  1. Addendum 2) Anderson Electrical Construction 3-05-14
  2. 1) Master Bathroom subfloor repair/remodel @ 629 Josilane, Modesto, Ca. 95351
  3. a)Demo:Remove toilet & all bathroom accessories, vinyl flooring, underlayment & drywall
  4. in all affected areas of toilet, shower, vanity & closet areas.
  5. Dump all debris.(save toilet&vanity for re-use)
  6. Inspect subflooring, floor joists, all exposed framing, plumbing & drywall to determine
  7. all sources of water damage.
  8. Results:found damage due to roof leaks @ shower & closet perimeter walls & vanity @ firewallaa
  9. adjacent to garage.Found shower tile & framing damage due to a)leaking shower valves &
  10. b)improperly installed showerhead spraying directly inside shower wall because no gasketed
  11. trim ring was present. Also toilet flange & seal were leaking due to compromised underlayment
  12. & subfloor (this condition was also due in part to the leaks that were found in the hall bath,
  13. thereby compounding the problem). All of the above items caused damage to the subfloor & the
  14. structural framing beneath the floor.
  15. b)Replace structural members & damaged subflooring. Replace worn shower valves. Provide new framing
  16. @ doorway to shower area, door jamb & along shower wall.Replace missing tiles, regrout & seal shower
  17. walls.
  18. c)R&R drywall @ vanity wall. Move GFCI location to allow for vanity install. Install new wp drywall
  19. @ toilet & shower walls-also @ shower wall @ closet, tape, float & texture all walls as required.
  20. d)Prep, prime & paint entire bathroom, vanity area & closet. Install GFI, vanity light(retrofit)&
  21. new SP switching for toilet & vanity area.
  22. e)Install new underlayment throughout entire bathroom & adjoining surfaces(seal & level). Install
  23. Hardi-backer cement board & ready for tile.
  24. f)Install floor tile & tile base, grout & seal. Re-install toilet/ new water line, shut-off valve
  25. & wax ring. Install new vanity/ new shut-off valves, supply lines & new lav faucet & door knobs
  26. as per install requirements. Install new showerhead arm, showerhead, and sealing trim ring.
  27. Re-install vanity mirror. Caulk & seal all appropriate surfaces. Install all finished bathroom
  28. accessories-towl rack, toilet paper dispenser, etc.
  29.  
  30.  
  31.  
  32.  
  33. Steven A. Anderson
  34. Anderson Electrical Construction