Advertisement
Guest User

Untitled

a guest
Feb 17th, 2019
201
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 32.10 KB | None | 0 0
  1.  
  2. ----------------------------- SERVER SET UP ---------------------------------
  3.  
  4. [2019-02-17 14:20:57] [Output] : ★ Namira Carter sets down her equipment as she then takes
  5. [2019-02-17 14:21:01] [Output] : ★ out the PC tower and monitor placing them on the desk. ((Namira Carter))
  6. [2019-02-17 14:21:07] [Output] : ★ Namira Carter connects them both up using an HDMI cable as she then
  7. [2019-02-17 14:21:13] [Output] : ★ slides out the NVR from its box, checking the cables that come with it. ((Namira Carter))
  8. [2019-02-17 14:21:20] [Output] : ★ Namira Carter connects the NVR up to the PC tower using the correct wire.
  9. [2019-02-17 14:21:24] [Output] : ★ Namira Carter takes out a 3inch stanley knife as she uses it to cut the tape
  10. [2019-02-17 14:21:27] [Output] : ★ of the USP System box, opening it up. ((Namira Carter))
  11. [2019-02-17 14:21:31] [Output] : ★ Namira Carter grasps the USP System as she takes it out of the box
  12. [2019-02-17 14:21:34] [Output] : ★ placing it on the floor by the desk. ((Namira Carter))
  13. [2019-02-17 14:21:38] [Output] : ★ Namira Carter unravels its power lead as she plugs it into an
  14. [2019-02-17 14:21:43] [Output] : ★ extension cord behind the desk. ((Namira Carter))
  15. [2019-02-17 14:21:46] [Output] : ★ Namira Carter takes out the connection cables from the USP box as
  16. [2019-02-17 14:21:50] [Output] : ★ she connects the monitor, tower and NVR to it. ((Namira Carter))
  17. [2019-02-17 14:21:54] [Output] : ★ Namira Carter plugs in the AC adapter of the NVR into the extension cord.
  18. [2019-02-17 14:21:57] [Output] : ★ Namira Carter reaches for the router box, as she uses the knife to unseal it.
  19. [2019-02-17 14:22:04] [Output] : ★ Namira Carter takes out the router as she places it next to the monitor
  20. [2019-02-17 14:22:08] [Output] : ★ using the ethernet cable from the box to connect the router ((Namira Carter))
  21. [2019-02-17 14:22:16] [Output] : ★ up to the IPS modem on the wall, provided by the ISP. ((Namira Carter))
  22. [2019-02-17 14:22:21] [Input] :
  23. [2019-02-17 14:22:23] [Output] : ★ Namira Carter then unpacks a green ethernet cable as she pushes the
  24. [2019-02-17 14:22:32] [Output] : ★ end into the back of the router and the other end into the back of the tower. ((Namira Carter))
  25. [2019-02-17 14:22:38] [Output] : ★ Namira Carter leans forward as she takes hold of the POE switch box
  26. [2019-02-17 14:22:41] [Output] : ★ unpacking it as she sets it down by the router. ((Namira Carter))
  27. [2019-02-17 14:22:46] [Output] : ★ Namira Carter connects the POE switch to the power outlet
  28. [2019-02-17 14:22:49] [Output] : ★ on the wall as she then connects it to the router using ((Namira Carter))
  29. [2019-02-17 14:22:53] [Output] : ★ another ethernet cable into the LAN port. ((Namira Carter))
  30. [2019-02-17 14:22:57] [Output] : ★ Namira Carter switches the power on as she boots up the PC.
  31. [2019-02-17 14:23:00] [Output] : ★ Namira Carter logs into the PC as she navigates to the control panal
  32. [2019-02-17 14:23:06] [Output] : ★ creating a new administrator log in with a 26 alphanumeric password. ((Namira Carter))
  33. [2019-02-17 14:23:12] [Output] : ★ Namira Carter closes the control panal as she then opens up an internet
  34. [2019-02-17 14:23:15] [Output] : ★ browser, logging into the router as she sets a static IP. ((Namira Carter))
  35. [2019-02-17 14:23:21] [Output] : ★ Namira Carter installs an SSL VPN in order to connect to the Sparta Server
  36. [2019-02-17 14:23:24] [Output] : ★ as she then logs into the NVR software, ensuring it completes ((Namira Carter))
  37. [2019-02-17 14:23:27] [Output] : ★ any updates. ((Namira Carter))
  38. [2019-02-17 14:23:32] [Output] : ★ Namira Carter waits for the installs to complete before turning the PC off
  39. [2019-02-17 14:23:39] [Output] : ★ and walking over to the buildings mains box as she flicks the power off. ((Namira Carter))
  40.  
  41. ------------------------------ CCTV INSTALLATION --------------------------------------
  42.  
  43. [2019-02-17 14:24:07] [Output] : ★ Namira Carter reaches for the IP Camera boxes as she unseals each
  44. [2019-02-17 14:24:11] [Output] : ★ one with her 3 inch stanley knife, using it to cut across ((Namira Carter))
  45. [2019-02-17 14:24:14] [Output] : ★ the top of each box and unseal the tape holding them. ((Namira Carter))
  46. [2019-02-17 14:24:18] [Output] : ★ Namira Carter takes out the first IP Camera as she checks the mount
  47. [2019-02-17 14:24:21] [Output] : ★ in order to see how many holes she needs to drill into ((Namira Carter))
  48. [2019-02-17 14:24:24] [Output] : ★ the wall. ((Namira Carter))
  49. [2019-02-17 14:24:28] [Output] : ★ Namira Carter kneels down as she opens up her drill kit, switching out
  50. [2019-02-17 14:24:32] [Output] : ★ the drill head for a smaller size. ((Namira Carter))
  51. [2019-02-17 14:24:35] [Output] : ★ Namira Carter tests the drill runs smoothly by lightly holding the trigger.
  52. [2019-02-17 14:24:38] [Output] : ★ Namira Carter stands up with the drill and camera in her hand as she then
  53. [2019-02-17 14:24:41] [Output] : ★ walks over to the wall. ((Namira Carter))
  54. [2019-02-17 14:24:45] [Output] : ★ Namira Carter sets the camera down as she then uses her left hand on the wall
  55. [2019-02-17 14:24:48] [Output] : ★ whilst the other holds the drill steadily as she drills out four ((Namira Carter))
  56. [2019-02-17 14:24:52] [Output] : ★ holes in the wall in a square shape with a couple of inches apart. ((Namira Carter))
  57. [2019-02-17 14:25:00] [Output] : ★ Namira Carter checks the depth of the holes are correct as she then sets the
  58. [2019-02-17 14:25:03] [Output] : ★ drill down, picking up the IP camera. ((Namira Carter))
  59. [2019-02-17 14:25:07] [Output] : ★ Namira Carter holds the IP Camera in place as she checks the alignment of it.
  60. [2019-02-17 14:25:13] [Output] : ★ setting it back down afterwards. ((Namira Carter))
  61. [2019-02-17 14:25:21] [Output] : ★ Namira Carter takes hold of the electric screwdriver as she switches the head to a small crosshead.
  62. [2019-02-17 14:25:28] [Output] : ★ Namira Carter takes hold of the camera once more as she holds it up against
  63. [2019-02-17 14:25:31] [Output] : ★ the wall, lining it up with the holes as she then attaches ((Namira Carter))
  64. [2019-02-17 14:25:37] [Output] : ★ the screwdriver to the first screw, pressing the button on the ((Namira Carter))
  65. [2019-02-17 14:25:40] [Output] : ★ screwdriver in order for the motor to start. ((Namira Carter))
  66. [2019-02-17 14:25:48] [Output] : ★ Namira Carter screws in the first screw, checking its in firmly before
  67. [2019-02-17 14:25:52] [Output] : ★ screwing the other three screws into place. ((Namira Carter))
  68. [2019-02-17 14:25:57] [Output] : ★ Namira Carter gently pulls on the camera to ensure its properly in place
  69. [2019-02-17 14:26:00] [Output] : ★ as she then sets the screwdriver down. ((Namira Carter))
  70. [2019-02-17 14:26:06] [Output] : ★ Namira Carter unpacks an ethernet cable as she plugs it into the camera.
  71. [2019-02-17 14:26:11] [Output] : ★ Namira Carter picks up some wire tracking equipment as she then peels back
  72. [2019-02-17 14:26:15] [Output] : ★ the adhesive on it, placing it firmly against the wall as she ((Namira Carter))
  73. [2019-02-17 14:26:21] [Output] : ★ waits for the adhesive to take hold. ((Namira Carter))
  74. [2019-02-17 14:26:24] [Output] : ★ Namira Carter then takes hold of the ethernet cable pushing it through the
  75. [2019-02-17 14:26:27] [Output] : ★ wire tracking as she then goes along the wall, still ensuring the ((Namira Carter))
  76. [2019-02-17 14:26:30] [Output] : ★ cable is in the tracking before plugging it into the POE switch. ((Namira Carter))
  77. [2019-02-17 14:26:33] [Output] : ★ Namira Carter walks back over to the other IP cameras as she then takes hold
  78. [2019-02-17 14:26:36] [Output] : ★ of the drill. ((Namira Carter))
  79. [2019-02-17 14:26:39] [Output] : ★ Namira Carter grasps onto the ladder as she leans it against the wall,
  80. [2019-02-17 14:26:45] [Output] : ★ climbing up it as she then tries to balance herself whilst ((Namira Carter))
  81. [2019-02-17 14:26:49] [Output] : ★ leaning forward, the drill lined on the wall as she drills ((Namira Carter))
  82. [2019-02-17 14:26:53] [Output] : ★ four holes into it, each equal depth for the camera's screws. ((Namira Carter))
  83. [2019-02-17 14:26:59] [Output] : ★ Namira Carter removes any dust from the holes to clear them as she then climbs back down.
  84. [2019-02-17 14:27:06] [Output] : ★ Namira Carter takes hold of an IP camera with the electric screwdriver as she goes back
  85. [2019-02-17 14:27:11] [Output] : ★ up the ladder, holding the camera mount over the four holes as she then ((Namira Carter))
  86. [2019-02-17 14:27:14] [Output] : ★ uses the electric screwdriver to screw the four screws into place. ((Namira Carter))
  87. [2019-02-17 14:27:20] [Output] : ★ Namira Carter checks that each screw can not move any further into the wall as she
  88. [2019-02-17 14:27:23] [Output] : ★ then plugs in an ethernet cable into the camera. ((Namira Carter))
  89. [2019-02-17 14:27:28] [Output] : ★ Namira Carter climbs down the ladder as she sets the screwdriver down, picking
  90. [2019-02-17 14:27:32] [Output] : ★ up some more wire tracking. ((Namira Carter))
  91. [2019-02-17 14:27:36] [Output] : ★ Namira Carter sets the wire tracking against the wall, lining it up properly
  92. [2019-02-17 14:27:39] [Output] : ★ as she then peels off the adhesive, setting the tracking up ((Namira Carter))
  93. [2019-02-17 14:27:43] [Output] : ★ in order for it to properly set on the wall. ((Namira Carter))
  94. [2019-02-17 14:27:47] [Output] : ★ Namira Carter gently pulls the tracking to ensure the adhesive is set properly
  95. [2019-02-17 14:27:51] [Output] : ★ before taking hold of the dangling ethernet cable, putting it through ((Namira Carter))
  96. [2019-02-17 14:27:56] [Output] : ★ the wire tracking as she then plugs it into the POE switch. ((Namira Carter))
  97. [2019-02-17 14:28:01] [Output] : ★ Namira Carter picks up another POE box as she walks over to another
  98. [2019-02-17 14:28:08] [Output] : ★ area of the IMAX theatre, setting the POE switch down ((Namira Carter))
  99. [2019-02-17 14:28:12] [Output] : ★ as she plugs the ethernet cable into the back of it ((Namira Carter))
  100. [2019-02-17 14:28:15] [Output] : ★ the other end into an ethernet port in the wall. ((Namira Carter))
  101. [2019-02-17 14:28:28] [Output] : ★ Namira Carter unravels the power cable for the POE as she then sighs slightly
  102. [2019-02-17 14:28:40] [Output] : ★ crouching down as she picks up the drill. ((Namira Carter))
  103. [2019-02-17 14:28:51] [Output] : ★ cleaning the head from any plaster dust that may be ((Namira Carter))
  104. [2019-02-17 14:28:55] [Output] : ★ caught up. ((Namira Carter))
  105. [2019-02-17 14:29:01] [Output] : ★ Namira Carter walks back to the ladder as she lifts it carefully, moving it to the front
  106. [2019-02-17 14:29:04] [Output] : ★ doors as she sets it down. ((Namira Carter))
  107. [2019-02-17 14:29:11] [Output] : ★ Namira Carter climbs up it half way as she drills out another four holes, equal length apart.
  108. [2019-02-17 14:29:18] [Output] : ★ Namira Carter climbs back down the ladder as she then sets the drill down picking up
  109. [2019-02-17 14:29:21] [Output] : ★ another IP camera. ((Namira Carter))
  110. [2019-02-17 14:29:25] [Output] : ★ Namira Carter steps up on the ladder as she holds the camera in place, tighting the
  111. [2019-02-17 14:29:28] [Output] : ★ screws on the mount with the electric screwdriver in order to ((Namira Carter))
  112. [2019-02-17 14:29:31] [Output] : ★ fix the camera onto the wall. ((Namira Carter))
  113. [2019-02-17 14:29:39] [Output] : ★ Namira Carter adjusts the head of the camera so that it has full view of the area.
  114. [2019-02-17 14:29:43] [Output] : ★ Namira Carter steps off the ladder as she sets the equipment down, taking hold
  115. [2019-02-17 14:29:48] [Output] : ★ of a yellow ethernet cable as she climbs up the ladder, plugging it into the camera. ((Namira Carter))
  116. [2019-02-17 14:29:56] [Output] : ★ Namira Carter takes hold of the other end of the ethernet cable as she then ensures the
  117. [2019-02-17 14:29:59] [Output] : ★ cable is in the wire tracking that is on the wall. ((Namira Carter))
  118. [2019-02-17 14:30:03] [Output] : ★ Namira Carter plugs the ethernet cable into the POE switch as she then takes hold of
  119. [2019-02-17 14:30:06] [Output] : ★ the drill once more. ((Namira Carter))
  120. [2019-02-17 14:30:09] [Output] : ★ Namira Carter opens the doors of the IMAX theatre as she takes the ladder with her
  121. [2019-02-17 14:30:12] [Output] : ★ setting it up on the outside wall. ((Namira Carter))
  122. [2019-02-17 14:30:15] [Output] : ★ Namira Carter climbs up the ladder as she drills out four holes for the camera mount
  123. [2019-02-17 14:30:18] [Output] : ★ before drilling another hole directly through the wall for the ((Namira Carter))
  124. [2019-02-17 14:30:21] [Output] : ★ ethernet cable. ((Namira Carter))
  125. [2019-02-17 14:30:26] [Output] : ★ Namira Carter gets off the ladder as she sets the drll down, taking hold of
  126. [2019-02-17 14:30:30] [Output] : ★ an IP Camera as she climbs back up the ladder. ((Namira Carter))
  127. [2019-02-17 14:30:34] [Output] : ★ Namira Carter screws the IP camera in place with the electric screwdriver
  128. [2019-02-17 14:30:37] [Output] : ★ as she then plugs its ethernet cable into the camera, pushing ((Namira Carter))
  129. [2019-02-17 14:30:40] [Output] : ★ the other end through the hole into the other side of the wall. ((Namira Carter))
  130. [2019-02-17 14:30:45] [Output] : ★ Namira Carter gets off the ladder as she walks back inside grasping hold
  131. [2019-02-17 14:30:48] [Output] : ★ of the opposite end of the ethernet cable as she guides it ((Namira Carter))
  132. [2019-02-17 14:30:53] [Output] : ★ into the wire tracking and to the POE switch, plugging it in. ((Namira Carter))
  133. [2019-02-17 14:30:59] [Output] : ★ Namira Carter goes back outside as she adjusts the head of the camera,
  134. [2019-02-17 14:31:04] [Output] : ★ before taking hold of the ladder bringing it back inside. ((Namira Carter))
  135. [2019-02-17 14:31:09] [Output] : ★ Namira Carter walks over to one of the corridors as she sets the ladder down
  136. [2019-02-17 14:31:13] [Output] : ★ climbing up it with the drill in her hand as she drills out ((Namira Carter))
  137. [2019-02-17 14:31:16] [Output] : ★ the holes for the camera mount. ((Namira Carter))
  138. [2019-02-17 14:31:20] [Output] : ★ Namira Carter checks the holes are equal depth as she then gets off the
  139. [2019-02-17 14:31:23] [Output] : ★ ladder exchanging the drill for a long ethernet cable. ((Namira Carter))
  140. [2019-02-17 14:31:26] [Output] : ★ Namira Carter plugs the ethernet cable into the camera as she then
  141. [2019-02-17 14:31:29] [Output] : ★ leaves the other side hanging down. ((Namira Carter))
  142. [2019-02-17 14:31:32] [Output] : ★ Namira Carter picks up some more wire tracking as she carefully
  143. [2019-02-17 14:31:35] [Output] : ★ unpeels the adhesive cover, placing the wire tracking ((Namira Carter))
  144. [2019-02-17 14:31:38] [Output] : ★ against the wall afterwards in order for the adhesive ((Namira Carter))
  145. [2019-02-17 14:31:42] [Output] : ★ to stick to the wall. ((Namira Carter))
  146. [2019-02-17 14:31:44] [Output] : ★ Namira Carter then takes hold of the other end of the ethernet cable as she guides
  147. [2019-02-17 14:31:48] [Output] : ★ o the cable through the tracking and over to the POE switch, plugging it in. ((Namira Carter))
  148. [2019-02-17 14:31:52] [Output] : ★ Namira Carter checks that the cable is in the correct port properly as she then picks up
  149. [2019-02-17 14:31:57] [Output] : ★ the drill, grasping the ladder with her left hand as she takes it over to ((Namira Carter))
  150. [2019-02-17 14:32:02] [Output] : ★ another wall. ((Namira Carter))
  151. [2019-02-17 14:32:07] [Output] : ★ Namira Carter sets the ladder down as she carefully goes up 3 steps, her left hand
  152. [2019-02-17 14:32:10] [Output] : ★ holding the ladder as she drills out another four holes. ((Namira Carter))
  153. [2019-02-17 14:32:17] [Output] : ★ Namira Carter releases the trigger on the drill as she climbs back down, putting
  154. [2019-02-17 14:32:21] [Output] : ★ the drill on the floor. ((Namira Carter))
  155. [2019-02-17 14:32:25] [Output] : ★ Namira Carter picks up another camera as she goes up the ladder half way, holding
  156. [2019-02-17 14:32:29] [Output] : ★ the camera in place as she uses an electric screwdriver to ((Namira Carter))
  157. [2019-02-17 14:32:33] [Output] : ★ screw the camera in place, four screws fixed into the wall. ((Namira Carter))
  158. [2019-02-17 14:32:37] [Output] : ★ Namira Carter moves the camera head slightly so it has full view of the area
  159. [2019-02-17 14:32:40] [Output] : ★ before climbing back down to get the ethernet cable for it. ((Namira Carter))
  160. [2019-02-17 14:32:44] [Output] : ★ Namira Carter goes back up the ladder as she pushes the ethernet cable into the port
  161. [2019-02-17 14:32:47] [Output] : ★ of the camera. ((Namira Carter))
  162. [2019-02-17 14:32:54] [Output] : ★ Namira Carter goes down the ladder a couple of steps as she then takes hold of the
  163. [2019-02-17 14:32:57] [Output] : ★ ethernet cable, putting it through the wire tracking on the wall ((Namira Carter))
  164. [2019-02-17 14:33:01] [Output] : ★ before climbing back down. ((Namira Carter))
  165. [2019-02-17 14:33:04] [Output] : ★ Namira Carter then takes hold of the end of the ethernet cable, plugging it into
  166. [2019-02-17 14:33:07] [Output] : ★ the POE switch. ((Namira Carter))
  167. [2019-02-17 14:33:11] [Output] : ★ Namira Carter reaches for her bottle of water as she takes a small sip, rubbing
  168. [2019-02-17 14:33:14] [Output] : ★ her hands afterwards to stretch them out. ((Namira Carter))
  169. [2019-02-17 14:33:21] [Output] : ★ Namira Carter picks up another IP Camera as she walks over to another corner
  170. [2019-02-17 14:33:24] [Output] : ★ of the building, holding it in place to check where it ((Namira Carter))
  171. [2019-02-17 14:33:28] [Output] : ★ would properly sit as she then marks where to drill using ((Namira Carter))
  172. [2019-02-17 14:33:30] [Output] : ★ a pencil. ((Namira Carter))
  173. [2019-02-17 14:33:34] [Output] : ★ Namira Carter puts the camera down as she then picks up the drill, cleaning
  174. [2019-02-17 14:33:38] [Output] : ★ the drill head from plaster dust as she then slowly drills out ((Namira Carter))
  175. [2019-02-17 14:33:40] [Output] : ★ the four holes in the wall. ((Namira Carter))
  176. [2019-02-17 14:33:46] [Output] : ★ Namira Carter checks that the holes are clear as she then puts the drill down
  177. [2019-02-17 14:33:52] [Output] : ★ picking up the camera. ((Namira Carter))
  178. [2019-02-17 14:34:11] [Output] : ★ Namira Carter holds the camera in place as she does up the screws using an
  179. [2019-02-17 14:34:15] [Output] : ★ electric screwdriver, the motor turning clockwise in order ((Namira Carter))
  180. [2019-02-17 14:34:19] [Output] : ★ to drill the screws into place. ((Namira Carter))
  181. [2019-02-17 14:34:23] [Output] : ★ Namira Carter tests that the camera is firmly fixed by lightly pulling it.
  182. [2019-02-17 14:34:28] [Output] : ★ Namira Carter moves the camera head into a better position as she then takes
  183. [2019-02-17 14:34:33] [Output] : ★ hold of an ethernet cable, plugging it into the camera. ((Namira Carter))
  184. [2019-02-17 14:34:37] [Output] : ★ Namira Carter picks up the other end of the ethernet cable as she ensures
  185. [2019-02-17 14:34:40] [Output] : ★ the cable is in the wire tracking on the wall before plugging it in. ((Namira Carter))
  186. [2019-02-17 14:34:44] [Output] : ★ Namira Carter takes hold of the wire tracking covers as she slots the cover
  187. [2019-02-17 14:34:47] [Output] : ★ into place on the wire tracking to cover the ((Namira Carter))
  188. [2019-02-17 14:34:50] [Output] : ★ ethernet cable up around the building. ((Namira Carter))
  189. [2019-02-17 14:36:06] [Output] : ★ Namira Carter takes hold of the ladder as she walks into the server room, setting it up against
  190. [2019-02-17 14:36:17] [Output] : ★ the wall as she takes hold of the drill, slowly climbing up the rungs of the ladder half ((Namira Carter))
  191. [2019-02-17 14:36:18] [Output] : ★ way. ((Namira Carter))
  192. [2019-02-17 14:38:21] [Output] : ★ Namira Carter places the drill head into postion as she starts to drill out four holes
  193. [2019-02-17 14:38:44] [Output] : ★ checking they are clear from plaster dust as she then steps down. ((Namira Carter))
  194. [2019-02-17 14:39:02] [Output] : ★ Namira Carter takes hold of an IP Camera as she climbs up the ladder, an electric screwdriver
  195. [2019-02-17 14:39:05] [Output] : ★ in her right hand. ((Namira Carter))
  196. [2019-02-17 14:39:44] [Output] : ★ Namira Carter holds the camera in place as she then screws it into place with the electric screwdriver
  197. [2019-02-17 14:41:01] [Output] : ★ rotating each screw clockwise into the wall to fix the camera. ((Namira Carter))
  198. [2019-02-17 14:41:45] [Output] : ★ Namira Carter moves the camera head to the left slightly as she then plugs in an ethernet cable
  199. [2019-02-17 14:41:48] [Output] : ★ into the back of it. ((Namira Carter))
  200. [2019-02-17 14:41:57] [Output] : ★ Namira Carter runs the cable along the wall and into the poe switch, using wire tracking
  201. [2019-02-17 14:42:01] [Output] : ★ to keep it up in place. ((Namira Carter))
  202. [2019-02-17 14:43:12] [Output] : ★ Namira Carter plugs the ethernet cable into the POE switch before stepping down.
  203. [2019-02-17 14:43:43] [Output] : ★ Namira Carter walks back over to the power box as she turns the
  204. [2019-02-17 14:43:47] [Output] : ★ power back on. ((Namira Carter))
  205. [2019-02-17 14:43:50] [Output] : ★ Namira Carter logs back into the PC as she goes to the NVR software, inputting
  206. [2019-02-17 14:43:53] [Output] : ★ the IP's of each camera. ((Namira Carter))
  207. [2019-02-17 14:43:55] [Output] : ★ Namira Carter waits for the Camera's to show as online with the footage streaming
  208. [2019-02-17 14:43:59] [Output] : ★ as she then logs into the VPN. ((Namira Carter))
  209. [2019-02-17 14:44:02] [Output] : ★ Namira Carter goes to the Sparta Cloud drive as she creates a new folder called
  210. [2019-02-17 14:44:04] [Output] : ★ IMAX Footage. ((Namira Carter))
  211. [2019-02-17 14:44:08] [Output] : ★ Namira Carter creates an automatic save file on the drive in order for the footage
  212. [2019-02-17 14:44:10] [Output] : ★ to be backed up each day to the sparta server. ((Namira Carter))
  213.  
  214. ---------------------------------------------------------------------------------------------------------------------------------------
  215.  
  216. [2019-02-17 14:44:19] [Output] : ★ Information about the CCTV and Server ((Namira Carter))
  217. [2019-02-17 14:44:22] [Output] : ★ Server is located at Sparta HQ, with back up tapes ((Namira Carter))
  218. [2019-02-17 14:44:25] [Output] : ★ that rotate weekly, in order for backups to be stored. ((Namira Carter))
  219. [2019-02-17 14:44:28] [Output] : ★ Backups are done each night about 6PM where the footage is ((Namira Carter))
  220. [2019-02-17 14:44:30] [Output] : ★ saved from each site onto a backup tape on the server. ((Namira Carter))
  221. [2019-02-17 14:44:35] [Output] : ★ The server then stores the backup for a week before it gets ((Namira Carter))
  222. [2019-02-17 14:44:40] [Output] : ★ overwritten. ((Namira Carter))
  223. [2019-02-17 14:44:46] [Output] : ★ CCTV on site is powered by POE and also has wireless to NVR. ((Namira Carter))
  224. [2019-02-17 14:44:52] [Output] : ★ There is a backup power system in case the power goes down. ((Namira Carter))
  225.  
  226. -------------- MOTION SENSORS, CONTACT SENSORS, ALARM INSTALLATION ------------
  227.  
  228. [2019-02-17 14:45:07] [Output] : ★ Namira Carter sits down on the floor as she unpacks the RING Alarm equipment, which includes
  229. [2019-02-17 14:45:11] [Output] : ★ motion sensors, contact sensors, range extende ((Namira Carter))
  230. [2019-02-17 14:45:14] [Output] : ★ keypad and base alarm station. ((Namira Carter))
  231. [2019-02-17 14:45:18] [Output] : ★ Namira Carter picks up the base station as she walks over to where the
  232. [2019-02-17 14:45:22] [Output] : ★ server is setting down the base station as she then plugs it ((Namira Carter))
  233. [2019-02-17 14:45:24] [Output] : ★ into the power socket, as well as hooking it up to the UPS system. ((Namira Carter))
  234. [2019-02-17 14:45:27] [Output] : ★ Namira Carter then takes hold of the range extender, plugging in the AC adapter
  235. [2019-02-17 14:45:30] [Output] : ★ into the back of it as she then walks to another area of the cinema ((Namira Carter))
  236. [2019-02-17 14:45:35] [Output] : ★ setting it down out of the way as she plugs it into the power socket in the wall. ((Namira Carter))
  237. [2019-02-17 14:45:42] [Output] : ★ Namira Carter reaches for a contact sensor as she seperates the
  238. [2019-02-17 14:45:49] [Output] : ★ magnet and sensor from the bracket, before walking over to the front door. ((Namira Carter))
  239. [2019-02-17 14:45:55] [Output] : ★ Namira Carter lines the bracket up against the door frame to check where it
  240. [2019-02-17 14:45:58] [Output] : ★ would sit before getting out a pencil and marking where to ((Namira Carter))
  241. [2019-02-17 14:46:00] [Output] : ★ screw the mount in. ((Namira Carter))
  242. [2019-02-17 14:46:03] [Output] : ★ Namira Carter picks up the electric screwdriver as she screws in the
  243. [2019-02-17 14:46:07] [Output] : ★ mount, one either side of the door. ((Namira Carter))
  244. [2019-02-17 14:46:10] [Output] : ★ Namira Carter slides the sensor and magnet back into the mount as she pulls
  245. [2019-02-17 14:46:13] [Output] : ★ the door towards her checking that the contact works properly. ((Namira Carter))
  246. [2019-02-17 14:46:17] [Output] : ★ Namira Carter picks up a motion sensor as she peels off the backing from the
  247. [2019-02-17 14:46:20] [Output] : ★ mount, revealing the adhesive underneath. ((Namira Carter))
  248. [2019-02-17 14:46:26] [Output] : ★ Namira Carter sets the mount against the wall, pushing it firmly so that the adhesive sticks to the wall.
  249. [2019-02-17 14:46:38] [Output] : ★ Namira Carter checks that motion sensor is in the mount properly before letting go.
  250. [2019-02-17 14:46:41] [Output] : ★ Namira Carter walks back over to the equipment as she picks up another
  251. [2019-02-17 14:46:46] [Output] : ★ contact sensor, walking to another door as she ((Namira Carter))
  252. [2019-02-17 14:46:52] [Output] : ★ rests the mount over the door frame checking where it would fit. ((Namira Carter))
  253. [2019-02-17 14:46:58] [Output] : ★ Namira Carter slides the magnet and sensor out as she picks up the
  254. [2019-02-17 14:47:01] [Output] : ★ electric screwdriver. ((Namira Carter))
  255. [2019-02-17 14:47:05] [Output] : ★ Namira Carter takes hold of the electric screwdriver as she screws
  256. [2019-02-17 14:47:09] [Output] : ★ both brackets into place, putting the sensor and ((Namira Carter))
  257. [2019-02-17 14:47:12] [Output] : ★ magnet back into position afterwards. ((Namira Carter))
  258. [2019-02-17 14:47:16] [Output] : ★ Namira Carter tests the contact by pulling the door to ensure it
  259. [2019-02-17 14:47:31] [Output] : ★ seperates properly. ((Namira Carter))
  260. [2019-02-17 14:47:34] [Output] : ★ Namira Carter nods as she then reaches for a bottle of water taking a
  261. [2019-02-17 14:47:39] [Output] : ★ small sip before setting it down screwing the lid back in place. ((Namira Carter))
  262. [2019-02-17 14:47:49] [Output] : ★ Namira Carter picks up another motion sensor as she goes over to the
  263. [2019-02-17 14:47:52] [Output] : ★ wall, placing it against it as she checks where ((Namira Carter))
  264. [2019-02-17 14:47:55] [Output] : ★ the best place to put it would be. ((Namira Carter))
  265. [2019-02-17 14:47:59] [Output] : ★ Namira Carter takes hold of the electric screwdriver as she connects it
  266. [2019-02-17 14:48:02] [Output] : ★ to the first screw in the bracket, using it to ((Namira Carter))
  267. [2019-02-17 14:48:05] [Output] : ★ slowly fix the screw into the wall. ((Namira Carter))
  268. [2019-02-17 14:48:08] [Output] : ★ Namira Carter checks the screw is in properly before using the screwdriver
  269. [2019-02-17 14:48:11] [Output] : ★ to screw the other screws into place. ((Namira Carter))
  270. [2019-02-17 14:48:20] [Output] : ★ Namira Carter steps back to ensure the motion detector is in the correct
  271. [2019-02-17 14:48:23] [Output] : ★ position. ((Namira Carter))
  272. [2019-02-17 14:48:27] [Output] : ★ Namira Carter takes hold of another contact sensor as she walks
  273. [2019-02-17 14:48:30] [Output] : ★ up the stairs, placing the contact sensor across ((Namira Carter))
  274. [2019-02-17 14:48:33] [Output] : ★ the door frame, the brackets either side of the door ((Namira Carter))
  275. [2019-02-17 14:48:36] [Output] : ★ as she then screws it into the frame on both sides. ((Namira Carter))
  276. [2019-02-17 14:48:39] [Output] : ★ Namira Carter pulls the doors to ensure they open still as she then
  277. [2019-02-17 14:48:42] [Output] : ★ goes back down the stairs. ((Namira Carter))
  278. [2019-02-17 14:48:46] [Output] : ★ Namira Carter picks up the keypad as she checks how to fix it
  279. [2019-02-17 14:48:49] [Output] : ★ against the wall. ((Namira Carter))
  280. [2019-02-17 14:48:54] [Output] : ★ Namira Carter slides the keypad out of its bracket as she then
  281. [2019-02-17 14:48:58] [Output] : ★ takes hold of the bracket placing it on the wall ((Namira Carter))
  282. [2019-02-17 14:49:01] [Output] : ★ with one hand, the other holding the electric screwdriver ((Namira Carter))
  283. [2019-02-17 14:49:04] [Output] : ★ as she connects it to the first screw on the upper left ((Namira Carter))
  284. [2019-02-17 14:49:07] [Output] : ★ hand side of the bracket. ((Namira Carter))
  285. [2019-02-17 14:49:15] [Output] : ★ Namira Carter slowly screws the screw in place, checking it is in properly
  286. [2019-02-17 14:49:19] [Output] : ★ before screwing in the other three screws, one in each corner of the bracket. ((Namira Carter))
  287. [2019-02-17 14:49:25] [Output] : ★ Namira Carter slides the keypad back into the bracket, seating it properly as
  288. [2019-02-17 14:49:28] [Output] : ★ she then takes hold of the power adapter, plugging it into the ((Namira Carter))
  289. [2019-02-17 14:49:31] [Output] : ★ side of the keypad, and the other end into a power socket ((Namira Carter))
  290. [2019-02-17 14:49:34] [Output] : ★ in the wall. ((Namira Carter))
  291. [2019-02-17 14:49:37] [Output] : ★ Namira Carter removes the tab from the keypad on the side of it, setting
  292. [2019-02-17 14:49:40] [Output] : ★ it to active as she then walks to each part of the RING Alarm ((Namira Carter))
  293. [2019-02-17 14:49:44] [Output] : ★ kit that has been set up, removing the small white tabs from ((Namira Carter))
  294. [2019-02-17 14:49:47] [Output] : ★ them in order to activate them. ((Namira Carter))
  295. [2019-02-17 14:49:50] [Output] : ★ Namira Carter walks over to the base station as she presses the button on the
  296. [2019-02-17 14:49:53] [Output] : ★ back of it, setting it to connect mode as she then goes to the ((Namira Carter))
  297. [2019-02-17 14:49:56] [Output] : ★ range extender pressing the button on the back of it in order to ((Namira Carter))
  298. [2019-02-17 14:49:59] [Output] : ★ connect both of them up. ((Namira Carter))
  299. [2019-02-17 14:50:03] [Output] : ★ Namira Carter takes out her phone as she logs into the RING app, connecting up
  300. [2019-02-17 14:50:05] [Output] : ★ to the base station as she waits for all the devices to show up. ((Namira Carter))
  301. [2019-02-17 14:50:08] [Output] : ★ Namira Carter sets up the keypad pin code, as well as setting up the devices
  302. [2019-02-17 14:50:12] [Output] : ★ settings properly. ((Namira Carter))
  303. [2019-02-17 14:50:27] [Output] : ★ If the sensors are activated the alarm will sound and ((Namira Carter))
  304. [2019-02-17 14:50:29] [Output] : ★ LSPD, Rose Moreno and Namira Carter will be rung. ((Namira Carter))
  305. [2019-02-17 14:50:32] [Output] : ★ Alarm would need /district due to being loud. ((Namira Carter))
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement