Advertisement
Not a member of Pastebin yet?
Sign Up,
it unlocks many cool features!
- == 125 ==
- - Removed: Griswold between Fort and Michigan (required split of Griswold at Fort, affecting all routes on it)
- - Added: Fort between Junction and West End (required split of Fort at West End)
- - Corrected: Taylor Meijer construction finished - stop returned to normal position; routing changed accordingly
- - Corrected: Metro Airport North Terminal - Routes 125 and 280 stay on International Drive instead of making the slight right onto Arrivals Traffic
- -- Rouge River Bridge Detour --
- Corrected: Entire detour moved to new route as of July 12th 2013 - this was never fixed on OSM until now
- == 160 ==
- - Corrected: Taylor Meijer construction finished - stop returned to normal position; routing changed accordingly
- == 275 ==
- - Corrected: Taylor Meijer construction finished - stop returned to normal position; routing changed accordingly
- == 280 ==
- - Corrected: Metro Airport North Terminal - Routes 125 and 280 stay on International Drive instead of making the slight right onto Arrivals Traffic
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement