Advertisement
misolutions

hasil data summary

Jul 12th, 2021
1,128
0
Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
HTML 12.14 KB | None | 0 0
  1. EXECUTIVE_SUMMARY                                                                                                                                                                                                                                              |
  2. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+
  3.                                                                                                                                                                                                                                                                |
  4. Industrialized Building System (IBS) is a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. IBS has been ide|
  5.                                                                                                                                                                                                                                                                |
  6. [CLOB]                                                                                                                                                                                                                                                         |
  7. <em style="mso-bidi-font-style:normal"><span lang="MS" style="font-size:10.0pt;font-family:&quot;Arial&quot;,&quot;sans-serif&quot;;mso-fareast-font-family:¶&quot;Times New Roman&quot;;mso-ansi-language:MS;mso-fareast-language:EN-US;mso-bidi-language:¶AR-|
  8. [CLOB]                                                                                                                                                                                                                                                         |
  9. [CLOB]                                                                                                                                                                                                                                                         |
  10. <!--[if gte mso 9]><xml>¶ ¶  Normal¶  0¶  ¶  ¶  ¶  ¶  false¶  false¶  false¶  ¶  EN-US¶  X-NONE¶  X-NONE¶  ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶  ¶  ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶   ¶  ¶</xml><![endif]--><p>Tension stiffening is an imp|
  11. <p>Building Information Modeling (BIM) is increasingly being implemented in the construction industry in order to produce data rich models of buildings and structures. BIM has being introduced in the Malaysian construction industry by the Public Work Depa|
  12. <p>Flooding are regular natural events in Malaysia which happened nearly every year during the monsoon season. It affects the population, area and socio economic of the communities. It is argued that the lack of understanding among communities about flood|
  13. <p>Extraction process of oil from palm fruit at mills will produce waste material such as shell, fiber and empty fruit bunches. Oil Palm Shell (OPS) can be used to replace aggregate in concrete mixture (Mannan &amp; Ganapathy, 2004) and was proven by the |
  14. <p>Analysis of progressive collapse is purposely to investigate the response of structures to sustain the propagation of damage once a vertical support component has failed by extreme load effect. A sudden removal of support scenario or known as alternate|
  15. <p>Disaster management involves an organisation and management of resources and responsibilities for dealing with all humanitarian aspects of emergencies particularly in disaster preparedness, response and recovery to minimise the impact of disasters. Com|
  16. <p>Analysis of progressive collapse is purposely to investigate the response of structure to sustain the propagation of damage once a vertical support component has failed by the effect of extreme load. A sudden removal of support scenario or known as Alt|
  17. <p>Flash flood risk management on construction sites and its surrounding areas requires environmental information that is concise, to-the-point, timely and usable. However, physical surveillance to support the initiatives is challenging, time consuming, l|
  18. <p>Para pelajar yang diterima masuk kedalam program yang ditawarkan oleh universiti merupakan pelajar yang cemerlang ketika zaman persekolahan mereka. Tetapi, prestasi akademik mereka &nbsp;menjadi sebaliknya disebabkan oleh pelbagai faktor. Bagi membantu|
  19. <p>The progressive collapse of a structure occurs when local failure of a primary structural component leads to the collapse of adjoining members which in turn leads to further collapse through a chain reaction. Often the total damage is disproportionate |
  20. <p>Environmental surveillance on construction sites requires environmental information<br />¶that is concise, to-the-point, timely and usable. However, physical surveillance and<br />¶traditional environmental monitoring (measurement) are challenging, tim|
  21. <p>Developing flood prediction and early warning system by implementing new technologies leads to an innovative system, which is more effective than the conventional ones, that the citizens and related government agencies can rely on. Existing flood early|
  22. <p>Sustainable construction approaches addressed sustainable design, green materials and construction technologies in all construction phases to meet sustainable development goals. The progress of sustainable construction project is also supported from th|
  23. <p>Occupational Safety and Health Management System (OSHMS) can be defined as a coordinated and systematic approach to manage safety and health risks. The study investigates the current practice of OSHMS in public higher educational institutions in Malays|
  24. <p>Analysis of progressive collapse is purposely to investigate the response of structures to sustain the propagation of damage once a vertical support component has failed by extreme load effect. A sudden removal of support scenario or known as alternate|
  25. <p>In muddy coastal environments, trees can serve as coastal defence structures which is one of natural protection to the ecology of coast area from erosion and sand movement. However wave impact may contribute to the removal of the mangroves and other tr|
  26. <p>Construction industry are becoming more complex and dynamic. The emergence of disruptive technologies, (Building Information Modelling (BIM), and VR) couple with the sustainable construction and the industrialised building system (IBS) approaches, chan|
  27.                                                                                                                                                                                                                                                                |
  28. <p>Putrajaya Holdings Sdn. Bhd., a subsidiary company of Petroliam Nasional Berhad (PETRONAS) is the master developer of Malaysia&#39;s administrative capital of Putrajaya. The company was incorporated on 19 October 1995 with one of the aims to implement |
  29. <p>The humanitarian aid distribution process is one of important activity in giving and helping the disaster victims in terms of need, shelter, and medical treatment during and after a disaster. Many stakeholders will respond during disaster occurrence es|
  30. <p>Sustainable construction approaches addressed sustainable design, green materials and construction technologies in all construction phases to meet sustainable development goals. The progress of sustainable construction project is also supported from th|
  31. <p>Bond stress slip behaviour between reinforcement bar and surrounding concrete is vital in predicting the deflection of reinforced concrete member. The bond stress slip which refers to the shear stress that can be transferred between the reinforcing bar|
  32. Many studies have argued that flood disaster management in Malaysia has been over-focused on a top-down government-centralized approach and this approach seems to be ineffective during the event of flood. A top-down system is likely to be a reactive appro|
  33. <p>Construction industry in Malaysia has moved forward into a technology driven where a transition is in progress from conventional method to a more advanced and mechanised system known as the Industrialised Building System (IBS). However, the need to imp|
  34. <p>An Innovation Nation is about providing the Nation and its people with the skills, knowledge and competencies required to overcome problems, challenges or obstacles, creating long term sustainability for the enduring development of a country and improv|
  35. <p>The ASEAN countries contain some of the most disaster-prone communities in the world. The region has become more aware of the need for good disaster management systems. In 2016 a regional framework for disaster management was launched. A coordinated re|
  36. <p>Ordinary Portland concrete is widely used as a construction material in the world. However, one of the disadvantages of this concrete is the high emission of carbon dioxide associated with the production of Ordinary Portland cement which is utilized as|
  37. <p>Facilities Management Executives face ever-growing pressure to improve the efficiency of their estates especially in terms of addressing the environmental issues. For instance, buildings (as well as built environment) are one of the major CO2 emitters |
  38. <p>Ordinary Portland concrete is widely used as a construction material in the world. However, one of the disadvantages of this concrete is the high emission of carbon dioxide associated with the production of Ordinary Portland cement which is utilized as|
  39.                                                                                                                                                                                                                                                                |
  40. <p>Facilities Management Executives face ever-growing pressure to improve the efficiency of their estates especially in terms of addressing the environmental issues. For instance, buildings (as well as built environment) are one of the major CO2 emitters |
  41. <p>The built environment sector in Malaysia is inundated with debate on the what, why and how of building information modelling (BIM) implementation in operation and maintenance of a building. The usage of BIM technology is suggested to increase the effic|
  42. &lt;p&gt;Buildings in Malaysia have evolved to be more sophisticated in design and functionality. Building’s operation and maintenance is very important in facilities management activities.&#160; However, building&#39;s operation and maintenance phases ar|
  43. <p>Geopolymer concrete is currently utilized in construction industry as its application in reducing carbon footprint. Most of researches in geopolymer concrete (GPC) is focusing on the materials properties and its contribution to the construction materia|
  44. <p>The frequency of reported work-related Musculoskeletal Disorders (MSDs) injuries is seen to be rapidly increasing in Malaysia. According to the annual statistic report by Social Security Organization (SOCSO), MSDs is found to be one of the most common |
  45.                                                                                                                                                                                                                                                                |
  46. <p>The industries in Malaysia are entering a period of major disruption caused by new technologies such as Artificial Intelligent, Robotics, Blockchain, Nanotechnology as well as Building Information Modelling (BIM) and Internet of Things (IoT). In this f|
  47.                                                                                                                                                                                                                                                                |
  48. <p>The industries in Malaysia are entering a period of major disruption caused by new technologies such as Artificial Intelligent, Robotics, Blockchain, Nanotechnology as well as Building Information Modelling (BIM) and Internet of Things (IoT). In this f|
Advertisement
Add Comment
Please, Sign In to add comment
Advertisement