beams at a depth of 400mm and are 600mm wide
  24. Your company’s own geotechnical report suggests the
  25. presence of uncontrolled fill and a high
  26. concentration of sulfates in the soft clay silts. Upon
  27. examining the proposal in detail, it becomes apparent
  28. to you that the in-house foundation design may not
  29. be adequate and warrants further consideration.
  30. • Upon examining the proposal in detail, it becomes
  31. apparent to you that the in-house foundation design
  32. may not be adequate and warrants further
  33. consideration.
  34. Task 1.
  35. • With reference to the proposed foundation shown in
  36. the brief (Figure 2 & 3), identify the inadequacies that
  37. may be a source of concern to the structural
  38. robustness of the foundations for the 6 storey building.
  39. • Using clearly and well annotated drawings suggest
  40. suitable solutions to enhance the original foundations.
  41. Intro
  42. Upon running a detailed analysis of the proposed In house Foundation design a few Inadequacies have been identified that could potentially compromise the structural integrity of the building. Our reports suggest a high concentration of sulphates in the soft clay slits and the presence of uncontrolled fill. It appears that these potential risks for the buildings structural soundness have not been addressed or picked up in the current building design and nothing has been done to mitigate these risks. Below I will highlight specific areas of concern and identity remedies for these issues.