Advertisement
aman4029

Untitled

Sep 1st, 2017
82
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
text 5.41 KB | None | 0 0
  1. [2017-09-01 19:07:29] [Output] : ★ Jake Norton drops the dufflebag, as he takes out a power drill
  2. [2017-09-01 19:07:45] [Output] : ★ Jake Norton inspects the camera, as he begins to unscrew the mantle
  3. [2017-09-01 19:08:09] [Output] : ★ Jake Norton pulls the camera off the wall, looking at the wires
  4. [2017-09-01 19:08:27] [Output] : ★ Jake Norton drop sthe camera on the ground, placing a brand new one up against the wall
  5. [2017-09-01 19:08:37] [Output] : ★ Jake Norton matches the wires, as he plugs the into the camera
  6. [2017-09-01 19:08:52] [Output] : ★ Jake Norton grabs some screws, placing them in the holes of the camera mantle
  7. [2017-09-01 19:09:10] [Output] : ★ Jake Norton drills in the screws, one by one, as he shakes the camera to test if it is sturdy
  8. [2017-09-01 19:09:42] [Output] : ★ Jake Norton grabs a ladder, as he places it against the water tank
  9. [2017-09-01 19:09:56] [Output] : ★ Jake Norton climbs onto the tank
  10. [2017-09-01 19:10:35] [Output] : ★ Jake Norton places a camera up against the tower, as he matches the sizes
  11. [2017-09-01 19:10:58] [Output] : ★ Jake Norton drills 4 holes in the wooden mantle, as he matches the holes with the camera
  12. [2017-09-01 19:11:22] [Output] : ★ Jake Norton gets the necessary wires from his duffle, plugging them into the CCTV
  13. [2017-09-01 19:11:41] [Output] : ★ Jake Norton drills the camera in place using the screws and drill, as the cables loosely hang down
  14. [2017-09-01 19:12:23] [Output] : ★ Jake Norton moves on to the next side, as he holds the camera up against the wood, drilling 4 holes
  15. [2017-09-01 19:12:52] [Output] : ★ Jake Norton plugs the power and ethernet cables into the camera, holding it against the wood again
  16. [2017-09-01 19:13:03] [Output] : ★ Jake Norton drills the camera in place using 4 screws, one by one
  17. [2017-09-01 19:13:25] [Output] : ★ Jake Norton pulls down the loose wires from the camera
  18. [2017-09-01 19:13:40] [Output] : ★ Jake Norton moves on the the third side
  19. [2017-09-01 19:13:48] [Output] : ★ Jake Norton dirlls 4 holes using the camera to measure the spots
  20. [2017-09-01 19:14:06] [Output] : ★ Jake Norton gets the cords from his bag, plugging them into the cctv
  21. [2017-09-01 19:14:31] [Output] : ★ Jake Norton holds the camera against the wood, as he drills it in using 4 screws
  22. [2017-09-01 19:14:51] [Output] : ★ Jake Norton moves on to the fourth side, as he grabs the last camera, drilling 4 holes in the wood
  23. [2017-09-01 19:15:08] [Output] : ★ Jake Norton plugs in the ethernet and power cords, as he places the camera against the wood
  24. [2017-09-01 19:15:16] [Output] : ★ Jake Norton gets 4 scrws, drilling the camera into place
  25. [2017-09-01 19:15:39] [Output] : ★ Jake Norton grabs all the wires, as he uses small brackts to lead the along the wooden beams
  26. [2017-09-01 19:15:51] [Output] : ★ Jake Norton leads them down one beam, to the ground
  27. [2017-09-01 19:52:51] [Output] : ★ Jake Norton takes the ladder to the big cabin, as he steps up
  28. [2017-09-01 19:53:16] [Output] : ★ Jake Norton measures the hole placements using the camera mantle, as he drills 4 holes in the wall
  29. [2017-09-01 19:53:40] [Output] : ★ Jake Norton gets the necessary wires, plugging them into the camera, drilling another hole
  30. [2017-09-01 19:53:50] [Output] : ★ Jake Norton leads the wores through the hole, as they hang from the inside
  31. [2017-09-01 19:54:08] [Output] : ★ Jake Norton places the camera gainst the wall, drilling it in place using the 4 screws
  32. [2017-09-01 19:54:18] [Output] : ★ Jake Norton goes back to the water tower
  33. [2017-09-01 19:54:28] [Output] : ★ Jake Norton grabs the shovel given my ledus
  34. [2017-09-01 19:54:46] [Output] : ★ Jake Norton begins to dig around the light bollard
  35. [2017-09-01 19:55:00] [Output] : ★ 5 minutes later the wires would be exposed under the bollard ((Jake Norton))
  36. [2017-09-01 19:55:35] [Output] : ★ Jake Norton grabs the 4 sets of wires that were organized in brackets before, leading the down
  37. [2017-09-01 19:55:58] [Output] : ★ Jake Norton wires in an extension cord into the wiring system
  38. [2017-09-01 19:56:35] [Output] : ★ Jake Norton plugs in the ower wires, as he puts a plastic bag onto it, tieing it, as he throws -
  39. [2017-09-01 19:56:42] [Output] : ★ Jake Norton the dirt back down, concealing the wires
  40. [2017-09-01 19:57:08] [Output] : ★ Jake Norton grabs a siganl box from his duffle, as he places it against the bottom of the tank
  41. [2017-09-01 19:57:33] [Output] : ★ Jake Norton drills 4 holes at the bottom, on a wood beam, as he screws the signal box in using 4 screws
  42. [2017-09-01 19:57:51] [Output] : ★ Jake Norton gets the ethernet wires, plugging them into the sigal box
  43. [2017-09-01 19:58:06] [Output] : ★ the 4 wires would be connected to the signal box, neatly organized ((Jake Norton))
  44. [2017-09-01 20:10:45] [Output] : ★ Jake Norton grabs the last camera from the duffle, as he brings it against the wall
  45. [2017-09-01 20:11:03] [Output] : ★ Jake Norton uses the power drill to drill 4 holes, blowing away the sawdust
  46. [2017-09-01 20:11:21] [Output] : ★ Jake Norton holds the camera gainst the wall, placing 4 screws into the holes
  47. [2017-09-01 20:11:28] [Output] : ★ Jake Norton drills them into place
  48. [2017-09-01 20:12:04] [Output] : ★ Jake Norton plugs the necessary cables in, as he drills 4 more holes for the signal box
  49. [2017-09-01 20:12:20] [Output] : ★ Jake Norton gets 4 screws, as he drills the signal box into place, lugging the wires in
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement