SHARE
TWEET

CSC 350 - Chapter 8

SixtyGig Sep 23rd, 2019 (edited) 103 Never
Not a member of Pastebin yet? Sign Up, it unlocks many cool features!
  1. 1. https://gyazo.com/02953de25deeafd5837d4be381a554a4
  2.    https://gyazo.com/61b7e790653329b9ac1c4b580d690dca
  3.  
  4. 2. Example 1: https://gyazo.com/88b08be5a0b774a8048923a276ff2aae
  5.    Example 2: https://gyazo.com/14452fa0e78984ae0601d8d8e3da26d2
  6.    Example 3: https://gyazo.com/64d229e620c130fbdb9f76bd3bb8e8e6
  7.  
  8. 3. Adding "--numQueues = 1" would allow the scheduler to perform in a Round Robin fashion.
  9.  
  10. 4. https://gyazo.com/89eb9bfd0ea20684c7b4313d014649b7
  11.    From Time 0 to 200, Job #0 runs for "200 units" of time (not sure what unit), while Job #1 runs for "2 units" of time.
  12.    In this case, Job #0 takes up most (99%) of the CPU time.
  13.  
  14. 5. It will take 200ms.
  15.  
  16. 6. (For reference, I'm comparing A to B) - I tried to get everything on one page...sorry about the tiny font in these!
  17.    A: https://gyazo.com/87bb5d8aeddf5de9f1d8b8296741b52c
  18.    B: https://gyazo.com/9e2c6f94eba5e3e7fdd2628c9c8de583
  19.    When I added the "-I" flag, it places the job on the list head AS SOON AS I/O has completed.
  20.    Another note, the second job was unable to run until the first one had fully completed.
RAW Paste Data
We use cookies for various purposes including analytics. By continuing to use Pastebin, you agree to our use of cookies as described in the Cookies Policy. OK, I Understand
Not a member of Pastebin yet?
Sign Up, it unlocks many cool features!
 
Top