Advertisement
Not a member of Pastebin yet?
Sign Up,
it unlocks many cool features!
- public async void Template6()
- {
- Sections group6 = new Sections
- {
- desc = "Process Control"
- };
- Sections group61 = new Sections
- {
- desc = "Processes are documented and quality procedures have been developed and implemented within manufacturing operations."
- };
- Sections group611 = new Sections
- {
- desc = "Documented process and quality instruction procedures, including applicable standards, are located at work stations and reflect current practices."
- };
- Sections group612 = new Sections
- {
- desc = "Sampling plans are utilized as a part of the quality inspection plan."
- };
- Sections group613 = new Sections
- {
- desc = "Quality inspection sampling plans utilize acceptance criteria targeted at zero defects."
- };
- Sections group614 = new Sections
- {
- desc = "All instruction procedures are controlled documents and are signed off by appropriate personnel."
- };
- Sections group615 = new Sections
- {
- desc = "A formal procedure exists, which details the responsibility for procedure development and approval processes."
- };
- Sections group616 = new Sections
- {
- desc = "All written instruction procedures are routinely reviewed for application of processing methods and accuracy of quality requirements."
- };
- Sections group62 = new Sections
- {
- desc = "There are procedures for controlling manufacturing process changes."
- };
- Sections group621 = new Sections
- {
- desc = "Manufacturing process changes are documented on all key operations."
- };
- Sections group622 = new Sections
- {
- desc = "Process change procedure breaks responsibility down to affected department responsibility level."
- };
- Sections group623 = new Sections
- {
- desc = "Process F.M.E.A.'s (Failure Mode & Effects Analysis) are reviewed and updated for changes made to key operations."
- };
- Sections group624 = new Sections
- {
- desc = "Evaluation studies for quality specifications are required on process changes made to key operations."
- };
- Sections group625 = new Sections
- {
- desc = "All process changes are documented, reviewed, and approved by appropriate personnel before change is made."
- };
- Sections group626 = new Sections
- {
- desc = "All manufacturing process changes are promptly communicated to customer."
- };
- Sections group627 = new Sections
- {
- desc = "New processes are not implemented without customer knowledge and approval."
- };
- Sections group63 = new Sections
- {
- desc = "Control plans are developed which detail quality planning activities required to ensure conformance to quality requirements."
- };
- Sections group631 = new Sections
- {
- desc = "Supplier control plans satisfy customer driven quality requirements."
- };
- Sections group632 = new Sections
- {
- desc = "Control plans have been developed on all customer material."
- };
- Sections group633 = new Sections
- {
- desc = "Process instruction procedures agree with control plan."
- };
- Sections group634 = new Sections
- {
- desc = "Control plans are controlled documents."
- };
- Sections group635 = new Sections
- {
- desc = "Authority to stop the manufacturing process in the case of non-conforming product is defined."
- };
- Sections group636 = new Sections
- {
- desc = "Control plans are actively used throughout all operations and have been developed on 100% of key process operations."
- };
- Sections group637 = new Sections
- {
- desc = "Supplier utilizes control plan for quality planning activities on new and change processes."
- };
- Sections group638 = new Sections
- {
- desc = "Control plans are routinely reviewed for effectiveness and updated as required."
- };
- Sections group64 = new Sections
- {
- desc = "In-process quality expected to be achieved through superior process controls."
- };
- Sections group641 = new Sections
- {
- desc = "Consistently meets/exceeds quality goal."
- };
- Sections group642 = new Sections
- {
- desc = "Deficient processes are immediately identified and actions implemented for improvement."
- };
- Sections group643 = new Sections
- {
- desc = "Quality goals are regularly reviewed and supported by top management."
- };
- Sections group644 = new Sections
- {
- desc = "Annual quality goals are revised by top management."
- };
- Sections group645 = new Sections
- {
- desc = "SPC is used for in-process inspection."
- };
- Sections group65 = new Sections
- {
- desc = "Manufacturing quality systems achieved through Total Quality Control philosophies."
- };
- Sections group651 = new Sections
- {
- desc = "Uses SPC or other effective processes to control manufacturing processes."
- };
- Sections group652 = new Sections
- {
- desc = "Proactively implements effective quality and reliability programs."
- };
- Sections group653 = new Sections
- {
- desc = "Operates under total quality control principles, including validation."
- };
- Sections group654 = new Sections
- {
- desc = "All processes documented."
- };
- Sections group655 = new Sections
- {
- desc = "Supplier evaluates equipment for capability."
- };
- Sections group66 = new Sections
- {
- desc = "A preventive maintenance program has been documented and implemented."
- };
- Sections group661 = new Sections
- {
- desc = "Plant wide preventive maintenance program is in place and operational."
- };
- Sections group662 = new Sections
- {
- desc = "Preventive maintenance "procedures" are available which were supplied from the original equipment manufacturer or have been developed if not available."
- };
- Sections group663 = new Sections
- {
- desc = "Complete preventive maintenance and repair records are readily available for all process equipment."
- };
- Sections group664 = new Sections
- {
- desc = "Records indicate that high wear parts, for critical processes, are kept in stock."
- };
- Sections group665 = new Sections
- {
- desc = "Preventive maintenance program is reviewed on a routine basis and includes the effects of process changes."
- };
- Sections group666 = new Sections
- {
- desc = "Where necessary, preventive maintenance is concluded with a process capability study to verify conformance."
- };
- Sections group667 = new Sections
- {
- desc = "Preventive maintenance program is structured and performed based on time requirements."
- };
- group6.Add(group61);
- group6.Add(group62);
- group6.Add(group63);
- group6.Add(group64);
- group6.Add(group65);
- group6.Add(group66);
- group61.Add(group611);
- group61.Add(group612);
- group61.Add(group613);
- group61.Add(group614);
- group61.Add(group615);
- group61.Add(group616);
- group62.Add(group621);
- group62.Add(group622);
- group62.Add(group623);
- group62.Add(group624);
- group62.Add(group625);
- group62.Add(group626);
- group62.Add(group627);
- group63.Add(group631);
- group63.Add(group632);
- group63.Add(group633);
- group63.Add(group634);
- group63.Add(group635);
- group63.Add(group636);
- group63.Add(group637);
- group63.Add(group638);
- group64.Add(group641);
- group64.Add(group642);
- group64.Add(group643);
- group64.Add(group644);
- group64.Add(group645);
- group65.Add(group651);
- group65.Add(group652);
- group65.Add(group653);
- group65.Add(group654);
- group65.Add(group655);
- group66.Add(group661);
- group66.Add(group662);
- group66.Add(group663);
- group66.Add(group664);
- group66.Add(group665);
- group66.Add(group666);
- group66.Add(group667);
- await connection.InsertWithChildrenAsync(group6, recursive: true);
- }
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement